

Launch
Possession : Dec 2028
Launch
Possession : Dec 2028
₹ 2.2 Cr Onwards
Dadar East, Mumbai
By GBD Infracon
₹ 2.2 Cr Onwards
Configuration
1, 2, 3 BHK
Builtup area
518 - 1,216 sq ft
Avg. Price
31.0K/sq.ft
Possession Status
Launch
Possession Start Date
December 2028
Launch Date
March 2024
Status
Launch
Total Launched Apartments
40
Total Area
0.25 Acres
Availability
New
Flooring
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Others
Wiring:
Concealed copper wiring
Frame Structure:
RCC framed structure
Switches:
Modular switches
Car Parking
Closed Car Parking
Fire Fighting System
Sewage Treatment Plant
Aggregate area of recreational Open Space
Meter Room
Storm Water Drains
Water Conservation, Rain water Harvesting

Taximen Dadar
0.06 Km
Bharat Petroleum
0.07 Km
Bharat Petroleum
0.08 Km
Taximen's Union
0.08 Km
Taximens Union
0.08 Km

Dadar East, Mumbai
GBD Infracon
₹ 2.2 Cr – ₹ 5.1 Cr
Price on Request
₹ 4.4 Cr – ₹ 4.6 Cr
1,2,3 BHK
518 - 1,216 sq.ft
2,3 BHK
3 BHK
Dec ‘28
Feb ‘25
Aug ‘24

Total Projects
1
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love