


Launch
Possession : Sept 2028
Launch
Possession : Sept 2028
2.5 Cr Onwards
Gomti Nagar Extension, Lucknow
By Eldeco Inception Buildtech
2.5 Cr Onwards
Configuration
2, 3, 4, 5 BHK
Builtup area
1,344 - 3,372 sq ft
Possession Status
Launch
Possession Start Date
September 2028
Launch Date
June 2024
Status
Launch
Total Area
3.11 Acres
Availability
New
Doors
Internal:
Flush Door
Main:
Flush Door
Others
Windows:
Aluminium Powder Coated Windows
Frame Structure:
Earthquake resistant structure
Wiring:
Concealed copper wiring
Switches:
Modular switches
24X7 Water Supply
Fire Sprinklers
Full Power Backup
Mini Theatre
Spa
Table Tennis
Multipurpose Hall
Swimming Pool
Children's play area
Gymnasium


Husariya Chouraha Bus Stop
0.44 Km
Husadiya Chouraha Bus Stop
0.44 Km
Husadiya Chouraha Bus Stop
0.44 Km
Petrol Pump(Viram Khand)
0.75 Km
Petrol Pump(Viram Khand)
0.75 Km

Gomti Nagar Extension, Lucknow
Eldeco Inception Buildtech
₹ 2.5 Cr – ₹ 6.3 Cr
2,3,4,5 BHK
1,344 - 3,372 sq.ft
4 BHK
2,324 sq.ft
2,3 BHK
965 - 1,379 sq.ft
Sept ‘28

Total Projects
1
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love