VRAJ VILLA
SHREE BHAKTI CORPORATION PVT LTD
OPP. NALANDA COLLEGE, NEAR PARIWAR CHAR RASTA, WAGHODIA DABHOI RING ROAD
Approved
2nd Jul 2018
Completed
28th Aug 2018
Registration No.
PR/GJ/VADODARA/VADODARA/Others/RAA03049/020718
Acknowledgement No.
PR/VADODARA/VADODARA/VADODARA TPO/170929/003154
Project Type
Residential/Group Housing
Approving Authority
Vadodara Municipal Corporation
District
Vadodara
Taluka
Vadodara
State
Gujarat
Project Details
| Project Name | VRAJ VILLA |
| RERA Number | PR/GJ/VADODARA/VADODARA/Others/RAA03049/020718 |
| Acknowledgement Number | PR/VADODARA/VADODARA/VADODARA TPO/170929/003154 |
| Project Description | PROJECT COMPRISES RESIDENTIAL 3BHK MODERN STYLE VILLA |
| Project Type | Residential/Group Housing |
| Project Status | Completed |
| District | Vadodara |
| Taluka | Vadodara |
| Address | OPP. NALANDA COLLEGE, NEAR PARIWAR CHAR RASTA, WAGHODIA DABHOI RING ROAD |
| Pincode | 390025 |
| State | Gujarat |
| Approving Authority | Vadodara Municipal Corporation |
| Approved On | 2018-07-02 |
| Start Date | 2012-12-27 |
| End Date | 2018-08-28 |
| Submission Date | 2017-09-29 |
| Months Delayed | 0 |
Area & Cost Details
| Total Land Area | 25394.0 |
| Total Covered Area | 14303.0 |
| Total Open Area | 0.0 |
| Open Parking Area | 0 |
| Covered Parking Area | 0.0 |
| Covered Parking Count | 0 |
| Parking for Sale Count | 0 |
| Cost of Land | 0 |
| Estimated Project Cost | 250000000 |
| Total Project Cost | 250000000 |
Land Details
| Moje | Bapod |
Promoter Details
| Promoter Name | SHREE BHAKTI CORPORATION PVT LTD |
| Promoter Type | COMPANY |
| shr***********@gmail.com | |
| Mobile | 98******** |
| Company Registration No. | U70200GJ2012PTC072773 |
| PAN | AAS******* |
| Experience (Years) | 25 |
| Area Constructed (sqm) | 11091 |
| Projects Completed | 15 |
| Ongoing Projects | 1 |
Promoter Partners
| Partner 1 | SANJAY R. PARIKH |
| Address | 15/A SHAKTI SOCIETY, OLD PADRA ROAD |
Building Blocks
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
| DUPLEX - Start Date | 2012-12-27 |
| DUPLEX - End Date | 2018-08-28 |
| DUPLEX - Progress | 95.05% |
| DUPLEX - Booked Units | 96 |
| DUPLEX - Unbooked Units | 5 |
Inventory Units
| Residential - Total Units | 101 |
| Residential - Completed Units | 0 |
| Residential - Booked Units | 0 |
| Residential - Carpet Area | 8829.0 |
| Residential - Exclusive Area | 0.0 |
| Residential - Open Terrace Area | 0.0 |
Quarterly Progress
| September 2018 | 100.0% |
Professionals
| Architect | DEV ARCHITECTS |
| Licence No. | VMSS LIC NO. ER 261 |
| Engineer | ASHOK SHAH & ASSCOCIATES |
| Licence No. | REGN NO. SH-73 |
| Contractor | RAJ ENETRPRISE |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in