
Completed
Possession : May 2024
Completed
Possession : May 2024
₹ 0.8 Cr Onwards
Mandur, Bangalore
By MSP Group
₹ 0.8 Cr Onwards
Configuration
3 BHK
Builtup area
1,200 sq ft
Avg. Price
23.4K/sq.ft
Possession Status
Completed
Possession Start Date
May 2024
Launch Date
September 2023
Status
Completed
Total Launched Apartments
32
Availability
New
Flooring
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Ceramic Tiles
Others
Wiring:
Concealed Copper Wiring with Adequate Points
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Kitchen
Switches:
Modular electrical switches
Frame Structure:
Earthquake resistant RCC framed structure
Car Parking
24X7 Water Supply
Rain Water Harvesting
Gated Community
24 X 7 Security
CCTV
Intercom
Full Power Backup
Internal Roads
Sewage Treatment Plant

Mandur Bus Stop
0.51 Km
Mandur Bus Stop
0.52 Km
Mandooru
0.73 Km
Mandooru
0.75 Km
Swami Vivekananda College of Nursing Bus Stop
0.75 Km

Mandur, Bangalore
MSP Group
₹ 0.8 Cr – ₹ 0.8 Cr
₹ 9.3 Cr – ₹ 16.6 Cr
₹ 3.2 Cr – ₹ 4.2 Cr
3 BHK
1,200 sq.ft
3,5 BHK
3,4 BHK
May ‘24
Nov ‘28
Sept ‘28

Total Projects
7
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love