
Under Construction
Possession : Jul 2026
Under Construction
Possession : Jul 2026
Tirupati, Chittoor
By Sri Padmavathi Developers
Configuration
2, 3 BHK
Builtup area
727 - 1,049 sq ft
Possession Status
Under Construction
Possession Start Date
July 2026
Launch Date
October 2023
Status
Under Construction
Availability
New
Flooring
Balcony:
Vitrified Tiles
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Toilets:
Vitrified Tiles
Master Bedroom:
Vitrified Flooring
Other Bedroom:
Vitrified Tiled Flooring
Others
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Dining
Points:
Kitchen
Points:
Hall
Wiring:
Concealed copper wiring
Windows:
UPVC windows
Frame Structure:
RCC framed structure
Switches:
Modular switches

Railway Station Bus Stop
0.03 Km
Krishnapuram Tanna Bus Stop
0.53 Km
Sri Ramachandra Pushkarani Bus Stop
0.58 Km
Central Bus Stand
0.66 Km
Maruthi Nagar Bus Stop
0.74 Km

Total Projects
1
Ongoing Projects
1
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love