

Under Construction
Possession : Dec 2026
Under Construction
Possession : Dec 2026
Panvel, Mumbai
By Sharda Infra Ulwe
Configuration
1 BHK
Builtup area
192 - 390 sq ft
Avg. Price
8.2K/sq.ft
Possession Status
Under Construction
Possession Start Date
December 2026
Launch Date
April 2024
Status
Under Construction
Total Launched Apartments
37
Total Area
0.1 Acres
Availability
New
Flooring
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Ceramic Tiles
Others
Wiring:
Concealed Copper Wiring with Adequate Points
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Kitchen
Switches:
Modular electrical switches
Frame Structure:
Earthquake resistant RCC framed structure
24X7 Water Supply
Rain Water Harvesting
Gated Community
24 X 7 Security
CCTV
Intercom
Full Power Backup
Internal Roads
Lift(s)
Sewage Treatment Plant

KONKAN SALES & SERVICES
0.71 Km
LPG Pump Panvel. Auto LPG,
1.38 Km
Go Gas Auto LPG Pump
1.38 Km
Bharat Petroleum Petrol Pump
1.39 Km
Bharat Petroleum
1.42 Km

Panvel, Mumbai
Sharda Infra Ulwe
Price on Request
1 BHK
192 - 390 sq.ft
1,2,3 BHK
414 - 1,064 sq.ft
2 BHK
569 - 700 sq.ft
Dec ‘26

Total Projects
3
Ongoing Projects
1
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love