


Under Construction
Possession : May 2029
Under Construction
Possession : May 2029
0.6 Cr Onwards
Chikkagubbi on Hennur Main Road, Bangalore
By DNR Group
0.6 Cr Onwards
Configuration
1, 2, 3, 4 BHK
Builtup area
656 - 2,491 sq ft
Avg. Price
9.0K
Possession Status
Under Construction
Possession Start Date
May 2029
Launch Date
June 2023
Status
Under Construction
Availability
New
Flooring
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Toilets:
Vitrified Tiles
Others
Windows:
Aluminium Sliding
Wiring:
Concealed Copper Wiring with Adequate Points
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Dining
Points:
Kitchen
Points:
Hall
Switches:
Modular electrical switches
Frame Structure:
Earthquake resistant RCC framed structure
24X7 Water Supply
Fire Sprinklers
Full Power Backup
Gymnasium
Swimming Pool
Children's play area
Club House
Intercom
Lift(s)
CCTV



Chikkagubbi Bus Stop
0.41 Km
Byrathi Bande Bus Stop
0.50 Km
Byrathi Bande Bus Stop
0.50 Km
Byrathi Bande
0.63 Km
Chikkagubbi Cross
0.64 Km

Chikkagubbi on Hennur Main Road, Bangalore
DNR Group
₹ 0.6 Cr – ₹ 2.2 Cr
1,2,3,4 BHK
656 - 2,491 sq.ft
2,3 BHK
934 - 1,245 sq.ft
3,4 BHK
3,172 - 4,858 sq.ft
May ‘29

Total Projects
12
Ongoing Projects
5
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love