

Under Construction
Possession : Mar 2023
Under Construction
Possession : Mar 2023
Gazipur, Zirakpur
By Sliver City
Configuration
2, 3, 4 BHK
Builtup area
1,281 - 1,916 sq ft
Possession Status
Under Construction
Possession Start Date
March 2023
Launch Date
March 2006
Status
Under Construction
Total Launched Apartments
931
Total Area
3 Acres
Availability
Sold Out
Flooring
Kitchen:
Marble Granite Tiles
Living/Dining:
Marble Granite Tiles
Master Bedroom:
Marble Granite Tiles
Other Bedroom:
Marble Granite Tiles
Toilets:
Marble Granite Tiles
Walls
Interior:
Oil Bound Distemper
Toilets:
Ceramic Tiles Dado up to Lintel Level
Kitchen:
Ceramic Tiles Dado up to Lintel Level
Exterior:
Oil Bound Distemper
Gymnasium
Swimming Pool
Children's play area
Club House
24 X 7 Security
Power Backup
Internet/Wi-Fi
Ro Water System
Jogging Track

National Highway 22
0.27 Km
Petrol Pump
0.27 Km
Bus Stand, Zirakpur
0.53 Km
HP Petrol Pump
0.57 Km
HP PETROL PUMP - PARMAR FILLING STN
1.62 Km

Total Projects
7
Ongoing Projects
1
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love