


Under Construction
Possession : Nov 2025
Under Construction
Possession : Nov 2025
4.0 Cr Onwards
Marathahalli, Bangalore
By Divyasree Infrastructure Projects
4.0 Cr Onwards
Configuration
3, 4, 5 BHK
Builtup area
1,850 - 5,148 sq ft
Avg. Price
9.0K
Possession Status
Under Construction
Possession Start Date
November 2025
Launch Date
December 2022
Status
Under Construction
Total Launched Apartments
124
Total Area
2.42 Acres
Availability
New
Flooring
Balcony:
Wooden Flooring
Living/Dining:
Vitrified Tiles
Other Bedroom:
Wooden in all bedrooms
Kitchen:
- Vitrified flooring
Master Bedroom:
Imported Marble
Toilets:
Imported Marble
Walls
Interior:
Acrylic Emulsion Paint
Toilets:
Ceramic Tiles
Kitchen:
Ceramic Tiles
Exterior:
Asian Paint
Fire Escape Staircases
Piped Gas Connection
Terrace Garden
Entrance Lobby
Club House
Swimming Pool
Gymnasium
Closed Car Parking
24X7 Water Supply
Fire Fighting System



Innovative Multiplex Bus Stop
0.76 Km
Innovative Multiplex Bus Stop
0.76 Km
Indian Oil Petrol Pump
0.78 Km
Indian Oil Petrol Bunk
0.79 Km
IOC - Amar Service Station
0.79 Km

Marathahalli, Bangalore
Divyasree Infrastructure Projects
₹ 4.0 Cr – ₹ 11.0 Cr
3,4,5 BHK
1,850 - 5,148 sq.ft
3,4,5,6 BHK
1,850 - 5,055 sq.ft
4,5 BHK
5,863 - 7,618 sq.ft
Nov ‘25

Total Projects
1
Ongoing Projects
1
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love