


Under Construction
Possession : Dec 2025
Under Construction
Possession : Dec 2025
1.8 Cr Onwards
Thane West, Mumbai
By Raymond Limited
1.8 Cr Onwards
Configuration
2, 3 BHK
Builtup area
615 - 894 sq ft
Avg. Price
14.0K/sq.ft
Possession Status
Under Construction
Possession Start Date
December 2025
Launch Date
January 2023
Status
Under Construction
Total Launched Apartments
301
Total Area
3.74 Acres
Availability
New
Others
Points:
Master Bedroom
Points:
Other Bedroom
Points:
Living
Points:
Dining
Points:
Kitchen
Points:
Hall
Switches:
Modular Switches of Anchor Roma or Equivalent
Wiring:
Three Face Electrical Supply with Concealed MCB Copper Wiring
Frame Structure:
Earthquake resistant structure
Flooring
Toilets:
Anti Skid Vitrified Tiles
Kitchen:
- Vitrified flooring
Balcony:
Anti Skid Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiled Flooring
Other Bedroom:
Vitrified Tiled Flooring
Rain Water Harvesting
Fire Fighting System
Landscape Garden and Tree Planting
Mini Theatre
Yoga/Meditation Area
Sun Deck
Spa
Swimming Pool
Gymnasium
Cricket Pitch



George Automobiles
0.32 Km
Vandana Cinema Bus Stop
0.33 Km
Petrol Pump
0.34 Km
UNITED MOTOR STORES
0.34 Km
Radhakishan Lalchand
0.35 Km

Thane West, Mumbai
Raymond Limited
₹ 1.8 Cr – ₹ 2.5 Cr
2,3 BHK
615 - 894 sq.ft
2,3 BHK
631 - 921 sq.ft
3,4,5 BHK
930 - 1,870 sq.ft
Dec ‘25

Years of experience
14
Total Projects
34
Ongoing Projects
23
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love