MERUSRI DEVELOPERS
Total Measuring of 4 Acar 24 guntas of Hosathota village, Kasaba Hobli, Devanahalli Taluk.
Approved
15th May 2020
Completed
30th Sept 2022
Registration No.
PRM/KA/RERA/1250/303/PR/200515/003395
Acknowledgement No.
ACK/KA/RERA/1250/303/PR/200113/003821
Project Type
Plotted Development
Approving Authority
BIAPPA - Bangalore Airport Area Planning Authority
District
Bengaluru Rural
Taluka
Devanahalli
State
Karnataka
| Project Name | MERUSRI SERENE |
| Project Description | Merusri Serene is a residential ploted development project with 74 residential plots and 1 commercial plot. |
| Project Type | Plotted Development |
| Project Status | New Project Launch |
| Project Start Date | 01-03-2020 |
| Proposed Project Completion Date | 30-09-2022 |
| Total Area Of Land (Sq Mtr) | 18615 |
| Total Coverd Area (Sq Mtr) | 8717 |
| Total Open Area (Sq Mtr) | 9898 |
| Estimated Cost of Construction (INR) | 22500000 |
| Cost of Land (INR) | 44600000 |
| Total Project Cost (INR) | 67100000 |
| Project Address | Total Measuring of 4 Acar 24 guntas of Hosathota village, Kasaba Hobli, Devanahalli Taluk. |
| District | Bengaluru Urban |
| Taluk | Devanahalli |
| Approving Authority | BIAPPA - Bangalore Airport Area Planning Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Type of Inventory | Residential Plots |
| No of Inventory | 75 |
| Carpet Area (Sq Mtr) | 0SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 18615SqMtr |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Self Development |
| Solid Waste Management And Disposal | Self Development |
| Fire Fighting facility | Self Development |
| Drinking Water Facility | Self Development |
| Emergency Evacuation Services | Self Development |
| Use of Renewable Energy | Self Development |
| parks | Self Development |
| Bank Name | Axis Bank |
| Branch | yelahanka |
| ifscCode | UTIB0000094 |
| Account No.(70% Account) | 919020093913101 |
| State | Karnataka |
| Name | RSP INFRATECH |
| Address | No 57 Ground Floor 4th cross ,Telecom Layout NR Thindlu Main Road |
| Pin Code | 560097 |
| Year Of Establishment | 2016 |
| Number Of Project Completed | 7 |
| Promoter Type | Partnership Firm |
| Name | M Maheswari |
| PAN Number | ABFFM2915G |
| Address | #301 E2 BLOCK SRIRAM SHREYAS APARTMENT,TELECOM LAYOUT, KODIGEHALLI.VIDYARANYAPURA POST BANGALORE |
| District | Bengaluru Urban |
| State/UT | Karnataka |
| PIN Code | 560092 |
| Company Registration No. | NOT APPLICABLE |
| Type | Others |
| Pin Code | 560072 |
| Type of Inventory | Residential Plots |
| No of Inventory | 75 |
| Carpet Area (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 18615 Sq Mtr |
| Extension Applied On | 11-02-2022 |
| Extension Approved On | 18-10-2022 |
| Extension Registration Number | EX/PRM/KA/RERA/1250/303/PR/221018/003395 |
| Proposed Project End Date at the time of registration | 28-05-2022 |
| Project End Date provided under Section 6 | 30-09-2022 |
| whether 2/3rd concern from the allottees has taken? | NO |
| Whether any compensation is provided for the Buyer? | NO |
| Document Name | OTHER SY NO EC'S |
| 1 | others |
| Document Name_1 | |
| Document Name_2 | |
| Document Name_3 |
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | Residential plot | 167.39 | D2*10.764 | Single phase | INITIAL | 15.29 | 14.97 | 9.77 | 12.42 | Sy.no.77/2 | Plot.No-02 | Sy.no.76/6 | Sy.no.76/5 & Existing 9m Road |
| 2 | 2 | Residential plot | 134.30 | D3*10.764 | Single phase | INITIAL | 14.97 | 14.87 | 9.00 | 9.00 | Plot.No-01 | Plot.No-03 | Sy.no.76/6 | Sy.no.76/5 & Existing 9m Road |
| 3 | 3 | Residential plot | 133.41 | D4*10.764 | Single phase | INITIAL | 14.87 | 14.77 | 9.00 | 9.00 | Plot.No-02 | Plot.No-04 | Sy.no.76/6 | Sy.no.76/5 & Existing 9m Road |
| 4 | 4 | Residential plot | 132.51 | D5*10.764 | Single phase | INITIAL | 14.77 | 14.67 | 9.00 | 9.00 | Plot.No-03 | Plot.No-05 | Sy.no.76/6 | Sy.no.76/5 & Existing 9m Road |
| 5 | 5 | Residential plot | 189.12 | D6*10.764 | Single phase | INITIAL | 14.67 | 14.59 | 12.32 | 13.58 | Plot.No-04 | Prasanahalli village Boundary | Sy.no.76/6 | Sy.no.76/5 & Existing 9m Road |
| 6 | 6 | Residential plot | 202.89 | D7*10.764 | Single phase | INITIAL | 11.57 | 17.10 | 13.54 | 16.11 | Plot.No-16 | Existing 9m Road | Plot.No-07 | Proposed 15MP Road |
| 7 | 7 | Residential plot | 117.98 | D8*10.764 | Single phase | INITIAL | 9.00 | 9.04 | 12.68 | 13.50 | Plot.No-16 | Existing 9m Road | Plot.No-08 | Plot.No-06 |
| 8 | 8 | Residential plot | 110.27 | D9*10.764 | Single phase | INITIAL | 9.00 | 9.04 | 11.82 | 12.68 | Plot.No-16 | Existing 9m Road | Plot.No-09 | Plot.No-07 |
| 9 | 9 | Residential plot | 103.07 | D10*10.764 | Single phase | INITIAL | 9.00 | 9.13 | 10.96 | 11.82 | Plot.No-16 | Existing 9m Road | Plot.No-10 | Plot.No-08 |
| 10 | 10 | Residential plot | 117.70 | D11*10.764 | Single phase | INITIAL | 12.00 | 2.87 | 16.36 | 11.84 | Plot.No-11 | Existing 9m Road | Existing 9m Road | Plot.No-09 |
| 11 | 11 | Residential plot | 108.00 | D12*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-12 | Plot.No-10 | Existing 9m Road | Plot.No-16 |
| 12 | 12 | Residential plot | 108.00 | D13*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-13 | Plot.No-11 | Existing 9m Road | Plot.No-16 & CA Area |
| 13 | 13 | Residential plot | 108.00 | D14*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-14 | Plot.No-12 | Sy.no.76/5 & Existing 9m Road | CA Area |
| 14 | 14 | Residential plot | 108.00 | D15*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-15 | Plot.No-13 | Sy.no.76/5 & Existing 9m Road | CA Area |
| 15 | 15 | Residential plot | 114.99 | D16*10.764 | Single phase | INITIAL | 6.03+6.07 | 12.00 | 8.81 | 9.84 | Plot.No-17 | Plot.No-14 | Sy.no.76/5 & Existing 9m Road | CA Area |
| 16 | 16 | Residential plot | 459.79 | D17*10.764 | Single phase | INITIAL | 33.90 | 38.57 | 12.69 | 13.49 | CA Area | Plot.No's 6,7,8 & 9 | Plot.No's 10,11 & 12 | Proposed 15MP Road |
| 17 | 17 | Residential plot | 526.14 | D18*10.764 | Single phase | INITIAL | 28.19 | 27.40 | 18.67 | 21.39 | Plot.No-18 | CA Area | Existing 9m Road | Proposed 15MP Road |
| 18 | 18 | Residential plot | 297.07 | D19*10.764 | Single phase | INITIAL | 28.61 | 28.19 | 9.35 | 12.08 | Prasanahalli village Boundary | Plot.No-17 | Existing 9m Road | Proposed 15MP Road |
| 19 | 19 | Residential plot | 251.95 | D20*10.764 | Single phase | INITIAL | 18.94 | 13.08 | 16.20 | 16.17 | 12m Wide Road | Plot.No-21 | Proposed 15MP Road | Plot.No-20 |
| 20 | 20 | Residential plot | 150.04 | D21*10.764 | Single phase | INITIAL | 9.16 | 9.14 | 16.17 | 16.66 | 12m Wide Road | Plot.No-21 | Plot.No-19 | Plot.No-33 |
| 21 | 21 | Residential plot | 242.25 | D22*10.764 | Single phase | INITIAL | 22.22 | 17.53 | 13.03 | 12.19 | Plot.No's 19 & 20 | Plot.No-22 | Proposed 15MP Road | Plot.No's 30 & 31 |
| 22 | 22 | Residential plot | 185.04 | D23*10.764 | Single phase | INITIAL | 17.53 | 12.83 | 13.03 | 12.19 | Plot.No-21 | Plot.No-23 | Proposed 15MP Road | Plot.No's 29 & 30 |
| 23 | 23 | Residential plot | 123.14 | D24*10.764 | Single phase | INITIAL | 12.83 | 8.36 | 12.42 | 11.62 | Plot.No-22 | Plot.No-24 | Proposed 15MP Road | Plot.No's 28 & 29 |
| 24 | 24 | Residential plot | 167.66 | D25*10.764 | Single phase | INITIAL | 20.36 | 16.90 | 9.62 | 9.00 | Plot.No's 23 & 28 | Plot.No-25 | Proposed 15MP Road | 9m Wide Road |
| 25 | 25 | Residential plot | 136.48 | D26*10.764 | Single phase | INITIAL | 16.90 | 13.49 | 9.62 | 9.00 | Plot.No-24 | Plot.No-26 | Proposed 15MP Road | 9m Wide Road |
| 26 | 26 | Residential plot | 105.29 | D27*10.764 | Single phase | INITIAL | 13.43 | 9.97 | 9.62 | 9.00 | Plot.No-25 | Plot.No-27 | Proposed 15MP Road | 9m Wide Road |
| 27 | 27 | Residential plot | 67.55 | D28*10.764 | Single phase | INITIAL | 9.97 | 7.00 | 8.28 | 8.29 | Plot.No-26 | Prasanahalli village Boundary | Proposed 15MP Road | 9m Wide Road |
| 28 | 28 | Residential plot | 108.00 | D29*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-29 | Plot.No-24 | Plot.No-23 | 9m Wide Road |
| 29 | 29 | Residential plot | 108.00 | D30*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-30 | Plot.No-28 | Plot.No's 23 & 22 | 9m Wide Road |
| 30 | 30 | Residential plot | 108.00 | D31*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-31 | Plot.No-29 | Plot.No's 21 & 22 | 9m Wide Road |
| 31 | 31 | Residential plot | 108.00 | D32*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-32 | Plot.No-30 | Plot.No-21 | 9m Wide Road |
| 32 | 32 | Residential plot | 108.00 | D33*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-33 | Plot.No-31 | Plot.No-20 | 9m Wide Road |
| 33 | 33 | Residential plot | 95.82 | D34*10.764 | Single phase | INITIAL | 12.02 | 12.00 | 7.66 | 8.31 | 12m Wide Road | Plot.No-32 | Plot.No-20 | 9m Wide Road |
| 34 | 34 | Residential plot | 109.39 | D35*10.764 | Single phase | INITIAL | 12.02 | 12.00 | 8.79 | 9.44 | 12m Wide Road | Plot.No-35 | 9m Wide Road | Plot.No-53 |
| 35 | 35 | Residential plot | 108.00 | D36*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-34 | Plot.No-36 | 9m Wide Road | Plot.No-52 |
| 36 | 36 | Residential plot | 108.00 | D37*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-35 | Plot.No-37 | 9m Wide Road | Plot.No-51 |
| 37 | 37 | Residential plot | 108.00 | D38*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-36 | Plot.No-38 | 9m Wide Road | Plot.No-50 |
| 38 | 38 | Residential plot | 108.00 | D39*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-37 | Plot.No-39 | 9m Wide Road | Plot.No-49 |
| 39 | 39 | Residential plot | 108.00 | D40*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-38 | Plot.No-40 | 9m Wide Road | Plot.No-48 |
| 40 | 40 | Residential plot | 108.00 | D41*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-39 | Plot.No-41 | 9m Wide Road | Plot.No-47 |
| 41 | 41 | Residential plot | 108.00 | D42*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-40 | Plot.No-42 | 9m Wide Road | Plot.No-46 |
| 42 | 42 | Residential plot | 108.00 | D43*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-41 | Plot.No-43 | 9m Wide Road | Plot.No-45 |
| 43 | 43 | Residential plot | 113.67 | D44*10.764 | Single phase | INITIAL | 12.00 | 12.03 | 9.00 | 9.94 | Plot.No-42 | Prasanahalli village Boundary | 9m Wide Road | Plot.No-44 |
| 44 | 44 | Residential plot | 127.67 | D45*10.764 | Single phase | INITIAL | 12.00 | 6.14+6.02 | 9.94 | 11.80 | Plot.No-45 | Prasanahalli village Boundary | Plot.No-43 | 9m Wide Road |
| 45 | 45 | Residential plot | 108.00 | D46*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-46 | Plot.No-44 | Plot.No-42 | 9m Wide Road |
| 46 | 46 | Residential plot | 108.00 | D47*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-47 | Plot.No-45 | Plot.No-41 | 9m Wide Road |
| 47 | 47 | Residential plot | 108.00 | D48*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-48 | Plot.No-46 | Plot.No-40 | 9m Wide Road |
| 48 | 48 | Residential plot | 108.00 | D49*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-49 | Plot.No-47 | Plot.No-39 | 9m Wide Road |
| 49 | 49 | Residential plot | 108.00 | D50*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-50 | Plot.No-48 | Plot.No-38 | 9m Wide Road |
| 50 | 50 | Residential plot | 108.00 | D51*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-51 | Plot.No-49 | Plot.No-37 | 9m Wide Road |
| 51 | 51 | Residential plot | 108.00 | D52*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-52 | Plot.No-50 | Plot.No-36 | 9m Wide Road |
| 52 | 52 | Residential plot | 108.00 | D53*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-53 | Plot.No-51 | Plot.No-35 | 9m Wide Road |
| 53 | 53 | Residential plot | 117.15 | D54*10.764 | Single phase | INITIAL | 12.02 | 12.00 | 9.44 | 10.09 | 12m Wide Road | Plot.No-52 | Plot.No-34 | 9m Wide Road |
| 54 | 54 | Residential plot | 115.25 | D55*10.764 | Single phase | INITIAL | 12.02 | 12.00 | 9.28 | 9.93 | 12m Wide Road | Plot.No-55 | 9m Wide Road | Plot.No-75 |
| 55 | 55 | Residential plot | 108.00 | D56*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-54 | Plot.No-56 | 9m Wide Road | Plot.No-74 |
| 56 | 56 | Residential plot | 108.00 | D57*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-55 | Plot.No-57 | 9m Wide Road | Plot.No-73 |
| 57 | 57 | Residential plot | 108.00 | D58*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-56 | Plot.No-58 | 9m Wide Road | Plot.No-72 |
| 58 | 58 | Residential plot | 108.00 | D59*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-57 | Plot.No-59 | 9m Wide Road | Plot.No-71 |
| 59 | 59 | Residential plot | 108.00 | D60*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-58 | Plot.No-60 | 9m Wide Road | Plot.No-70 |
| 60 | 60 | Residential plot | 108.00 | D61*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-59 | Plot.No-61 | 9m Wide Road | Plot.No-69 |
| 61 | 61 | Residential plot | 108.00 | D62*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-60 | Plot.No-62 | 9m Wide Road | Plot.No-68 |
| 62 | 62 | Residential plot | 108.00 | D63*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-61 | Plot.No-63 | 9m Wide Road | Plot.No-67 |
| 63 | 63 | Residential plot | 108.00 | D64*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-62 | Plot.No-64 | 9m Wide Road | Plot.No-66 |
| 64 | 64 | Residential plot | 91.27 | D65*10.764 | Single phase | INITIAL | 12.00 | 12.31 | 6.19 | 9.00 | Plot.No-63 | Prasanahalli village Boundary | 9m Wide Road | Plot.No-65 |
| 65 | 65 | Residential plot | 124.84 | D66*10.764 | Single phase | INITIAL | 12.00 | 12.31 | 9.00 | 11.81 | Plot.No-66 | Prasanahalli village Boundary | Plot.No-64 | 9m Wide Road |
| 66 | 66 | Residential plot | 108.00 | D67*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-67 | Plot.No-65 | Plot.No-63 | 9m Wide Road |
| 67 | 67 | Residential plot | 108.00 | D68*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-68 | Plot.No-66 | Plot.No-62 | 9m Wide Road |
| 68 | 68 | Residential plot | 108.00 | D69*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-69 | Plot.No-67 | Plot.No-61 | 9m Wide Road |
| 69 | 69 | Residential plot | 108.00 | D70*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-70 | Plot.No-68 | Plot.No-60 | 9m Wide Road |
| 70 | 70 | Residential plot | 108.00 | D71*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-71 | Plot.No-69 | Plot.No-59 | 9m Wide Road |
| 71 | 71 | Residential plot | 108.00 | D72*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-72 | Plot.No-70 | Plot.No-58 | 9m Wide Road |
| 72 | 72 | Residential plot | 108.00 | D73*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-73 | Plot.No-71 | Plot.No-57 | 9m Wide Road |
| 73 | 73 | Residential plot | 108.00 | D74*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-74 | Plot.No-72 | Plot.No-56 | 9m Wide Road |
| 74 | 74 | Residential plot | 108.00 | D75*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-75 | Plot.No-73 | Plot.No-55 | 9m Wide Road |
| 75 | 75 | Residential plot | 123.01 | D76*10.764 | Single phase | INITIAL | 12.02 | 12.00 | 9.93 | 10.57 | 12m Wide Road | Plot.No-74 | Plot.No-54 | 9m Wide Road |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 01-11-2020 | 20-12-2020 |
| 2 | Formation Of Road, Footpath | Yes | 17-02-2021 | 30-04-2021 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 14-01-2021 | 26-02-2021 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 01-01-2021 | 27-04-2021 |
| 5 | Power Supply Work(Tansformer And Substation) | Yes | 12-11-2020 | 26-02-2021 |
| 6 | Construction Of Storm Water Drainage | Yes | 25-12-2020 | 01-04-2021 |
| 7 | Solid Waste Management and Disposal | Yes | 18-12-2020 | 20-02-2021 |
| 8 | Tree Plantation And LandScape Work | Yes | 27-11-2020 | 25-02-2021 |
| 9 | Street Lighting | Yes | 07-01-2021 | 11-05-2021 |
| 10 | Other Miscellaneous Work | Yes | 23-12-2020 | 19-03-2021 |
| 11 | Rain water Harvesting | Yes | 14-04-2021 | 30-06-2021 |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning and incarnation | No |
| Total number of Plots | 75 |
| No. of Public and Semi Pubic Sites | 2 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 1466 |
| No. of Parks and Open Spaces | 2 |
| Area of Parks and Open Spaces(in Sq.m) | 5904 |
| Area of Road/Transportation(in Sq.m) | 5904 |
| Appeals / FNH | NO APPEALS / FNH |