


Under Construction
Possession : Feb 2027
Under Construction
Possession : Feb 2027
2.2 Cr Onwards
Jogeshwari West, Mumbai
By Pentagon Premises
2.2 Cr Onwards
Configuration
1, 2, 3 BHK
Builtup area
224 - 818 sq ft
Avg. Price
17.9K/sq.ft
Possession Status
Under Construction
Possession Start Date
February 2027
Launch Date
June 2023
Status
Under Construction
Total Launched Apartments
48
Total Area
0.69 Acres
Availability
New
Walls
Interior:
POP Finish
Others
Windows:
Aluminium Sliding Windows
Wiring:
Concealed copper wiring
Switches:
Modular switches
Frame Structure:
Earthquake resistant RCC framed structure
Fire Fighting System
Yoga/Meditation Area
Senior Citizen Sitout
Entrance Lobby
Swimming Pool
Gymnasium
Car Parking
Indoor Games
Aerobics Room
Cafeteria


Ramesh Nager Bus Stop
0.23 Km
Ramesh Nager Bus Stop
0.23 Km
Veera Desai Rd Last Bus Station
0.54 Km
Veera Desai Rd Last Bus Station
0.55 Km
Kolsite IndustrialJuchandra Society
0.60 Km

Jogeshwari West, Mumbai
Pentagon Premises
₹ 2.2 Cr – ₹ 2.4 Cr
1,2,3 BHK
224 - 818 sq.ft
1,2,3 BHK
376 - 858 sq.ft
2,3 BHK
665 - 950 sq.ft
Feb ‘27

Total Projects
3
Ongoing Projects
2
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love