


Under Construction
Possession : Dec 2027
Under Construction
Possession : Dec 2027
0.8 Cr Onwards
Bopal, Ahmedabad
By DR Infrastructure
0.8 Cr Onwards
Configuration
3 BHK
Builtup area
1,790 sq ft
Avg. Price
5.4K/sq.ft
Possession Status
Under Construction
Possession Start Date
December 2027
Launch Date
August 2023
Status
Under Construction
Total Launched Apartments
261
Total Area
2.3 Acres
Availability
New
Flooring
Toilets:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Kitchen:
Vitrified Tiles
Others
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Lobby:
Vitrified Tiles
Windows:
Aluminium Sliding Windows
Wiring:
Three Face Electrical Supply with Concealed MCB Copper Wiring
Switches:
Modular switches
24X7 Water Supply
Full Power Backup
Lift(s)
Gazebo
Mini Theatre
Terrace Garden
Yoga/Meditation Area
Senior Citizen Sitout
Barbecue Area
Multipurpose Hall



Anuradha Society
1.84 Km
Anuradha Society
1.85 Km
Anuradha Society Bus Stop - Bopal
1.86 Km
Anuradha Society Bus Stop - Bopal
1.87 Km
Vidhya Sagar High School
1.89 Km

Bopal, Ahmedabad
DR Infrastructure
₹ 0.8 Cr – ₹ 0.8 Cr
3 BHK
1,790 sq.ft
3 BHK
846 - 852 sq.ft
3 BHK
793 - 899 sq.ft
Dec ‘27

Total Projects
4
Ongoing Projects
2
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love