


Launch
Possession : Aug 2025
Launch
Possession : Aug 2025
₹ 0.5 Cr Onwards
Tamando, Bhubaneswar
By Shree Sidhi Vinayak Buildcon
₹ 0.5 Cr Onwards
Configuration
2 BHK
Builtup area
845 - 986 sq ft
Possession Status
Launch
Possession Start Date
August 2025
Launch Date
May 2024
Status
Launch
Total Launched Apartments
4
Availability
New
Others
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Dining
Points:
Kitchen
Points:
Hall
Windows:
Aluminium Powder Coated Windows
Wiring:
Concealed copper wiring
Switches:
Modular switches
Frame Structure:
Earthquake resistant RCC framed structure
Walls
Toilets:
Ceramic Tiles
Exterior:
Weather proof paint
Kitchen:
Ceramic Tiles
Interior:
Putty on Walls
Car Parking
24X7 Water Supply
24 X 7 Security
24x7 CCTV Surveillance
Intercom
Lift(s)
Partial Power Backup
DG Availability


Indian Oil
0.59 Km
HP PETROL PUMP - GURUNANAK SERVICE STN
1.31 Km
Hindustan Petroleum Corporation Ltd.
1.31 Km
Gurunanak HP Service Station
1.31 Km
Tamando-Khurda Bus Stop
1.33 Km

Tamando, Bhubaneswar
Shree Sidhi Vinayak Buildcon
₹ 0.5 Cr – ₹ 0.5 Cr
₹ 0.9 Cr – ₹ 0.9 Cr
₹ 0.8 Cr – ₹ 1.1 Cr
2 BHK
845 - 986 sq.ft
2 BHK
2,3 BHK
Aug ‘25
Jan ‘26
Mar ‘27

Total Projects
7
Ongoing Projects
1
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love