


Under Construction
Possession : Nov 2025
Under Construction
Possession : Nov 2025
0.2 Cr Onwards
Taloja, Mumbai
By LK Infrastructure
0.2 Cr Onwards
Configuration
1 BHK
Builtup area
240 - 690 sq ft
Avg. Price
6.0K/sq.ft
Possession Status
Under Construction
Possession Start Date
November 2025
Launch Date
June 2022
Status
Under Construction
Total Launched Apartments
24
Total Area
0.12 Acres
Availability
New
Flooring
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Tiles
Other Bedroom:
- Vitrified tiles in common bedroom, children bedroom and kitchen
Kitchen:
- Vitrified flooring
Balcony:
Anti Skid Vitrified Tiles
Walls
Exterior:
Emulsion Paint
Interior:
Acrylic Paint
Toilets:
Ceramic Tiles
Kitchen:
Ceramic Tiles
Closed Car Parking
24X7 Water Supply
Fire Fighting System
Sewage Treatment Plant
Meter Room
Landscape Garden and Tree Planting
Open Parking
Storm Water Drains
Water Conservation, Rain water Harvesting
Swimming Pool



Taloja Bus Stop
0.29 Km
Taloje Panchnad Railway Station
0.40 Km
Taloje Panchnad Railway Station
0.41 Km
Petrol Pump
0.53 Km
Taloja Gaon
0.65 Km

Taloja, Mumbai
LK Infrastructure
₹ 0.2 Cr – ₹ 0.6 Cr
1 BHK
240 - 690 sq.ft
1,2,3 BHK
366 - 923 sq.ft
2,3 BHK
458 - 2,180 sq.ft
Nov ‘25

Total Projects
8
Ongoing Projects
4
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love