


Under Construction
Possession : Dec 2027
Under Construction
Possession : Dec 2027
1.0 Cr Onwards
Nirman Nagar, Jaipur
By Kohinoor Buildcom
1.0 Cr Onwards
Configuration
3 BHK
Builtup area
1,578 - 1,697 sq ft
Possession Status
Under Construction
Possession Start Date
December 2027
Launch Date
July 2023
Status
Under Construction
Total Area
0.26 Acres
Availability
New
Walls
Interior:
Acrylic Emulsion Paint
Kitchen:
Designer Tiles
Exterior:
Distemper Paints
Fittings
Toilets:
Branded CP Fittings and Sanitary Ware
Kitchen:
Single Bowl Single Drain Steel Sink with Chrome Plated Tap
Kitchen:
Marble Counter with Single Bowl Stainless Steel Sink
Kitchen:
JAQUAR or equivalent CP fittings
Kitchen:
Granite platform with stainless steel sink
Kitchen:
Modular Kitchen
Toilets:
High Quality Sanitary Ware and Fittings
Toilets:
Hindware / Parryware or Equivalent Sanitary Fittings
Toilets:
CP Fittings from Essco or Equivalent Make
Toilets:
Granite Vanity Counter with Mirror
Toilets:
TOTO and GROHE Bathroom Fixtures
Kitchen:
Stainless steel sink with CP fittings
Rain Water Harvesting
Fire Fighting System
Internal Roads & Footpaths
Partial Power Backup
Yoga/ Meditation Area
EV Charging Point
Swimming Pool
Gymnasium
24X7 Water Supply
24 X 7 Security



Vardhaman Nagar Bus Stop
0.58 Km
Vardhaman Nagar Bus Stop
0.58 Km
Heerapura Low Floor Bus Stop
1.06 Km
Heerapura Low Floor Bus Stop
1.06 Km
Kaveri Path
1.07 Km

Nirman Nagar, Jaipur
Kohinoor Buildcom
₹ 1.0 Cr – ₹ 1.1 Cr
3 BHK
1,578 - 1,697 sq.ft
3,4 BHK
1,584 - 2,160 sq.ft
3 BHK
1,555 - 2,095 sq.ft
Dec ‘27

Total Projects
3
Ongoing Projects
1
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love