COCOALDEA PREMIO
Bellam Ravichandra & Bellam Sasikala
SY.NO.15/3,15/4,16/1&16/3 , Abhichikkanahalli village,, Kasaba hobli,devanahalli taluk
Approved
11th Jul 2019
Completed
30th Jun 2021
Registration No.
PRM/KA/RERA/1250/303/PR/190711/002668
Acknowledgement No.
ACK/KA/RERA/1250/303/PR/190513/003283
Project Type
Plotted Development
Approving Authority
BIAPPA - Bangalore Airport Area Planning Authority
District
Bengaluru Rural
Taluka
Devanahalli
State
Karnataka
Project Details
| Project Name | COCOALDEA PREMIO |
| Project Description | layout |
| Project Type | Plotted Development |
| Project Status | Completed |
| Project Start Date | 24-01-2019 |
| Proposed Project Completion Date | 30-06-2021 |
| Total Area Of Land (Sq Mtr) | 20133 |
| Total Coverd Area (Sq Mtr) | 9811 |
| Total Open Area (Sq Mtr) | 10322 |
| Estimated Cost of Construction (INR) | 15000000 |
| Cost of Land (INR) | 125000000 |
| Total Project Cost (INR) | 140000000 |
| Project Address | SY.NO.15/3,15/4,16/1&16/3 , Abhichikkanahalli village,, Kasaba hobli,devanahalli taluk |
| District | Bengaluru Rural |
| Taluk | Devanahalli |
| Approving Authority | BIAPPA - Bangalore Airport Area Planning Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Self Development |
| Solid Waste Management And Disposal | Self Development |
| Fire Fighting facility | Self Development |
| Drinking Water Facility | Self Development |
| Emergency Evacuation Services | Self Development |
| Use of Renewable Energy | Self Development |
| Bank Name | Karur Vysya Bank Ltd. |
| Branch | Indiranagar |
| ifscCode | KVB0001332 |
| Account No.(70% Account) | 1332135000002766 |
| State | Karnataka |
Promoter Details
| Firm Type | Individual |
| Name | Bellam Ravichandra & Bellam Sasikala |
| Father's Name | Bellam Kotaiah |
| PAN Number | ABU******* |
| Address | 184,5th main,,defence colony |
| State/UT | Karnataka |
| PIN Code | 560038 |
Residential Plot Details
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | Residential | 1124 | 1124 | Phase 2 | Completed | 8.66 mtrs | 8.75 ntrs | 12 mtrs | 12 mtrs | Private Property | Plot-2 | Open space | Road |
| 2 | 2 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 1 | Plot 3 | Open space | Road |
| 3 | 3 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 2 | Plot 4 | Open space | Road |
| 4 | 4 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 3 | Plot 5 | Open space | Road |
| 5 | 5 | Residential | 1646 | 1646 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 4 | Road | Open space | Road |
| 6 | 6 | Residential | 1646 | 1646 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 7 | Road | Road | Plot 15 |
| 7 | 7 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 8 | Plot 6 | Road | Plot 14 |
| 8 | 8 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 9 | Plot 7 | Road | Plot 13 |
| 9 | 9 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 10 | Plot 8 | Road | Plot 12 |
| 10 | 10 | Residential | 1144 | 1144 | Phase 2 | Completed | 8.82 mtrs | 8.91 mtrs | 12 mtrs | 12 mtrs | Private Property | Plot 9 | Road | Plot 11 |
| 11 | 11 | Residential | 1156 | 1156 | Phase 2 | Completed | 8.91 mtrs | 9.00 mtrs | 12 mtrs | 12 mtrs | Private Property | Plot 12 | Plot 10 | Road |
| 12 | 12 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 11 | Plot 13 | Plot 9 | Road |
| 13 | 13 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 12 | Plot 14 | Plot 8 | Road |
| 14 | 14 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 13 | Plot 15 | Plot 7 | Road |
| 15 | 15 | Residential | 1646 | 1646 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 14 | Road | Plot 6 | Road |
| 16 | 16 | Residential | 1646 | 1646 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 17 | Road | Road | Plot 25 |
| 17 | 17 | Residential | 1200 | 1200 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 18 | Plot 16 | Road | Plot 24 |
| 18 | 18 | Residential | 1200 | 1200 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 19 | Plot 17 | Road | Plot 23 |
| 19 | 19 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 20 | Plot 18 | Road | Plot 22 |
| 20 | 20 | Residential | 1177 | 1177 | Phase 2 | Completed | 9.07 mtrs | 9.16 mtrs | 12 mtrs | 12 mtrs | Private Property | Plot 19 | Road | Plot 21 |
| 21 | 21 | Residential | 1188 | 1188 | Phase 2 | Completed | 9.16mtrs | 9.25 mtrs | 12 mtrs | 12 mtrs | Private Property | Plot 22 | Plot 20 | Road |
| 22 | 22 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 21 | Plot 23 | Plot 19 | Road |
| 23 | 23 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 22 | Plot 24 | Plot 18 | Road |
| 24 | 24 | Residential | 1200 | 1200 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 23 | Plot 25 | Plot 17 | Road |
| 25 | 25 | Residential | 1646 | 1646 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 24 | Road | Plot 16 | Road |
| 26 | 26 | Residential | 1646 | 1646 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 27 | Road | Road | Plot 35 |
| 27 | 27 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 28 | Plot 26 | Road | Plot 34 |
| 28 | 28 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 29 | Plot 27 | Road | Plot 33 |
| 29 | 29 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 30 | Plot 28 | Road | Plot 32 |
| 30 | 30 | Residential | 1208 | 1208 | Phase 2 | Completed | 9.32 mtrs | 9.08 mtrs | 12 mtrs | 12 mtrs | Private Property | Plot 29 | Road | Plot 31 |
| 31 | 31 | Residential | 1498 | 1498 | Phase 2 | Completed | 9.08 mtrs | 9.20 mtrs | 12 mtrs | 12 mtrs | Private Property | Plot 32 | Plot 30 | Road |
| 32 | 32 | Residential | 1498 | 1498 | Phase 2 | Completed | 9.14 mtrs | 9.14 mtrs | 15.24 mtrs | 15.24 mtrs | Plot 31 | Plot 33 | Plot 29 | Road |
| 33 | 33 | Residential | 1498 | 1498 | Phase 2 | Completed | 9.14 mtrs | 9.14 mtrs | 15.24 mtrs | 15.24 mtrs | Plot 32 | Plot 34 | Plot 28 | Road |
| 34 | 34 | Residential | 1498 | 1498 | Phase 2 | Completed | 9.14 mtrs | 9.14 mtrs | 15.24 mtrs | 15.24 mtrs | Plot 33 | Plot 35 | Plot 27 | Road |
| 35 | 35 | Residential | 2075 | 2075 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 34 | Road | Plot 26 | Road |
| 36 | 36 | Residential | 1646 | 1646 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 37 | Road | Road | Plot 45 |
| 37 | 37 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 38 | Plot 36 | Road | Plot 44 |
| 38 | 38 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 39 | Plot 37 | Road | Plot 43 |
| 39 | 39 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 40 | Plot 38 | Road | Plot 42 |
| 40 | 40 | Residential | 1247 | 1247 | Phase 2 | Completed | 9.61 mtrs | 9.70 mtrs | 12 mtrs | 12 mtrs | Private Property | Plot 39 | Road | Plot 41 |
| 41 | 41 | Residential | 1258 | 1258 | Phase 2 | Completed | 9.70 mtrs | 9.79 mtrs | 12 mtrs | 12 mtrs | Private Property | Plot 42 | Plot 40 | Road |
| 42 | 42 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 41 | Plot 43 | Plot 39 | Road |
| 43 | 43 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 42 | Plot 44 | Plot 38 | Road |
| 44 | 44 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 43 | Plot 45 | Plot 37 | Road |
| 45 | 45 | Residential | 1646 | 1646 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 44 | Road | Plot 36 | Road |
| 46 | 46 | Residential | 1646 | 1646 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 47 | Road | Road | Plot 55 |
| 47 | 47 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 48 | Plot 46 | Road | Plot 54 |
| 48 | 48 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 49 | Plot 47 | Road | Plot 53 |
| 49 | 49 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 50 | Plot 48 | Road | Plot 52 |
| 50 | 50 | Residential | 1279 | 1279 | Phase 2 | Completed | 9.86 mtrs | 9.95 mtrs | 12 mtrs | 12 mtrs | Private Property | Plot 49 | Road | Plot 51 |
| 51 | 51 | Residential | 1290 | 1290 | Phase 2 | Completed | 9.95 mtrs | 10.04 mtrs | 12 mtrs | 12 mtrs | Private Property | Plot 52 | Plot 50 | Road |
| 52 | 52 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 51 | Plot 53 | Plot 49 | Road |
| 53 | 53 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 52 | Plot 54 | Plot 48 | Road |
| 54 | 54 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 53 | Plot 55 | Plot 47 | Road |
| 55 | 55 | Residential | 1646 | 1646 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 54 | Road | Plot 46 | Road |
| 56 | 56 | Residential | 1646 | 1646 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 57 | Road | Road | Plot 65 |
| 57 | 57 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 58 | Plot 56 | Road | Plot 64 |
| 58 | 58 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 59 | Plot 57 | Road | Plot 63 |
| 59 | 59 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 60 | Plot 58 | Road | Plot 62 |
| 60 | 60 | Residential | 1311 | 1311 | Phase 2 | Completed | 10.11 mtrs | 10.20 mtrs | 12 mtrs | 12 mtrs | Private Property | Plot 59 | Road | Plot 61 |
| 61 | 61 | Residential | 1322 | 1322 | Phase 2 | Completed | 10.20 mtrs | 10.29 mtrs | 12 mtrs | 12 mtrs | Private Property | Plot 62 | Plot 60 | Road |
| 62 | 62 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 61 | Plot 63 | Plot 59 | Road |
| 63 | 63 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 62 | Plot 64 | Plot 58 | Road |
| 64 | 64 | Residential | 1163 | 1163 | Phase 2 | Completed | 9 mtrs | 9 mtrs | 12 mtrs | 12 mtrs | Plot 63 | Plot 65 | Plot 57 | Road |
| 65 | 65 | Residential | 1646 | 1646 | Phase 2 | Completed | 12.75 mtrs | 12.75 mtrs | 12 mtrs | 12 mtrs | Plot 64 | Road | Plot 56 | Road |
| 66 | 66 | Residential | 1542 | 1542 | Phase 2 | Completed | 11.28 mtrs | 11.16 mtrs | 11.99 mtrs | 13.62 mtrs | Private Property | Plot 67 | Road | Road |
| 67 | 67 | Residential | 1738 | 1738 | Phase 2 | Completed | 11.37 mtrs | 11.23 mtrs | 13.62 mtrs | 15.09 mtrs | Plot 66 | Phase 1 | Phase 1 | Road |
| 68 | 68 | Residential | 2848 | 2848 | Phase 2 | Completed | 11.19 mtrs | 11.12 mtrs | 23.73 mttrs | 23.73 mtrs | Plot 69 | Phase 1 | Road | Plot 71 |
| 69 | 69 | Residential | 2852 | 2852 | Phase 2 | Completed | 11.17 mtrs | 11.17 mtrs | 23.73 mttrs | 23.73 mtrs | Private Property | Plot 68 | Road | Plot 70 |
| 70 | 70 | Residential | 2886 | 2886 | Phase 2 | Completed | 11.17mtrs | 11.18 mtrs | 24.00 mtrs | 24.00 mtrs | Private Property | Plot 71 | Plot 69 | Road |
| 71 | 71 | Residential | 2862 | 2862 | Phase 2 | Completed | 11.12 mtrs | 11.05 mts | 24.00 mtrs | 24.00 mtrs | Plot 70 | Phase 1 | Plot 68 | Road |
| 72 | 72 | Commercial | 6474.6 | 6474.6 | Phase 2 | Completed | 22.36 mtrs | 22.29 mtrs | 26.89 mtrs | 26.99 mtrs | Private Property | Open space | civil amenities | Open space |
Project Development Schedule
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 02-02-2019 | 30-09-2019 |
| 2 | Formation Of Road, Footpath | Yes | 05-03-2019 | 30-09-2019 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 10-04-2019 | 30-09-2019 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 01-05-2019 | 30-09-2019 |
| 5 | Power Supply Work(Tansformer And Substation) | Yes | 01-05-2019 | 30-09-2019 |
| 6 | Construction Of Storm Water Drainage | Yes | 01-05-2019 | 30-09-2019 |
| 7 | Solid Waste Management and Disposal | Yes | 01-05-2019 | 30-09-2019 |
| 8 | Tree Plantation And LandScape Work | Yes | 01-06-2019 | 30-09-2019 |
| 9 | Street Lighting | Yes | 01-06-2019 | 30-09-2019 |
| 10 | Other Miscellaneous Work | Yes | 01-06-2019 | 30-09-2019 |
Amenities & Utilities Availability
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | Yes |
| 3 | CCTV surveillance | Yes |
| 4 | Club House | Yes |
| 5 | Community Hall | Yes |
| 6 | Outdoor Sports facility | Yes |
| 7 | Indoor sports facility | Yes |
| 8 | Swimming Pools | Yes |
| 9 | Gym | Yes |
| 10 | Parks | Yes |
| 11 | Power Backup | Yes |
| 12 | Gas | Yes |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning and incarnation | Yes |
Post Registration Details
| Total number of Plots | 72 |
| No. of Public and Semi Pubic Sites | 0 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 0 |
| No. of Parks and Open Spaces | 3 |
| Area of Parks and Open Spaces(in Sq.m) | 3096 |
| Area of Road/Transportation(in Sq.m) | 7226 |
Completion Details
| Name | Registered conveyance deed for an individual unit |
| Approval Date | 30-11-0002 |
Appeals & Complaints
| Appeals / FNH | NO APPEALS / FNH |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in