


Under Construction
Possession : Dec 2025
Under Construction
Possession : Dec 2025
0.5 Cr Onwards
Jalukbari, Guwahati
By Agrim Infraproject
0.5 Cr Onwards
Configuration
3 BHK
Builtup area
1,160 - 1,420 sq ft
Possession Status
Under Construction
Possession Start Date
December 2025
Launch Date
July 2022
Status
Under Construction
Total Launched Apartments
53
Total Area
0.49 Acres
Availability
New
Flooring
Toilets:
Ceramic Tiles
Other Bedroom:
Vitrified Flooring
Kitchen:
Vitrified Flooring
Master Bedroom:
Vitrified Flooring
Balcony:
Ceramic Tiles
Living/Dining:
Vitrified Flooring
Others
Points:
Living
Windows:
Aluminium Sliding Windows
Wiring:
Concealed Copper Electric Wiring with Essential Points
Switches:
Modular switches
Water Storage
24X7 Water Supply
Fire Fighting System
Lift(s)
Club House
Full Power Backup
Landscape Garden and Tree Planting
Gazebo
Party Lawn
Terrace Garden


Langkeshwar Bus Stop
0.58 Km
AEC College Bus Turn Point Bus Stop
0.81 Km
Kailashpur Bus Stop
0.92 Km
AEC Bus Stop
0.96 Km
Forest School Bus Stop
1.21 Km

Total Projects
4
Ongoing Projects
1
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love