


Launch
Possession : Nov 2025
Launch
Possession : Nov 2025
2.2 Cr Onwards
Andheri East, Mumbai
By Dynamix Group
2.2 Cr Onwards
Configuration
2, 3 BHK
Builtup area
624 - 1,122 sq ft
Avg. Price
20.7K/sq.ft
Possession Status
Launch
Possession Start Date
November 2025
Launch Date
January 2024
Status
Launch
Total Area
0.21 Acres
Availability
New
Others
Wiring:
Concealed Copper Wiring with Adequate Points
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Dining
Points:
Kitchen
Points:
Hall
Switches:
Modular electrical switches
Frame Structure:
Earthquake resistant RCC framed structure
Fittings
Kitchen:
C.P Fittings of JAQUAR/ MARC or Equivalent/ Single Drain Board Sink
Toilets:
Branded CP Fittings & Sanitary Ware, Anti-Skid Tiles
24X7 Water Supply
Fire Sprinklers
Full Power Backup
Gymnasium
Intercom
Lift(s)
24x7 CCTV Surveillance
Gated Community
Children's play area
Mini Theatre



Warehouse Bus Stop
0.43 Km
MAFFFL Sahar
0.47 Km
Petrol Pump
0.54 Km
Ambassador Hotel Bus Stop
0.55 Km
Indian Oil Petrol Pump
0.62 Km

Andheri East, Mumbai
Dynamix Group
₹ 2.2 Cr – ₹ 4.3 Cr
2,3 BHK
624 - 1,122 sq.ft
2,3,4 BHK
775 - 2,400 sq.ft
3,4 BHK
691 - 1,967 sq.ft
Nov ‘25

Total Projects
12
Ongoing Projects
5
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love