


Under Construction
Possession : Dec 2027
Under Construction
Possession : Dec 2027
Malabar Hill, Mumbai
By Taksheel Reaalty LLP
Configuration
1, 2, 3, 4, 5 BHK
Builtup area
381 - 3,408 sq ft
Avg. Price
45.2K/sq.ft
Possession Status
Under Construction
Possession Start Date
December 2027
Launch Date
August 2024
Status
Under Construction
Total Launched Apartments
17
Total Area
0.2083 Acres
Availability
New
Flooring
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Others
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Dining
Points:
Kitchen
Points:
Hall
Wiring:
Concealed copper wiring
Frame Structure:
RCC framed structure
Switches:
Modular switches
24X7 Water Supply
Fire Fighting System
Sewage Treatment Plant
Electrical meter Room
Storm Water Drains
Water Conservation, Rain water Harvesting

Babulnath
0.09 Km
HP PETROL PUMP - R S VATCHA AND COMPANY
0.13 Km
Petrol Pump
0.13 Km
Vacha Petrol Pump
0.13 Km
Balunath Junction
0.15 Km

Malabar Hill, Mumbai
Taksheel Reaalty LLP
Price on Request
₹ 33.9 Cr – ₹ 135.5 Cr
Price on Request
1,2,3,4,5 BHK
381 - 3,408 sq.ft
4,7 BHK
1,2,5 BHK
Dec ‘27
Sept ‘27
Jun ‘30

Total Projects
1
Ongoing Projects
1
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love