


Under Construction
Possession : Dec 2025
Under Construction
Possession : Dec 2025
Tithal, Valsad
By Ridaan Developers
Configuration
1, 2 BHK
Builtup area
428 - 1,184 sq ft
Possession Status
Under Construction
Possession Start Date
December 2025
Launch Date
October 2022
Status
Under Construction
Total Launched Apartments
30
Total Area
0.18 Acres
Availability
New
Fittings
Kitchen:
Granite Platform with Stainless Steel Sink and Drain Board
Toilets:
Concealed Plumbing
Toilets:
ISI Mark Bath Fittings
Toilets:
Wash Basin
Others
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Dining
Points:
Kitchen
Points:
Hall
Windows:
Anodized aluminium windows
Wiring:
Concealed copper wiring
Switches:
Modular switches
Frame Structure:
Earthquake resistant RCC framed structure
24X7 Water Supply
24 X 7 Security
24x7 CCTV Surveillance
Fire Fighting System
Full Power Backup
Internal Roads & Footpaths
Lift(s)
Landscape Garden and Tree Planting

Valsad Bus Station
3.56 Km
Bus Terminal Valsad
3.57 Km

Total Projects
3
Ongoing Projects
2
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love