Introducing KuberX, an AI-driven Loans Platform. Click here to learn more.
 sumegha-apartment Elevation
7 Images

Under Construction

Possession : Dec 2025

Sumegha Apartment

Tithal, Valsad

By Ridaan Developers

Configuration

1, 2 BHK

Builtup area

428 - 1,184 sq ft

Possession Status

Under Construction

Overview

Possession Start Date

December 2025

Launch Date

October 2022

Status

Under Construction

Total Launched Apartments

30

Total Area

0.18 Acres

Availability

New

Project Specifications

Fittings

Kitchen:

Granite Platform with Stainless Steel Sink and Drain Board

Toilets:

Concealed Plumbing

Toilets:

ISI Mark Bath Fittings

Toilets:

Wash Basin

Others

Points:

Master Bedroom

Points:

Other Bedroom

Points:

Living

Points:

Dining

Points:

Kitchen

Points:

Hall

Windows:

Anodized aluminium windows

Wiring:

Concealed copper wiring

Switches:

Modular switches

Frame Structure:

Earthquake resistant RCC framed structure

Sumegha Apartment Amenities

24X7 Water Supply

24 X 7 Security

24x7 CCTV Surveillance

Fire Fighting System

Full Power Backup

Internal Roads & Footpaths

Lift(s)

Landscape Garden and Tree Planting

Sumegha Apartment Neighbourhood

Commute

Healthcare

Education

Shopping

Theatres

Valsad Bus Station

3.56 Km

Bus Terminal Valsad

3.57 Km

About Ridaan Developers

Developer Logo

Total Projects

3

Ongoing Projects

2

More projects by Ridaan Developers

Vanraj
Under Construction

Possession : Jun 2025

Vanraj

Nanakwada, Valsad

2 BHK Apartment

Sumegha Apartment
Under Construction

Possession : Dec 2025

Sumegha Apartment

Tithal, Valsad

1,2 BHK Apartment

Sumangal Appartment
Completed

Possession : Nov 2024

Sumangal Appartment

Zinnat Nagar, Valsad

2 BHK Apartment

banner
PropTigerLogo
Statue

Made with Love

Statue