MERUSRI SERENE
MERUSRI DEVELOPERS
Total Measuring of 4 Acar 24 guntas of Hosathota village, Kasaba Hobli, Devanahalli Taluk.
Approved
15th May 2020
Completed
30th Sept 2022
Registration No.
PRM/KA/RERA/1250/303/PR/200515/003395
Acknowledgement No.
ACK/KA/RERA/1250/303/PR/200113/003821
Project Type
Plotted Development
Approving Authority
BIAPPA - Bangalore Airport Area Planning Authority
District
Bengaluru Rural
Taluka
Devanahalli
State
Karnataka
Project Details
| Project Name | MERUSRI SERENE |
| Project Description | Merusri Serene is a residential ploted development project with 74 residential plots and 1 commercial plot. |
| Project Type | Plotted Development |
| Project Status | Completed |
| Project Start Date | 01-03-2020 |
| Proposed Project Completion Date | 30-09-2022 |
| Total Area Of Land (Sq Mtr) | 18615 |
| Total Coverd Area (Sq Mtr) | 8717 |
| Total Open Area (Sq Mtr) | 9898 |
| Estimated Cost of Construction (INR) | 22500000 |
| Cost of Land (INR) | 44600000 |
| Total Project Cost (INR) | 67100000 |
| Project Address | Total Measuring of 4 Acar 24 guntas of Hosathota village, Kasaba Hobli, Devanahalli Taluk. |
| District | Bengaluru Urban |
| Taluk | Devanahalli |
| Approving Authority | BIAPPA - Bangalore Airport Area Planning Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Type of Inventory | Residential Plots |
| No of Inventory | 75 |
| Carpet Area (Sq Mtr) | 0SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 18615SqMtr |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Self Development |
| Solid Waste Management And Disposal | Self Development |
| Fire Fighting facility | Self Development |
| Drinking Water Facility | Self Development |
| Emergency Evacuation Services | Self Development |
| Use of Renewable Energy | Self Development |
| parks | Self Development |
| Bank Name | Axis Bank |
| Branch | yelahanka |
| ifscCode | UTIB0000094 |
| Account No.(70% Account) | 919020093913101 |
| State | Karnataka |
| Name | RSP INFRATECH |
| Address | No 57 Ground Floor 4th cross ,Telecom Layout NR Thindlu Main Road |
| Pin Code | 560097 |
| Year Of Establishment | 2016 |
| Number Of Project Completed | 7 |
Promoter Details
| Promoter Type | Partnership Firm |
| Name | M Maheswari |
| PAN Number | ABF******* |
| Address | #301 E2 BLOCK SRIRAM SHREYAS APARTMENT,TELECOM LAYOUT, KODIGEHALLI.VIDYARANYAPURA POST BANGALORE |
| District | Bengaluru Urban |
| State/UT | Karnataka |
| PIN Code | 560092 |
| Company Registration No. | NOT APPLICABLE |
| Type | Others |
| Pin Code | 560072 |
Modification Plan Details
| Type of Inventory | Residential Plots |
| No of Inventory | 75 |
| Carpet Area (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 18615 Sq Mtr |
Extension Details
| Extension Applied On | 11-02-2022 |
| Extension Approved On | 18-10-2022 |
| Extension Registration Number | EX/PRM/KA/RERA/1250/303/PR/221018/003395 |
| Proposed Project End Date at the time of registration | 28-05-2022 |
| Project End Date provided under Section 6 | 30-09-2022 |
| whether 2/3rd concern from the allottees has taken? | NO |
| Whether any compensation is provided for the Buyer? | NO |
| Document Name | OTHER SY NO EC'S |
| 1 | others |
| Document Name_1 | |
| Document Name_2 | |
| Document Name_3 |
Residential Plot Details
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | Residential plot | 167.39 | D2*10.764 | Single phase | INITIAL | 15.29 | 14.97 | 9.77 | 12.42 | Sy.no.77/2 | Plot.No-02 | Sy.no.76/6 | Sy.no.76/5 & Existing 9m Road |
| 2 | 2 | Residential plot | 134.30 | D3*10.764 | Single phase | INITIAL | 14.97 | 14.87 | 9.00 | 9.00 | Plot.No-01 | Plot.No-03 | Sy.no.76/6 | Sy.no.76/5 & Existing 9m Road |
| 3 | 3 | Residential plot | 133.41 | D4*10.764 | Single phase | INITIAL | 14.87 | 14.77 | 9.00 | 9.00 | Plot.No-02 | Plot.No-04 | Sy.no.76/6 | Sy.no.76/5 & Existing 9m Road |
| 4 | 4 | Residential plot | 132.51 | D5*10.764 | Single phase | INITIAL | 14.77 | 14.67 | 9.00 | 9.00 | Plot.No-03 | Plot.No-05 | Sy.no.76/6 | Sy.no.76/5 & Existing 9m Road |
| 5 | 5 | Residential plot | 189.12 | D6*10.764 | Single phase | INITIAL | 14.67 | 14.59 | 12.32 | 13.58 | Plot.No-04 | Prasanahalli village Boundary | Sy.no.76/6 | Sy.no.76/5 & Existing 9m Road |
| 6 | 6 | Residential plot | 202.89 | D7*10.764 | Single phase | INITIAL | 11.57 | 17.10 | 13.54 | 16.11 | Plot.No-16 | Existing 9m Road | Plot.No-07 | Proposed 15MP Road |
| 7 | 7 | Residential plot | 117.98 | D8*10.764 | Single phase | INITIAL | 9.00 | 9.04 | 12.68 | 13.50 | Plot.No-16 | Existing 9m Road | Plot.No-08 | Plot.No-06 |
| 8 | 8 | Residential plot | 110.27 | D9*10.764 | Single phase | INITIAL | 9.00 | 9.04 | 11.82 | 12.68 | Plot.No-16 | Existing 9m Road | Plot.No-09 | Plot.No-07 |
| 9 | 9 | Residential plot | 103.07 | D10*10.764 | Single phase | INITIAL | 9.00 | 9.13 | 10.96 | 11.82 | Plot.No-16 | Existing 9m Road | Plot.No-10 | Plot.No-08 |
| 10 | 10 | Residential plot | 117.70 | D11*10.764 | Single phase | INITIAL | 12.00 | 2.87 | 16.36 | 11.84 | Plot.No-11 | Existing 9m Road | Existing 9m Road | Plot.No-09 |
| 11 | 11 | Residential plot | 108.00 | D12*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-12 | Plot.No-10 | Existing 9m Road | Plot.No-16 |
| 12 | 12 | Residential plot | 108.00 | D13*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-13 | Plot.No-11 | Existing 9m Road | Plot.No-16 & CA Area |
| 13 | 13 | Residential plot | 108.00 | D14*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-14 | Plot.No-12 | Sy.no.76/5 & Existing 9m Road | CA Area |
| 14 | 14 | Residential plot | 108.00 | D15*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-15 | Plot.No-13 | Sy.no.76/5 & Existing 9m Road | CA Area |
| 15 | 15 | Residential plot | 114.99 | D16*10.764 | Single phase | INITIAL | 6.03+6.07 | 12.00 | 8.81 | 9.84 | Plot.No-17 | Plot.No-14 | Sy.no.76/5 & Existing 9m Road | CA Area |
| 16 | 16 | Residential plot | 459.79 | D17*10.764 | Single phase | INITIAL | 33.90 | 38.57 | 12.69 | 13.49 | CA Area | Plot.No's 6,7,8 & 9 | Plot.No's 10,11 & 12 | Proposed 15MP Road |
| 17 | 17 | Residential plot | 526.14 | D18*10.764 | Single phase | INITIAL | 28.19 | 27.40 | 18.67 | 21.39 | Plot.No-18 | CA Area | Existing 9m Road | Proposed 15MP Road |
| 18 | 18 | Residential plot | 297.07 | D19*10.764 | Single phase | INITIAL | 28.61 | 28.19 | 9.35 | 12.08 | Prasanahalli village Boundary | Plot.No-17 | Existing 9m Road | Proposed 15MP Road |
| 19 | 19 | Residential plot | 251.95 | D20*10.764 | Single phase | INITIAL | 18.94 | 13.08 | 16.20 | 16.17 | 12m Wide Road | Plot.No-21 | Proposed 15MP Road | Plot.No-20 |
| 20 | 20 | Residential plot | 150.04 | D21*10.764 | Single phase | INITIAL | 9.16 | 9.14 | 16.17 | 16.66 | 12m Wide Road | Plot.No-21 | Plot.No-19 | Plot.No-33 |
| 21 | 21 | Residential plot | 242.25 | D22*10.764 | Single phase | INITIAL | 22.22 | 17.53 | 13.03 | 12.19 | Plot.No's 19 & 20 | Plot.No-22 | Proposed 15MP Road | Plot.No's 30 & 31 |
| 22 | 22 | Residential plot | 185.04 | D23*10.764 | Single phase | INITIAL | 17.53 | 12.83 | 13.03 | 12.19 | Plot.No-21 | Plot.No-23 | Proposed 15MP Road | Plot.No's 29 & 30 |
| 23 | 23 | Residential plot | 123.14 | D24*10.764 | Single phase | INITIAL | 12.83 | 8.36 | 12.42 | 11.62 | Plot.No-22 | Plot.No-24 | Proposed 15MP Road | Plot.No's 28 & 29 |
| 24 | 24 | Residential plot | 167.66 | D25*10.764 | Single phase | INITIAL | 20.36 | 16.90 | 9.62 | 9.00 | Plot.No's 23 & 28 | Plot.No-25 | Proposed 15MP Road | 9m Wide Road |
| 25 | 25 | Residential plot | 136.48 | D26*10.764 | Single phase | INITIAL | 16.90 | 13.49 | 9.62 | 9.00 | Plot.No-24 | Plot.No-26 | Proposed 15MP Road | 9m Wide Road |
| 26 | 26 | Residential plot | 105.29 | D27*10.764 | Single phase | INITIAL | 13.43 | 9.97 | 9.62 | 9.00 | Plot.No-25 | Plot.No-27 | Proposed 15MP Road | 9m Wide Road |
| 27 | 27 | Residential plot | 67.55 | D28*10.764 | Single phase | INITIAL | 9.97 | 7.00 | 8.28 | 8.29 | Plot.No-26 | Prasanahalli village Boundary | Proposed 15MP Road | 9m Wide Road |
| 28 | 28 | Residential plot | 108.00 | D29*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-29 | Plot.No-24 | Plot.No-23 | 9m Wide Road |
| 29 | 29 | Residential plot | 108.00 | D30*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-30 | Plot.No-28 | Plot.No's 23 & 22 | 9m Wide Road |
| 30 | 30 | Residential plot | 108.00 | D31*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-31 | Plot.No-29 | Plot.No's 21 & 22 | 9m Wide Road |
| 31 | 31 | Residential plot | 108.00 | D32*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-32 | Plot.No-30 | Plot.No-21 | 9m Wide Road |
| 32 | 32 | Residential plot | 108.00 | D33*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-33 | Plot.No-31 | Plot.No-20 | 9m Wide Road |
| 33 | 33 | Residential plot | 95.82 | D34*10.764 | Single phase | INITIAL | 12.02 | 12.00 | 7.66 | 8.31 | 12m Wide Road | Plot.No-32 | Plot.No-20 | 9m Wide Road |
| 34 | 34 | Residential plot | 109.39 | D35*10.764 | Single phase | INITIAL | 12.02 | 12.00 | 8.79 | 9.44 | 12m Wide Road | Plot.No-35 | 9m Wide Road | Plot.No-53 |
| 35 | 35 | Residential plot | 108.00 | D36*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-34 | Plot.No-36 | 9m Wide Road | Plot.No-52 |
| 36 | 36 | Residential plot | 108.00 | D37*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-35 | Plot.No-37 | 9m Wide Road | Plot.No-51 |
| 37 | 37 | Residential plot | 108.00 | D38*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-36 | Plot.No-38 | 9m Wide Road | Plot.No-50 |
| 38 | 38 | Residential plot | 108.00 | D39*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-37 | Plot.No-39 | 9m Wide Road | Plot.No-49 |
| 39 | 39 | Residential plot | 108.00 | D40*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-38 | Plot.No-40 | 9m Wide Road | Plot.No-48 |
| 40 | 40 | Residential plot | 108.00 | D41*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-39 | Plot.No-41 | 9m Wide Road | Plot.No-47 |
| 41 | 41 | Residential plot | 108.00 | D42*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-40 | Plot.No-42 | 9m Wide Road | Plot.No-46 |
| 42 | 42 | Residential plot | 108.00 | D43*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-41 | Plot.No-43 | 9m Wide Road | Plot.No-45 |
| 43 | 43 | Residential plot | 113.67 | D44*10.764 | Single phase | INITIAL | 12.00 | 12.03 | 9.00 | 9.94 | Plot.No-42 | Prasanahalli village Boundary | 9m Wide Road | Plot.No-44 |
| 44 | 44 | Residential plot | 127.67 | D45*10.764 | Single phase | INITIAL | 12.00 | 6.14+6.02 | 9.94 | 11.80 | Plot.No-45 | Prasanahalli village Boundary | Plot.No-43 | 9m Wide Road |
| 45 | 45 | Residential plot | 108.00 | D46*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-46 | Plot.No-44 | Plot.No-42 | 9m Wide Road |
| 46 | 46 | Residential plot | 108.00 | D47*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-47 | Plot.No-45 | Plot.No-41 | 9m Wide Road |
| 47 | 47 | Residential plot | 108.00 | D48*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-48 | Plot.No-46 | Plot.No-40 | 9m Wide Road |
| 48 | 48 | Residential plot | 108.00 | D49*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-49 | Plot.No-47 | Plot.No-39 | 9m Wide Road |
| 49 | 49 | Residential plot | 108.00 | D50*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-50 | Plot.No-48 | Plot.No-38 | 9m Wide Road |
| 50 | 50 | Residential plot | 108.00 | D51*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-51 | Plot.No-49 | Plot.No-37 | 9m Wide Road |
| 51 | 51 | Residential plot | 108.00 | D52*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-52 | Plot.No-50 | Plot.No-36 | 9m Wide Road |
| 52 | 52 | Residential plot | 108.00 | D53*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-53 | Plot.No-51 | Plot.No-35 | 9m Wide Road |
| 53 | 53 | Residential plot | 117.15 | D54*10.764 | Single phase | INITIAL | 12.02 | 12.00 | 9.44 | 10.09 | 12m Wide Road | Plot.No-52 | Plot.No-34 | 9m Wide Road |
| 54 | 54 | Residential plot | 115.25 | D55*10.764 | Single phase | INITIAL | 12.02 | 12.00 | 9.28 | 9.93 | 12m Wide Road | Plot.No-55 | 9m Wide Road | Plot.No-75 |
| 55 | 55 | Residential plot | 108.00 | D56*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-54 | Plot.No-56 | 9m Wide Road | Plot.No-74 |
| 56 | 56 | Residential plot | 108.00 | D57*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-55 | Plot.No-57 | 9m Wide Road | Plot.No-73 |
| 57 | 57 | Residential plot | 108.00 | D58*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-56 | Plot.No-58 | 9m Wide Road | Plot.No-72 |
| 58 | 58 | Residential plot | 108.00 | D59*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-57 | Plot.No-59 | 9m Wide Road | Plot.No-71 |
| 59 | 59 | Residential plot | 108.00 | D60*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-58 | Plot.No-60 | 9m Wide Road | Plot.No-70 |
| 60 | 60 | Residential plot | 108.00 | D61*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-59 | Plot.No-61 | 9m Wide Road | Plot.No-69 |
| 61 | 61 | Residential plot | 108.00 | D62*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-60 | Plot.No-62 | 9m Wide Road | Plot.No-68 |
| 62 | 62 | Residential plot | 108.00 | D63*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-61 | Plot.No-63 | 9m Wide Road | Plot.No-67 |
| 63 | 63 | Residential plot | 108.00 | D64*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-62 | Plot.No-64 | 9m Wide Road | Plot.No-66 |
| 64 | 64 | Residential plot | 91.27 | D65*10.764 | Single phase | INITIAL | 12.00 | 12.31 | 6.19 | 9.00 | Plot.No-63 | Prasanahalli village Boundary | 9m Wide Road | Plot.No-65 |
| 65 | 65 | Residential plot | 124.84 | D66*10.764 | Single phase | INITIAL | 12.00 | 12.31 | 9.00 | 11.81 | Plot.No-66 | Prasanahalli village Boundary | Plot.No-64 | 9m Wide Road |
| 66 | 66 | Residential plot | 108.00 | D67*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-67 | Plot.No-65 | Plot.No-63 | 9m Wide Road |
| 67 | 67 | Residential plot | 108.00 | D68*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-68 | Plot.No-66 | Plot.No-62 | 9m Wide Road |
| 68 | 68 | Residential plot | 108.00 | D69*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-69 | Plot.No-67 | Plot.No-61 | 9m Wide Road |
| 69 | 69 | Residential plot | 108.00 | D70*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-70 | Plot.No-68 | Plot.No-60 | 9m Wide Road |
| 70 | 70 | Residential plot | 108.00 | D71*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-71 | Plot.No-69 | Plot.No-59 | 9m Wide Road |
| 71 | 71 | Residential plot | 108.00 | D72*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-72 | Plot.No-70 | Plot.No-58 | 9m Wide Road |
| 72 | 72 | Residential plot | 108.00 | D73*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-73 | Plot.No-71 | Plot.No-57 | 9m Wide Road |
| 73 | 73 | Residential plot | 108.00 | D74*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-74 | Plot.No-72 | Plot.No-56 | 9m Wide Road |
| 74 | 74 | Residential plot | 108.00 | D75*10.764 | Single phase | INITIAL | 12.00 | 12.00 | 9.00 | 9.00 | Plot.No-75 | Plot.No-73 | Plot.No-55 | 9m Wide Road |
| 75 | 75 | Residential plot | 123.01 | D76*10.764 | Single phase | INITIAL | 12.02 | 12.00 | 9.93 | 10.57 | 12m Wide Road | Plot.No-74 | Plot.No-54 | 9m Wide Road |
Project Development Schedule
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 01-11-2020 | 20-12-2020 |
| 2 | Formation Of Road, Footpath | Yes | 17-02-2021 | 30-04-2021 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 14-01-2021 | 26-02-2021 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 01-01-2021 | 27-04-2021 |
| 5 | Power Supply Work(Tansformer And Substation) | Yes | 12-11-2020 | 26-02-2021 |
| 6 | Construction Of Storm Water Drainage | Yes | 25-12-2020 | 01-04-2021 |
| 7 | Solid Waste Management and Disposal | Yes | 18-12-2020 | 20-02-2021 |
| 8 | Tree Plantation And LandScape Work | Yes | 27-11-2020 | 25-02-2021 |
| 9 | Street Lighting | Yes | 07-01-2021 | 11-05-2021 |
| 10 | Other Miscellaneous Work | Yes | 23-12-2020 | 19-03-2021 |
| 11 | Rain water Harvesting | Yes | 14-04-2021 | 30-06-2021 |
Amenities & Utilities Availability
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning and incarnation | No |
Post Registration Details
| Total number of Plots | 75 |
| No. of Public and Semi Pubic Sites | 2 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 1466 |
| No. of Parks and Open Spaces | 2 |
| Area of Parks and Open Spaces(in Sq.m) | 5904 |
| Area of Road/Transportation(in Sq.m) | 5904 |
Appeals & Complaints
| Appeals / FNH | NO APPEALS / FNH |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Mangalore


Ask Pulse Ai anything about real estate





