


Under Construction
Possession : Dec 2026
Under Construction
Possession : Dec 2026
1.0 Cr Onwards
Krishnarajapuram, Bangalore
By Pavani
1.0 Cr Onwards
Configuration
2, 3, 4 BHK
Builtup area
844 - 1,560 sq ft
Avg. Price
9.0K
Possession Status
Under Construction
Possession Start Date
December 2026
Launch Date
January 2024
Status
Under Construction
Total Launched Apartments
379
Total Area
4.58 Acres
Availability
New
Flooring
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Ceramic Tiles
Others
Wiring:
Concealed Copper Wiring with Adequate Points
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Kitchen
Switches:
Modular electrical switches
Frame Structure:
Earthquake resistant RCC framed structure
Waiting Lounge
Mini Theatre
Party Lawn
Reading Lounge
Opera House
Steam Room
Terrace Garden
Yoga/Meditation Area
Reflexology Park
Security Cabin



Shell Petrol Bank
0.05 Km
Shell Petrol Bank
0.05 Km
Shell Petrol Pump
0.06 Km
Shell Petrol Pump
0.09 Km
Seegehalli Gate
0.44 Km

Krishnarajapuram, Bangalore
Pavani
₹ 1.0 Cr – ₹ 1.9 Cr
2,3,4 BHK
844 - 1,560 sq.ft
2,3,4 BHK
1,050 - 2,400 sq.ft
3,4 BHK
1,335 - 2,400 sq.ft
Dec ‘26

Years of experience
32
Total Projects
30
Ongoing Projects
5
Pavani Group is one of the leading names in the real estate sector. The group was founded in 1995. It is led by P.V. Raghava Rao. Total number of projects completed are 14. The projects are designed keeping in mind the needs of the coming generations. The group has a
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love