
Under Construction
Possession : Jul 2025
Under Construction
Possession : Jul 2025
₹ 1.0 Cr Onwards
Chromepet, Chennai
By Prop B Construction
₹ 1.0 Cr Onwards
Configuration
2 BHK
Builtup area
1,250 sq ft
Avg. Price
5.0K/sq.ft
Possession Status
Under Construction
Possession Start Date
July 2025
Launch Date
March 2024
Status
Under Construction
Total Launched Apartments
6
Availability
New
Flooring
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Others
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Dining
Points:
Kitchen
Points:
Hall
Wiring:
Concealed copper wiring
Frame Structure:
RCC framed structure
Switches:
Modular switches
24X7 Water Supply
Fire Sprinklers
Full Power Backup

Indian Oil
0.45 Km
Indian Oil
0.45 Km
Ponds Bus Stop
0.51 Km
Ponds Bus Stop
0.51 Km
Shell Select Petrol Station
0.61 Km

Chromepet, Chennai
Prop B Construction
₹ 1.0 Cr – ₹ 1.0 Cr
₹ 0.6 Cr – ₹ 0.9 Cr
Price on Request
2 BHK
1,250 sq.ft
2,3 BHK
2,3 BHK
Jul ‘25
Feb ‘22
Sept ‘14

Total Projects
6
Ongoing Projects
3
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love