


Under Construction
Possession : Jul 2026
Under Construction
Possession : Jul 2026
0.9 Cr Onwards
Sholinganallur, Chennai
By DRA Group
0.9 Cr Onwards
Configuration
2, 3 BHK
Builtup area
1,058 - 1,579 sq ft
Avg. Price
6.8K
Possession Status
Under Construction
Possession Start Date
July 2026
Launch Date
September 2021
Status
Under Construction
Total Launched Apartments
111
Total Area
1.27 Acres
Availability
New
Walls
Exterior:
Acrylic Paint
Interior:
Acrylic Emulsion Paint
Toilets:
Ceramic Tiles
Kitchen:
Ceramic Tiles
Others
Points:
Master Bedroom
Points:
Other Bedroom
Windows:
Aluminium Sliding Windows
Wiring:
Concealed copper wiring
Frame Structure:
RCC framed structure
Switches:
Modular switches
24X7 Water Supply
Fire Sprinklers
Full Power Backup
Gymnasium
Children's play area
Lift(s)
CCTV
Chess Board
Football Field
Yoga/Meditation Area



Sholinganallur Bus Stop
0.20 Km
Sholinganallur Bus Stop
0.20 Km
Sholinganallur Bus Stop
0.20 Km
Shozhanganallur
0.23 Km
Pratyangira Temple
0.24 Km

Sholinganallur, Chennai
DRA Group
₹ 0.9 Cr – ₹ 1.3 Cr
2,3 BHK
1,058 - 1,579 sq.ft
3,4 BHK
1,726 - 5,054 sq.ft
2,3 BHK
1,073 - 1,547 sq.ft
Jul ‘26

Years of experience
48
Total Projects
14
Ongoing Projects
4
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love