ARRYA INFRATECH
Ballari
Approved
11th Apr 2022
Completed
31st Dec 2023
Registration No.
PRM/KA/RERA/1248/469/PR/110422/004822
Acknowledgement No.
ACK/KA/RERA/1248/469/PR/030322/005731
Project Type
Plotted Development
District
Ballari
Taluka
Ballari
State
Karnataka
| Number of Survey No./CMC No./CTS No./PID No. | 1 |
| Is there any Litigations on Land/Property/Khatha? | NO |
| Type of Firm | Partnership Firm |
| Promoter Name | ARRYA INFRATECH |
| Main Objectives | FORMATION OF RESIDENTIAL LAYOUTS |
| Registration Number | BLYF144201920 |
| PAN | AXFPM1528H |
| GSTIN | 29ABRFA0394B1ZE |
| Promoter Address | NO.05, GROUND FLOOR, KARNATAKA ENGINEERS ASSOCIATION BUILDING, S N PET MAIN ROAD,BALLARI ,Ballari ,Ballari-583101 |
| District | Ballari |
| Taluk | Ballari |
| PIN Code | 583101 |
| Name of Authorized Signatory | M MADHUSUDHAN REDDY |
| Number of Partners | 4 |
| Is there any RERA Registrations in other State / UT ? | NO |
| Is there any Projects Launched In The Past 5 Years in Karnataka ? | YES |
| Project Name | GOGINENI'S NEST |
| Project Description | RESIDENTIAL LAYOUT IN 4.50 ACRES AT BALLARI R VILLAGE, BALLARI TALUK |
| Type of Project | Plotted Development |
| Current Status | Completed |
| Expected Completion Date | 31-12-2022 |
| Is there any case pending ? | NO |
| Is Payment Pertaining to Project Land Pending ? | NO |
| Project Address | SY NO.249/1A & 1B BALLARI R VILLAGE BALLARI TALUK & DIST 583101 |
| State/UT | Karnataka |
| Pin Code | 583101 |
| Present Address | MANIKANTA NILAYA 1ST LINK ROAD VENKATESWARA NAGAR , Ballari , Karnataka - 583101 |
| Permanent Address | MANIKANTA NILAYA 1ST LINK ROAD VENKATESWARA NAGAR , Ballari , Karnataka - 583101 |
| Official Address | ARRYA INFRATECH NO.05 GROUND FLOOR, KARNATAKA ENGINEERS ASSOCIATION BUILDING, S N PET MAIN ROAD , Ballari , Karnataka - 583101 |
| Sl No. | |
| Sl No._1 | |
| Sl No._2 |
| Type of Inventory | 09 MTR X 12 MTR PLOTS |
| No of Inventory | 43 |
| Carpet Area (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | CORNER | 12.6 X 12 MTRS | 151.2 | NA | NA | 12.6 | 12.6 | 12 | 12 | Site No.02 | 12 Mtr Road | 9 Mtr Road | Sy. No. 141/A3 |
| 2 | 2 | INTERMEDIATE | 11.925 X 9 MTRS | 107.325 | NA | NA | 11.925 | 11.925 | 9 | 9 | Site No.03 | Site No. 01 | 9 Mtr Road | Sy. No. 141/A3 |
| 3 | 3 | INTERMEDIATE | 11.335 X 9 MTRS | 102.015 | NA | NA | 11.335 | 11.335 | 9 | 9 | Site No. 04 | Site No. 02 | 9 Mtr Road | Sy. No. 141/A3 |
| 4 | 4 | INTERMEDIATE | 10.75 X 9 MTRS | 96.75 | NA | NA | 10.75 | 10.75 | 9 | 9 | Site No. 05 | Site No. 03 | 9 Mtr Road | Sy. No. 141/A3 |
| 5 | 5 | INTERMEDIATE | 10.13 X 10.54 MTRS | 106.7702 | NA | NA | 10.13 | 10.13 | 10.54 | 10.54 | C.A. | Site No.04 | 9 Mtr Road | Sy. No. 141/A3 |
| 6 | 6 | CORNER | 12 X 13.5 MTRS | 162 | NA | NA | 12 | 12 | 13.5 | 13.5 | 9 Mtr Road | Site No. 07 | Site No. 19 | 9 Mtr Road |
| 7 | 7 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 06 | Site No. 08 | Site No. 18 | 9 Mtr Road |
| 8 | 8 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 07 | Site No. 09 | Site No. 17 | 9 Mtr Road |
| 9 | 9 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 08 | Site No. 10 | Site No. 16 | 9 Mtr Road |
| 10 | 10 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 09 | Site No. 11 | Site No. 15 | 9 Mtr Road |
| 11 | 11 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 10 | Site No. 12 | Site No. 14 | 9 Mtr Road |
| 12 | 12 | CORNER | 12 X 12 MTRS | 144 | NA | NA | 12 | 12 | 12 | 12 | Site No. 11 | 12 Mtr Road | Site No. 13 | 9 Mtr Road |
| 13 | 13 | CORNER | 12 X 12 MTRS | 144 | NA | NA | 12 | 12 | 12 | 12 | Site No. 14 | 12 Mtr Road | 9 Mtr Road | Site No. 12 |
| 14 | 14 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 15 | Site No. 13 | 9 Mtr Road | Site No.11 |
| 15 | 15 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 16 | Site No. 14 | 9 Mtr Road | Site No. 10 |
| 16 | 16 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 17 | Site No. 15 | 9 Mtr Road | Site No. 09 |
| 17 | 17 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 18 | Site No. 16 | 9 Mtr Road | Site No. 08 |
| 18 | 18 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 19 | Site No. 17 | 9 Mtr Road | Site No.07 |
| 19 | 19 | CORNER | 12 X 13.5 MTRS | 162 | NA | NA | 12 | 12 | 13.5 | 13.5 | 9 Mtr Road | Site No. 18 | 9 Mtr Road | Site No.06 |
| 20 | 20 | CORNER | 12 X 13.5 MTRS | 162 | NA | NA | 12 | 12 | 13.5 | 13.5 | 9 Mtr Road | Site No. 21 | Site No. 33 | 9 Mtr Road |
| 21 | 21 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 20 | Site No. 22 | Site No. 32 | 9 Mtr Road |
| 22 | 22 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 21 | Site No. 23 | Site No. 31 | 9 Mtr Road |
| 23 | 23 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 22 | Site No. 24 | Site No. 30 | 9 Mtr Road |
| 24 | 24 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 23 | Site No. 25 | Site No. 29 | 9 Mtr Road |
| 25 | 25 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 24 | Site No. 26 | Site No. 28 | 9 Mtr Road |
| 26 | 26 | CORNER | 12 X 12 MTRS | 144 | NA | NA | 12 | 12 | 12 | 12 | Site No. 25 | 12 Mtr Road | Site No. 27 | 9 Mtr Road |
| 27 | 27 | CORNER | 12 X 12 MTRS | 144 | NA | NA | 12 | 12 | 12 | 12 | Site No. 28 | 12 Mtr Road | 9 Mtr Road | Site No. 26 |
| 28 | 28 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 29 | Site No. 27 | 9 Mtr Road | Site No. 25 |
| 29 | 29 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 30 | Site No. 28 | 9 Mtr Road | Site No.24 |
| 30 | 30 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 31 | Site No. 29 | 9 Mtr Road | Site No. 23 |
| 31 | 31 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No.32 | Site No. 30 | 9 Mtr Road | Site No.22 |
| 32 | 32 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 33 | Site No. 31 | 9 Mtr Road | Site No.21 |
| 33 | 33 | CORNER | 12 X 13.5 MTRS | 162 | NA | NA | 12 | 12 | 13.5 | 13.5 | 9 Mtr Road | Site No. 32 | 9 Mtr Road | Site No. 20 |
| 34 | 34 | CORNER | 12 X 13.5 MTRS | 162 | NA | NA | 12 | 12 | 13.5 | 13.5 | 9 Mtr Road | Site No. 35 | Site No. 47 | 9 Mtr Road |
| 35 | 35 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 34 | Site No. 36 | Site No. 46 | 9 Mtr Road |
| 36 | 36 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 35 | Site No. 37 | Site No. 45 | 9 Mtr Road |
| 37 | 37 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 36 | Site No. 38 | Site No. 44 | 9 Mtr Road |
| 38 | 38 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 37 | Site No. 39 | Site No. 43 | 9 Mtr Road |
| 39 | 39 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 38 | Site No. 40 | Site No. 42 | 9 Mtr Road |
| 40 | 40 | CORNER | 12 X 12 MTRS | 144 | NA | NA | 12 | 12 | 12 | 12 | Site No. 39 | 12 Mtr Road | Site No. 41 | 9 Mtr Road |
| 41 | 41 | CORNER | 12 X 12 MTRS | 144 | NA | NA | 12 | 12 | 12 | 12 | Site No. 42 | 12 Mtr Road | 9 Mtr Road | Site No. 40 |
| 42 | 42 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 43 | Site No. 41 | 9 Mtr Road | Site No. 39 |
| 43 | 43 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 44 | Site No. 42 | 9 Mtr Road | Site No. 38 |
| 44 | 44 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 45 | Site No. 43 | 9 Mtr Road | Site No. 37 |
| 45 | 45 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 46 | Site No. 44 | 9 Mtr Road | Site No. 36 |
| 46 | 46 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 47 | Site No. 45 | 9 Mtr Road | Site No. 35 |
| 47 | 47 | CORNER | 12 X 13.5 MTRS | 162 | NA | NA | 12 | 12 | 13.5 | 13.5 | 9 Mtr Road | Site No. 46 | 9 Mtr Road | Site No. 34 |
| 48 | 48 | CORNER | 12 X 13.5 MTRS | 162 | NA | NA | 12 | 12 | 13.5 | 13.5 | 9 Mtr Road | Site No. 49 | Site No. 61 | 9 Mtr Road |
| 49 | 49 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 48 | Site No. 50 | Site No. 60 | 9 Mtr Road |
| 50 | 50 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 49 | Site No. 51 | Site No. 59 | 9 Mtr Road |
| 51 | 51 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 50 | Site No. 52 | Site No. 58 | 9 Mtr Road |
| 52 | 52 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 51 | Site No. 53 | Site No. 57 | 9 Mtr Road |
| 53 | 53 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 52 | Site No. 54 | Site No. 56 | 9 Mtr Road |
| 54 | 54 | CORNER | 12 X 12 MTRS | 144 | NA | NA | 12 | 12 | 12 | 12 | Site No.53 | 12 Mtr Road | Site No. 55 | 9 Mtr Road |
| 55 | 55 | CORNER | 12 X 12 MTRS | 144 | NA | NA | 12 | 12 | 12 | 12 | Site No. 56 | 12 Mtr Road | 9 Mtr Road | Site No. 54 |
| 56 | 56 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 57 | Site No.55 | 9 Mtr Road | Site No. 53 |
| 57 | 57 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 58 | Site No.56 | 9 Mtr Road | Site No. 52 |
| 58 | 58 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 59 | Site No.57 | 9 Mtr Road | Site No. 51 |
| 59 | 59 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 60 | Site No. 58 | 9 Mtr Road | Site No. 50 |
| 60 | 60 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 61 | Site No. 59 | 9 Mtr Road | Site No. 49 |
| 61 | 61 | CORNER | 12 X 13.5 MTRS | 162 | NA | NA | 12 | 12 | 13.5 | 13.5 | 9 Mtr Road | Site No. 60 | 9 Mtr Road | Site No. 48 |
| 62 | 62 | CORNER | 12 X 13.5 MTRS | 162 | NA | NA | 12 | 12 | 13.5 | 13.5 | 9 Mtr Road | Site No. 63 | Site No. 71 | 9 Mtr Road |
| 63 | 63 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 62 | Site No. 64 | Site No. 70 | 9 Mtr Road |
| 64 | 64 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 63 | Site No. 65 | Site No. 69 | 9 Mtr Road |
| 65 | 65 | INTERMEDIATE | 12 X 9 MTRS | 108 | NA | NA | 12 | 12 | 9 | 9 | Site No. 65 | Site No. 66 | Site No. 68 | 9 Mtr Road |
| 66 | 66 | CORNER | 11.4 X 12 MTRS | 136.8 | NA | NA | 11.4 | 11.4 | 12 | 12 | Site No. 65 | 9 Mtr Road | Site No. 67 | 9 Mtr Road |
| 67 | 67 | CORNER | 12.74 X 11.455 MTRS | 145.9367 | NA | NA | 12.74 | 12.74 | 11.455 | 11.455 | Site No. 68 | 9 Mtr Road | 9 Mtr Road | Site No.66 |
| 68 | 68 | INTERMEDIATE | 14.12 X 9.04 MTRS | 127.6448 | NA | NA | 14.12 | 14.12 | 9.04 | 9.04 | Site No. 69 | Site No. 67 | 9 Mtr Road | Site No. 65 |
| 69 | 69 | INTERMEDIATE | 15.31 X 9.035 MTRS | 138.32585 | NA | NA | 15.31 | 15.31 | 9.035 | 9.035 | Site No. 70 | Site No. 68 | 9 Mtr Road | Site No. 64 |
| 70 | 70 | INTERMEDIATE | 16.53 X 9.045 MTRS | 149.51385 | NA | NA | 16.53 | 16.53 | 9.045 | 9.045 | Site No. 71 | Site No. 69 | 9 Mtr Road | Site No. 63 |
| 71 | 71 | CORNER | 18.085 X 13.59 MTRS | 245.77515 | NA | NA | 18.085 | 18.085 | 13.59 | 13.59 | 9 Mtr Road | Site No. 70 | 9 Mtr Road | Site No. 62 |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 01-05-2021 | 30-09-2021 |
| 2 | Formation Of Road, Footpath | Yes | 15-06-2021 | 31-12-2023 |
| 3 | Construction Of Water Supply Infrastucture | Yes | 17-08-2021 | 31-12-2022 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 01-10-2021 | 31-12-2022 |
| 5 | Power Supply Work(Transformer & Substation) | Yes | 01-09-2021 | 31-12-2022 |
| 6 | Construction Of Storm Water Drainage | Yes | 01-10-2021 | 31-12-2022 |
| 7 | Solid Waste Management and Disposal | No | ||
| 8 | Tree Plantation And LandScape Work | Yes | 01-01-2022 | 31-12-2023 |
| 9 | Street Lighting | Yes | 01-04-2021 | 31-12-2022 |
| 10 | Sewage Treatment Plant (STP) | No | ||
| 11 | Other Miscellaneous Work | No |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Piped Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning | No |
| Total number of Plots | 71 |
| No. of Public and Semi Pubic Sites | 1 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 191 |
| No. of Parks and Open Spaces | 3 |
| Area of Parks and Open Spaces(in Sq.m) | 1400 |
| Area of Road/Transportation(in Sq.m) | 5548 |
| Project Start Date | 01-04-2021 |
| Project End Date | 31-12-2023 |
| If any extension of time has been granted | NO |
| Cost of land | 2383666 |
| Cost of construction | 11760000 |
| Total cost | 14143666 |
| Total amount collected From buyers | 4200000 |
| Whether any loan has been raised | NO |
| Total amount spent on Project for completion of the project | 10651113 |
| Total No of sites of Project | 71 |
| Total No of sites sold | 10 |
| Total No of sites unsold | 61 |
| Whether there is any changes in inventory details | NO |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |


Ask Pulse Ai anything about real estate