


Launch
Possession : Dec 2029
Launch
Possession : Dec 2029
0.4 Cr Onwards
Kalali, Vadodara
By Karma Infra Vadodara
0.4 Cr Onwards
Configuration
3 BHK
Builtup area
900 sq ft
Possession Status
Launch
Possession Start Date
December 2029
Launch Date
July 2024
Status
Launch
Total Area
1.68 Acres
Availability
New
Flooring
Living/Dining:
Vitrified Tiles
Toilets:
Anti Skid Vitrified Tiles
Other Bedroom:
- Vitrified tiles in common bedroom, children bedroom and kitchen
Kitchen:
- Vitrified flooring
Master Bedroom:
- Master bedroom wooden flooring / other bedrooms vitrified tiles
Balcony:
Anti Skid Vitrified Tiles
Others
Wiring:
Havells/Anchor Make
Switches:
Anchor/Roma Switches
Windows:
Aluminium Powder Coated Windows With Mosquito Mesh
Water Storage
Solar Power System
Community Hall
24X7 Water Supply
Rain Water Harvesting
24 X 7 Security
24x7 CCTV Surveillance
Fire Fighting System
Full Power Backup
Internal Roads & Footpaths

Alfa Petroleum
0.83 Km
Ameesh Enterprises, BPCL Petrol Pump
1.49 Km
Petrol Bunk
1.49 Km
Bharat Petroleum
1.51 Km
HP PETROL PUMP - VAGHADIYA PETROLEUM
1.54 Km

Kalali, Vadodara
Karma Infra Vadodara
₹ 0.4 Cr – ₹ 0.4 Cr
₹ 0.2 Cr – ₹ 0.2 Cr
₹ 0.2 Cr – ₹ 0.2 Cr
3 BHK
900 sq.ft
2,3 BHK
2,3 BHK
Dec ‘29
Dec ‘13
May ‘16

Total Projects
1
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love