SHAMIYANA PARK
SEJALKUMAR PANNALAL SHAH
326 UMARAJ, UMARAJ BHARUCH
Approved
27th Dec 2017
Pending
30th Sept 2027
Registration No.
PR/GJ/BHARUCH/BHARUCH/Others/MAA01113/271217
Acknowledgement No.
PR/BHARUCH/BHARUCH/BHARUCH TPO/171016/003779
Project Type
Mixed Development
Approving Authority
Bharuch- Ankleshwar Urban Development Authority
District
Bharuch
Taluka
Bharuch
State
Gujarat
Project Details
| Project Name | SHAMIYANA PARK |
| RERA Number | PR/GJ/BHARUCH/BHARUCH/Others/MAA01113/271217 |
| Acknowledgement Number | PR/BHARUCH/BHARUCH/BHARUCH TPO/171016/003779 |
| Project Description | RESIDENTIAL AND COMMERCIAL |
| Project Type | Mixed Development |
| Project Status | APPROVED |
| District | Bharuch |
| Taluka | Bharuch |
| Address | 326 UMARAJ, UMARAJ BHARUCH |
| Pincode | 392020 |
| State | Gujarat |
| Approving Authority | Bharuch- Ankleshwar Urban Development Authority |
| Approved On | 2017-12-27 |
| Start Date | 2016-09-30 |
| End Date | 2027-09-30 |
| Submission Date | 2017-10-16 |
| Months Delayed | 0 |
Area & Cost Details
| Total Land Area | 12545.0 |
| Total Covered Area | 3719.0 |
| Total Open Area | 8826.0 |
| Open Parking Area | 687 |
| Covered Parking Area | 1918.0 |
| Covered Parking Count | 1 |
| Parking for Sale Count | 50 |
| Cost of Land | 36003976 |
| Estimated Project Cost | 143419059 |
| Total Project Cost | 179423035 |
Land Details
| Moje | Umraj |
Promoter Details
| Promoter Name | SEJALKUMAR PANNALAL SHAH |
| Promoter Type | Individual/Propritorship |
| inf***********@gmail.com | |
| Mobile | 98******** |
| PAN | AHX******* |
| Date of Incorporation | 1973-05-24 |
| Experience (Years) | 12 |
| Area Constructed (sqm) | 0 |
| Projects Completed | 0 |
| Ongoing Projects | 0 |
Building Blocks
| TOWER A - Start Date | 2016-09-30 |
| TOWER A - End Date | 2027-09-30 |
| TOWER A - Progress | 57.5% |
| TOWER A - Booked Units | 46 |
| TOWER A - Unbooked Units | 34 |
| TOWER B - Start Date | 2016-09-30 |
| TOWER B - End Date | 2027-09-30 |
| TOWER B - Progress | 37.5% |
| TOWER B - Booked Units | 36 |
| TOWER B - Unbooked Units | 60 |
| BUNGLOW NO 1 - Start Date | 2016-09-30 |
| BUNGLOW NO 1 - End Date | 2027-09-30 |
| BUNGLOW NO 1 - Progress | 100.0% |
| BUNGLOW NO 1 - Booked Units | 1 |
| BUNGLOW NO 1 - Unbooked Units | 0 |
| BUNGLOW NO 2 - Start Date | 2016-09-30 |
| BUNGLOW NO 2 - End Date | 2027-09-30 |
| BUNGLOW NO 2 - Progress | 100.0% |
| BUNGLOW NO 2 - Booked Units | 1 |
| BUNGLOW NO 2 - Unbooked Units | 0 |
| BUNGLOW NO 3 - Start Date | 2016-09-30 |
| BUNGLOW NO 3 - End Date | 2027-09-30 |
| BUNGLOW NO 3 - Progress | 100.0% |
| BUNGLOW NO 3 - Booked Units | 1 |
| BUNGLOW NO 3 - Unbooked Units | 0 |
| BUNGLOW NO 4 - Start Date | 2016-09-30 |
| BUNGLOW NO 4 - End Date | 2027-09-30 |
| BUNGLOW NO 4 - Progress | 100.0% |
| BUNGLOW NO 4 - Booked Units | 1 |
| BUNGLOW NO 4 - Unbooked Units | 0 |
| BUNGLOW NO 5 - Start Date | 2016-09-30 |
| BUNGLOW NO 5 - End Date | 2027-09-30 |
| BUNGLOW NO 5 - Progress | 100.0% |
| BUNGLOW NO 5 - Booked Units | 1 |
| BUNGLOW NO 5 - Unbooked Units | 0 |
| BUNGLOW NO 6 - Start Date | 2016-09-30 |
| BUNGLOW NO 6 - End Date | 2027-09-30 |
| BUNGLOW NO 6 - Progress | 100.0% |
| BUNGLOW NO 6 - Booked Units | 1 |
| BUNGLOW NO 6 - Unbooked Units | 0 |
| BUNGLOW NO 7 - Start Date | 2016-09-30 |
| BUNGLOW NO 7 - End Date | 2027-09-30 |
| BUNGLOW NO 7 - Progress | 100.0% |
| BUNGLOW NO 7 - Booked Units | 1 |
| BUNGLOW NO 7 - Unbooked Units | 0 |
| BUNGLOW NO 8 - Start Date | 2016-09-30 |
| BUNGLOW NO 8 - End Date | 2027-09-30 |
| BUNGLOW NO 8 - Progress | 100.0% |
| BUNGLOW NO 8 - Booked Units | 1 |
| BUNGLOW NO 8 - Unbooked Units | 0 |
| BUNGLOW NO 9 - Start Date | 2016-09-30 |
| BUNGLOW NO 9 - End Date | 2027-09-30 |
| BUNGLOW NO 9 - Progress | 100.0% |
| BUNGLOW NO 9 - Booked Units | 1 |
| BUNGLOW NO 9 - Unbooked Units | 0 |
| BUNGLOW NO 10 - Start Date | 2016-09-30 |
| BUNGLOW NO 10 - End Date | 2027-09-30 |
| BUNGLOW NO 10 - Progress | 100.0% |
| BUNGLOW NO 10 - Booked Units | 1 |
| BUNGLOW NO 10 - Unbooked Units | 0 |
| BUNGLOW NO 11 - Start Date | 2016-09-30 |
| BUNGLOW NO 11 - End Date | 2027-09-30 |
| BUNGLOW NO 11 - Progress | 100.0% |
| BUNGLOW NO 11 - Booked Units | 1 |
| BUNGLOW NO 11 - Unbooked Units | 0 |
| BUNGLOW NO 12 - Start Date | 2016-09-30 |
| BUNGLOW NO 12 - End Date | 2027-09-30 |
| BUNGLOW NO 12 - Progress | 100.0% |
| BUNGLOW NO 12 - Booked Units | 1 |
| BUNGLOW NO 12 - Unbooked Units | 0 |
| BUNGLOW NO 13 - Start Date | 2016-09-30 |
| BUNGLOW NO 13 - End Date | 2027-09-30 |
| BUNGLOW NO 13 - Progress | 0.0% |
| BUNGLOW NO 13 - Booked Units | 0 |
| BUNGLOW NO 13 - Unbooked Units | 1 |
| BUNGLOW NO 14 - Start Date | 2016-09-30 |
| BUNGLOW NO 14 - End Date | 2027-09-30 |
| BUNGLOW NO 14 - Progress | 100.0% |
| BUNGLOW NO 14 - Booked Units | 1 |
| BUNGLOW NO 14 - Unbooked Units | 0 |
| BUNGLOW NO 15 - Start Date | 2016-09-30 |
| BUNGLOW NO 15 - End Date | 2027-09-30 |
| BUNGLOW NO 15 - Progress | 100.0% |
| BUNGLOW NO 15 - Booked Units | 1 |
| BUNGLOW NO 15 - Unbooked Units | 0 |
| BUNGLOW NO 16 - Start Date | 2016-09-30 |
| BUNGLOW NO 16 - End Date | 2027-09-30 |
| BUNGLOW NO 16 - Progress | 100.0% |
| BUNGLOW NO 16 - Booked Units | 1 |
| BUNGLOW NO 16 - Unbooked Units | 0 |
| BUNGLOW NO 17 - Start Date | 2016-09-30 |
| BUNGLOW NO 17 - End Date | 2027-09-30 |
| BUNGLOW NO 17 - Progress | 100.0% |
| BUNGLOW NO 17 - Booked Units | 1 |
| BUNGLOW NO 17 - Unbooked Units | 0 |
| BUNGLOW NO 18 - Start Date | 2016-09-30 |
| BUNGLOW NO 18 - End Date | 2027-09-30 |
| BUNGLOW NO 18 - Progress | 100.0% |
| BUNGLOW NO 18 - Booked Units | 1 |
| BUNGLOW NO 18 - Unbooked Units | 0 |
| BUNGLOW NO 19 - Start Date | 2016-09-30 |
| BUNGLOW NO 19 - End Date | 2027-09-30 |
| BUNGLOW NO 19 - Progress | 100.0% |
| BUNGLOW NO 19 - Booked Units | 1 |
| BUNGLOW NO 19 - Unbooked Units | 0 |
| BUNGLOW NO 20 - Start Date | 2016-09-30 |
| BUNGLOW NO 20 - End Date | 2027-09-30 |
| BUNGLOW NO 20 - Progress | 0.0% |
| BUNGLOW NO 20 - Booked Units | 0 |
| BUNGLOW NO 20 - Unbooked Units | 1 |
| BUNGLOW NO 21 - Start Date | 2016-09-30 |
| BUNGLOW NO 21 - End Date | 2027-09-30 |
| BUNGLOW NO 21 - Progress | 100.0% |
| BUNGLOW NO 21 - Booked Units | 1 |
| BUNGLOW NO 21 - Unbooked Units | 0 |
| BUNGLOW NO 22 - Start Date | 2016-09-30 |
| BUNGLOW NO 22 - End Date | 2027-09-30 |
| BUNGLOW NO 22 - Progress | 0.0% |
| BUNGLOW NO 22 - Booked Units | 0 |
| BUNGLOW NO 22 - Unbooked Units | 1 |
| BUNGLOW NO 23 - Start Date | 2016-09-30 |
| BUNGLOW NO 23 - End Date | 2027-09-30 |
| BUNGLOW NO 23 - Progress | 100.0% |
| BUNGLOW NO 23 - Booked Units | 1 |
| BUNGLOW NO 23 - Unbooked Units | 0 |
| BUNGLOW NO 24 - Start Date | 2016-09-30 |
| BUNGLOW NO 24 - End Date | 2027-09-30 |
| BUNGLOW NO 24 - Progress | 100.0% |
| BUNGLOW NO 24 - Booked Units | 1 |
| BUNGLOW NO 24 - Unbooked Units | 0 |
| BUNGLOW NO 25 - Start Date | 2016-09-30 |
| BUNGLOW NO 25 - End Date | 2027-09-30 |
| BUNGLOW NO 25 - Progress | 100.0% |
| BUNGLOW NO 25 - Booked Units | 1 |
| BUNGLOW NO 25 - Unbooked Units | 0 |
| BUNGLOW NO 26 - Start Date | 2016-09-30 |
| BUNGLOW NO 26 - End Date | 2027-09-30 |
| BUNGLOW NO 26 - Progress | 100.0% |
| BUNGLOW NO 26 - Booked Units | 1 |
| BUNGLOW NO 26 - Unbooked Units | 0 |
| BUNGLOW NO 27 - Start Date | 2016-09-30 |
| BUNGLOW NO 27 - End Date | 2027-09-30 |
| BUNGLOW NO 27 - Progress | 100.0% |
| BUNGLOW NO 27 - Booked Units | 1 |
| BUNGLOW NO 27 - Unbooked Units | 0 |
| BUNGLOW NO 28 - Start Date | 2016-09-30 |
| BUNGLOW NO 28 - End Date | 2027-09-30 |
| BUNGLOW NO 28 - Progress | 100.0% |
| BUNGLOW NO 28 - Booked Units | 1 |
| BUNGLOW NO 28 - Unbooked Units | 0 |
| BUNGLOW NO 29 - Start Date | 2016-09-30 |
| BUNGLOW NO 29 - End Date | 2027-09-30 |
| BUNGLOW NO 29 - Progress | 100.0% |
| BUNGLOW NO 29 - Booked Units | 1 |
| BUNGLOW NO 29 - Unbooked Units | 0 |
| BUNGLOW NO 30 - Start Date | 2016-09-30 |
| BUNGLOW NO 30 - End Date | 2027-09-30 |
| BUNGLOW NO 30 - Progress | 100.0% |
| BUNGLOW NO 30 - Booked Units | 1 |
| BUNGLOW NO 30 - Unbooked Units | 0 |
| BUNGLOW NO 31 - Start Date | 2016-09-30 |
| BUNGLOW NO 31 - End Date | 2027-09-30 |
| BUNGLOW NO 31 - Progress | 100.0% |
| BUNGLOW NO 31 - Booked Units | 1 |
| BUNGLOW NO 31 - Unbooked Units | 0 |
| BUNGLOW NO 32 - Start Date | 2016-09-30 |
| BUNGLOW NO 32 - End Date | 2027-09-30 |
| BUNGLOW NO 32 - Progress | 100.0% |
| BUNGLOW NO 32 - Booked Units | 1 |
| BUNGLOW NO 32 - Unbooked Units | 0 |
| BUNGLOW NO 33 - Start Date | 2016-09-30 |
| BUNGLOW NO 33 - End Date | 2027-09-30 |
| BUNGLOW NO 33 - Progress | 100.0% |
| BUNGLOW NO 33 - Booked Units | 1 |
| BUNGLOW NO 33 - Unbooked Units | 0 |
| BUNGLOW NO 34 - Start Date | 2016-09-30 |
| BUNGLOW NO 34 - End Date | 2027-09-30 |
| BUNGLOW NO 34 - Progress | 0.0% |
| BUNGLOW NO 34 - Booked Units | 0 |
| BUNGLOW NO 34 - Unbooked Units | 1 |
| BUNGLOW NO 35 - Start Date | 2016-09-30 |
| BUNGLOW NO 35 - End Date | 2027-09-30 |
| BUNGLOW NO 35 - Progress | 0.0% |
| BUNGLOW NO 35 - Booked Units | 0 |
| BUNGLOW NO 35 - Unbooked Units | 1 |
| BUNGLOW NO 36 - Start Date | 2016-09-30 |
| BUNGLOW NO 36 - End Date | 2027-09-30 |
| BUNGLOW NO 36 - Progress | 0.0% |
| BUNGLOW NO 36 - Booked Units | 0 |
| BUNGLOW NO 36 - Unbooked Units | 1 |
| BUNGLOW NO 37 - Start Date | 2016-09-30 |
| BUNGLOW NO 37 - End Date | 2027-09-30 |
| BUNGLOW NO 37 - Progress | 0.0% |
| BUNGLOW NO 37 - Booked Units | 0 |
| BUNGLOW NO 37 - Unbooked Units | 1 |
| BUNGLOW NO 38 - Start Date | 2016-09-30 |
| BUNGLOW NO 38 - End Date | 2027-09-30 |
| BUNGLOW NO 38 - Progress | 0.0% |
| BUNGLOW NO 38 - Booked Units | 0 |
| BUNGLOW NO 38 - Unbooked Units | 1 |
| BUNGLOW NO 39 - Start Date | 2016-09-30 |
| BUNGLOW NO 39 - End Date | 2027-09-30 |
| BUNGLOW NO 39 - Progress | 0.0% |
| BUNGLOW NO 39 - Booked Units | 0 |
| BUNGLOW NO 39 - Unbooked Units | 1 |
| BUNGLOW NO 40 - Start Date | 2016-09-30 |
| BUNGLOW NO 40 - End Date | 2027-09-30 |
| BUNGLOW NO 40 - Progress | 0.0% |
| BUNGLOW NO 40 - Booked Units | 0 |
| BUNGLOW NO 40 - Unbooked Units | 1 |
| BUNGLOW NO 41 - Start Date | 2016-09-30 |
| BUNGLOW NO 41 - End Date | 2027-09-30 |
| BUNGLOW NO 41 - Progress | 0.0% |
| BUNGLOW NO 41 - Booked Units | 0 |
| BUNGLOW NO 41 - Unbooked Units | 1 |
| BUNGLOW NO 42 - Start Date | 2016-09-30 |
| BUNGLOW NO 42 - End Date | 2027-09-30 |
| BUNGLOW NO 42 - Progress | 100.0% |
| BUNGLOW NO 42 - Booked Units | 1 |
| BUNGLOW NO 42 - Unbooked Units | 0 |
| BUNGLOW NO 43 - Start Date | 2016-09-30 |
| BUNGLOW NO 43 - End Date | 2027-09-30 |
| BUNGLOW NO 43 - Progress | 100.0% |
| BUNGLOW NO 43 - Booked Units | 1 |
| BUNGLOW NO 43 - Unbooked Units | 0 |
| BUNGLOW NO 44 - Start Date | 2016-09-30 |
| BUNGLOW NO 44 - End Date | 2027-09-30 |
| BUNGLOW NO 44 - Progress | 100.0% |
| BUNGLOW NO 44 - Booked Units | 1 |
| BUNGLOW NO 44 - Unbooked Units | 0 |
| BUNGLOW NO 45 - Start Date | 2016-09-30 |
| BUNGLOW NO 45 - End Date | 2027-09-30 |
| BUNGLOW NO 45 - Progress | 100.0% |
| BUNGLOW NO 45 - Booked Units | 1 |
| BUNGLOW NO 45 - Unbooked Units | 0 |
| BUNGLOW NO 46 - Start Date | 2016-09-30 |
| BUNGLOW NO 46 - End Date | 2027-09-30 |
| BUNGLOW NO 46 - Progress | 100.0% |
| BUNGLOW NO 46 - Booked Units | 1 |
| BUNGLOW NO 46 - Unbooked Units | 0 |
| BUNGLOW NO 47 - Start Date | 2016-09-30 |
| BUNGLOW NO 47 - End Date | 2027-09-30 |
| BUNGLOW NO 47 - Progress | 100.0% |
| BUNGLOW NO 47 - Booked Units | 1 |
| BUNGLOW NO 47 - Unbooked Units | 0 |
| BUNGLOW NO 48 - Start Date | 2016-09-30 |
| BUNGLOW NO 48 - End Date | 2027-09-30 |
| BUNGLOW NO 48 - Progress | 0.0% |
| BUNGLOW NO 48 - Booked Units | 0 |
| BUNGLOW NO 48 - Unbooked Units | 1 |
| BUNGLOW NO 49 - Start Date | 2016-09-30 |
| BUNGLOW NO 49 - End Date | 2027-09-30 |
| BUNGLOW NO 49 - Progress | 100.0% |
| BUNGLOW NO 49 - Booked Units | 1 |
| BUNGLOW NO 49 - Unbooked Units | 0 |
| BUNGLOW NO 50 - Start Date | 2016-09-30 |
| BUNGLOW NO 50 - End Date | 2027-09-30 |
| BUNGLOW NO 50 - Progress | 100.0% |
| BUNGLOW NO 50 - Booked Units | 1 |
| BUNGLOW NO 50 - Unbooked Units | 0 |
Inventory Units
| RESIDENTIAL AND COMMERCIAL - Total Units | 226 |
| RESIDENTIAL AND COMMERCIAL - Carpet Area | 11235.0 |
| RESIDENTIAL AND COMMERCIAL - Exclusive Area | 249.0 |
| RESIDENTIAL AND COMMERCIAL - Open Terrace Area | 186.0 |
Quarterly Progress
| May 2018 | 1.84% |
| August 2018 | 2.25% |
| November 2018 | 2.25% |
| February 2019 | 2.25% |
| May 2019 | 2.66% |
| August 2019 | 3.06% |
| November 2019 | 18.64% |
| February 2020 | 18.64% |
| August 2020 | 23.13% |
| November 2020 | 23.15% |
| February 2021 | 23.52% |
| May 2021 | 23.75% |
| August 2021 | 27.71% |
| November 2021 | 28.12% |
| February 2022 | 36.45% |
| May 2022 | 53.31% |
| August 2022 | 55.76% |
| November 2022 | 55.99% |
| February 2023 | 62.69% |
| May 2023 | 74.05% |
| August 2023 | 77.95% |
| November 2023 | 83.76% |
| January 2024 | 98.95% |
| April 2024 | 100.0% |
Professionals
| Architect | ASHWIN DALAL |
| Licence No. | VMC/LIC/09/2017/18 |
| Engineer | ANIL MISTRY |
| Licence No. | BAUDA/L/STR/04 |
| Contractor | LALLAN CHAUHAN |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in