

Under Construction
Possession : Feb 2028
Under Construction
Possession : Feb 2028
0.2 Cr Onwards
Panvel, Mumbai
By Supreme Holdings And Hospitality India
0.2 Cr Onwards
Configuration
1, 2 BHK
Builtup area
343 - 497 sq ft
Avg. Price
8.2K/sq.ft
Possession Status
Under Construction
Possession Start Date
February 2028
Launch Date
October 2024
Status
Under Construction
Total Launched Apartments
100
Availability
New
Flooring
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Others
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Dining
Points:
Kitchen
Points:
Hall
Wiring:
Concealed copper wiring
Frame Structure:
RCC framed structure
Switches:
Modular switches
Car Parking
24X7 Water Supply
24x7 CCTV Surveillance
Fire Fighting System
Full Power Backup

Panvel Bus Station
0.14 Km
Panvel
0.14 Km
Panvel
0.14 Km
Panvel
0.19 Km
Panvel
0.20 Km

Panvel, Mumbai
Supreme Holdings And Hospitality India
₹ 0.2 Cr – ₹ 0.3 Cr
1,2 BHK
343 - 497 sq.ft
1,2,3 BHK
414 - 1,064 sq.ft
2,3 BHK
612 - 932 sq.ft
Feb ‘28

Total Projects
11
Ongoing Projects
3
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love