


Under Construction
Possession : Jun 2028
Under Construction
Possession : Jun 2028
0.8 Cr Onwards
Lokhra, Guwahati
By Imperial Group Guwahati
0.8 Cr Onwards
Configuration
3, 4 BHK
Builtup area
1,348 - 2,581 sq ft
Possession Status
Under Construction
Possession Start Date
June 2028
Launch Date
August 2024
Status
Under Construction
Total Launched Apartments
95
Availability
New
Flooring
Living/Dining:
Ceramic Tiles
Toilets:
Ceramic Tiles
Kitchen:
- 2 height glazed tiles above kitchen platform
Balcony:
Ceramic Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Others
Cement:
Birla
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Dining
Points:
Kitchen
Points:
Hall
Lobby:
Vitrified Tiles
Windows:
Aluminium / UPVC / HardWood
Wiring:
Concealed copper wiring
Switches:
Modular switches
Multipurpose Hall
Swimming Pool
Children's play area
Gymnasium
Car Parking
Visitor Parking
24 X 7 Security
24x7 CCTV Surveillance
Full Power Backup
Vaastu Compliant



Lokhra
0.05 Km
Rupnath Brahma Inter-State Bus Terminal
2.80 Km
Ruonath Brahna Interstate Bus Terminal
2.84 Km
Housing Complex
2.95 Km
Adagudam Bus Stop
3.06 Km

Lokhra, Guwahati
Imperial Group Guwahati
₹ 0.8 Cr – ₹ 1.4 Cr
₹ 0.6 Cr – ₹ 1.1 Cr
₹ 0.8 Cr – ₹ 0.8 Cr
3,4 BHK
1,348 - 2,581 sq.ft
3,4 BHK
3 BHK
Jun ‘28
Aug ‘29
Sept ‘26

Total Projects
3
Ongoing Projects
3
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love