


Under Construction
Possession : May 2026
Under Construction
Possession : May 2026
1.3 Cr Onwards
Thane West, Mumbai
By Raymond Limited
1.3 Cr Onwards
Configuration
2 BHK
Builtup area
565 - 635 sq ft
Avg. Price
14.0K/sq.ft
Possession Status
Under Construction
Possession Start Date
May 2026
Launch Date
September 2019
Status
Under Construction
Total Area
14 Acres
Availability
New
Flooring
Balcony:
Anti Skid Tiles
Toilets:
Anti Skid Tiles
Kitchen:
Vitrified Flooring
Master Bedroom:
Vitrified Flooring
Others
Windows:
Anodized Aluminium Sliding
Wiring:
ISI Copper Wiring in PVC Concealed Conduit
Switches:
Modular switches
Frame Structure:
Earthquake resistant RCC framed structure
Gymnasium
Swimming Pool
Children's play area
Club House
Sports Facility
Intercom
Full Power Backup
Lift(s)
Gated Community
24X7 Water Supply



HP
0.14 Km
Building No.1
0.18 Km
Building No.1
0.18 Km
Vartak Nagar
0.19 Km
Building No.3
0.20 Km

Thane West, Mumbai
Raymond Limited
₹ 1.3 Cr – ₹ 1.5 Cr
Price on Request
₹ 0.8 Cr – ₹ 2.7 Cr
2 BHK
565 - 635 sq.ft
1,2 BHK
1,2,3 BHK
May ‘26
Jan ‘16
May ‘26

Years of experience
14
Total Projects
34
Ongoing Projects
23
Batra House, Plot No. 52, Institutional Area, Sector 32, Gurugram, Haryana, 122003
Made with Love