


Under Construction
Possession : Sept 2026
Under Construction
Possession : Sept 2026
1.5 Cr Onwards
Malad West, Mumbai
By Ahuja Group
1.5 Cr Onwards
Configuration
2, 3 BHK
Builtup area
644 - 1,049 sq ft
Avg. Price
17.7K/sq.ft
Possession Status
Under Construction
Possession Start Date
September 2026
Launch Date
September 2017
Status
Under Construction
Total Launched Apartments
308
Total Area
1 Acres
Availability
New
Flooring
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Engineered Wooden Flooring
Other Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Tiles
Walls
Interior:
Acrylic Paint
Kitchen:
Designer Tiles Dado
Toilets:
Designer Tiles Dado
Internal Roads
24X7 Water Supply
Sewage Treatment Plant
Storm Water Drains
Landscaping & Tree Planting
Street Lighting
Water Conservation, Rain water Harvesting
Energy management
Fire Fighting System
Electrical Meter Room, Sub-Station, Receiving Station


Mariamman Mandir
0.04 Km
Mariamman Mandir
0.08 Km
Kachpada
0.14 Km
Plesent Park (Mira Road)
0.15 Km
Kachpada
0.16 Km

Malad West, Mumbai
Ahuja Group
₹ 1.5 Cr – ₹ 2.4 Cr
2,3 BHK
644 - 1,049 sq.ft
2,3 BHK
729 - 934 sq.ft
1,2 BHK
437 - 646 sq.ft
Sept ‘26

Years of experience
42
Total Projects
47
Ongoing Projects
2
With three decades of experience, Ahuja Group is a reputed real estate builder based inMumbai. Mr. Jagdish Ahuja is the Chairman whole Mr. Gautam Ahuja is the Director of the company.
Ahuja Group builder has its strong presence in v
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love