Tota Green Homes LLP
Post No 5 Devagiri Farms , Rayasndra Village Devanahalli
Approved
4th May 2018
Completed
21st Jan 2020
Registration No.
PRM/KA/RERA/1250/303/PR/180504/001603
Acknowledgement No.
PR/KN/180215/002725
Project Type
Plotted Development
Approving Authority
BIAPPA - Bangalore Airport Area Planning Authority
District
Bengaluru Rural
Taluka
Devanahalli
State
Karnataka
| Project Name | Total Green Homes LLP |
| Project Description | Ploted Developnment |
| Project Type | Plotted Development |
| Project Status | Ongoing |
| Project Start Date | 23-01-2018 |
| Proposed Project Completion Date | 21-01-2020 |
| Total Area Of Land (Sq Mtr) | 19829 |
| Total Coverd Area (Sq Mtr) | 9891 |
| Total Open Area (Sq Mtr) | 19829 |
| Estimated Cost of Construction (INR) | 40200000 |
| Cost of Land (INR) | 72868000 |
| Total Project Cost (INR) | 113068000 |
| Project Address | Post No 5 Devagiri Farms , Rayasndra Village Devanahalli |
| District | Bengaluru Urban |
| Taluk | Devanahalli |
| Approving Authority | BIAPPA - Bangalore Airport Area Planning Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Extent of development carried till date | 15 % |
| Extent of development pending | 85 % |
| Total amount of money collected from allottee | 24120000 |
| Total amount of money used for development of project | 21520000 |
| Total amount of balance maney lying with promoter | 2600000 |
| Reason For Delay | NA |
| No of Month Delay | 0 |
| Type of Inventory | Open Ploted Sites |
| No of Inventory | 40 |
| Carpet Area (Sq Mtr) | 0SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0SqMtr |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Local Authority |
| Solid Waste Management And Disposal | Self Development |
| Fire Fighting facility | Self Development |
| Drinking Water Facility | Self Development |
| Emergency Evacuation Services | Self Development |
| Use of Renewable Energy | Self Development |
| Ploted Developnment | Self Development |
| Bank Name | HDFC |
| Branch | RICHMOND ROAD |
| ifscCode | HDFC0000523 |
| Account No.(70% Account) | 57500000346435 |
| State | Karnataka |
| Promoter Type | Other |
| Name | Chandini D Purnesh |
| PAN Number | AAJFT2407M |
| Address | Flat No S 101 Reddhi Einka, No 4 Rehnius Street , Richmond Town Bangalore |
| District | Bengaluru Urban |
| State/UT | Karnataka |
| PIN Code | 560025 |
| Company Registration No. | AAC3303 |
| Type of Inventory | Open Ploted Sites |
| No of Inventory | 40 |
| Carpet Area (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 135 | Vacant Site | 115.1 | 115.1 | Phase II | ongoing | 12.2 | 12.19 | 9.14 | 9.74 | Road | Site No. 136 | Road | Site No. 142 |
| 2 | 136 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 135 | Site No. 137 | Road | Site No. 141 |
| 3 | 137 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 136 | Site No. 138 | Road | Site No. 140 |
| 4 | 138 | Vacant Site | 82.19 | 82.19 | Phase II | ongoing | 12.19 | 12.02 | 6.92 | 6.56 | Site No. 137 | Sy No. 91 | Road | Site No. 139 |
| 5 | 139 | Vacant Site | 77.75 | 77.75 | Phase II | ongoing | 12.19 | 12.02 | 6.56 | 6.02 | Site No. 140 | Sy No. 91 | Site No. 138 | Road |
| 6 | 140 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 141 | Site No. 139 | Site No. 137 | Road |
| 7 | 141 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 142 | Site No. 140 | Site No. 136 | Road |
| 8 | 142 | Vacant Site | 122.46 | 122.46 | Phase II | ongoing | 12.02 | 12.19 | 9.74 | 10.35 | Road | Site No. 141 | Site No. 135 | Road |
| 9 | 143 | Vacant Site | 115.1 | 115.1 | Phase II | ongoing | 12.02 | 12.19 | 9.14 | 9.74 | Road | Site No. 144 | Road | Site No. 150 |
| 10 | 144 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 143 | Site No. 145 | Road | Site No. 149 |
| 11 | 145 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 144 | Site No, 146 | Road | Site No. 148 |
| 12 | 146 | Vacant Site | 90.22 | 90.22 | Phase II | ongoing | 12.02 | 1.19 | 7.58 | 7.22 | Site No. 145 | Sy No. 91 | Road | Site No. 147 |
| 13 | 147 | Vacant Site | 85.79 | 85.79 | Phase II | ongoing | 12.19 | 12.02 | 7.22 | 6.86 | Site No. 148 | Sy No. 91 | Site No. 146 | Road |
| 14 | 148 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 149 | Site No. 147 | Site No. 145 | Road |
| 15 | 149 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 150 | Site No. 148 | Site No. 144 | Road |
| 16 | 150 | Vacant Site | 122.46 | 122.46 | Phase II | ongoing | 12.02 | 12.19 | 9.74 | 10.35 | Road | Site No. 149 | Site No. 143 | Road |
| 17 | 151 | Vacant Site | 115.1 | 115.1 | Phase II | ongoing | 12.02 | 12.19 | 9.14 | 9.74 | Road | Site No. 152 | Road | Site No. 158 |
| 18 | 152 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 151 | Site No. 153 | Road | Site No. 157 |
| 19 | 153 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 152 | Site No. 154 | Road | Site No. 156 |
| 20 | 154 | Vacant Site | 98.25 | 98.25 | Phase II | ongoing | 12.19 | 12.02 | 8.24 | 7.88 | Site No. 153 | Sy No. 91 | Road | Site No. 155 |
| 21 | 155 | Vacant Site | 93.82 | 93.82 | Phase II | ongoing | 12.19 | 12.02 | 7.88 | 7.52 | Site No. 156 | Sy No. 91 | Site No. 154 | Road |
| 22 | 156 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 157 | Site No. 155 | Site No. 153 | Road |
| 23 | 157 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 158 | Site No. 156 | Site No. 152 | Road |
| 24 | 158 | Vacant Site | 122.46 | 122.46 | Phase II | ongoing | 12.02 | 12.19 | 9.74 | 10.35 | Road | Site No. 157 | Site No. 151 | Road |
| 25 | 159 | Vacant Site | 119.41 | 119.41 | Phase II | ongoing | 13.6 | 13.36 | 8.9 | 8.49 | Site No. 160 | Sy No. 91 | Road | Sy No. 112 |
| 26 | 160 | Vacant Site | 123.08 | 123.08 | Phase II | ongoing | 13.13 | 13.6 | 9.14 | 9.14 | Site No. 161 | Site No. 159 | Road | Sy No. 112 |
| 27 | 161 | Vacant Site | 120.57 | 120.57 | Phase II | ongoing | 13.05 | 13.33 | 9.14 | 9.14 | Site No. 162 | Site No. 160 | Road | Sy No. 112 |
| 28 | 162 | Vacant Site | 121.29 | 121.29 | Phase II | ongoing | 12.6 | 13.5 | 9.14 | 9.78 | Road | Site No. 161 | Road | Site No. 163 |
| 29 | 163 | Vacant Site | 116.78 | 116.78 | Phase II | ongoing | 12.14 | 12.18 | 9.15 | 10.09 | Road | Sy No. 112 | Site No. 162 | Site No. 164 |
| 30 | 164 | Vacant Site | 115.68 | 115.68 | Phase II | ongoing | 11 | 11.03 | 10.09 | 10.94 | Road | Sy No. 112 | Site No. 163 | Site No. 165 |
| 31 | 165 | Vacant Site | 113.3 | 113.3 | Phase II | ongoing | 10 | 10.03 | 10.94 | 11.72 | Road | Sy No. 112 | Site No. 164 | Site No. 166 |
| 32 | 166 | Vacant Site | 110.33 | 110.33 | Phase II | ongoing | 9.14 | 12.17 | 11.72 | 12.43 | Road | Sy No. 112 | Site No. 165 | Site No. 167 |
| 33 | 167 | Vacant Site | 116.81 | 116.81 | Phase II | ongoing | 9.14 | 9.17 | 12.43 | 13.13 | Road | Sy No. 112 | Site No. 166 | Site No. 168 |
| 34 | 168 | Vacant Site | 123.28 | 123.28 | Phase II | ongoing | 9.14 | 9.17 | 13.13 | 13.84 | Road | Sy No. 112 | Site No. 167 | Site No. 169 |
| 35 | 169 | Vacant Site | 129.76 | 129.76 | Phase II | ongoing | 9.14 | 9.17 | 13.84 | 14.55 | Road | Sy No. 112 | Site No. 168 | Site No. 170 |
| 36 | 170 | Vacant Site | 136.23 | 136.23 | Phase II | ongoing | 9.14 | 9.17 | 14.55 | 15.26 | Road | Sy No. 112 | Site No. 169 | Road |
| 37 | 171 | Vacant Site | 155.03 | 155.03 | Phase II | ongoing | 12.19 | 12.02 | 13 | 12.43 | Site No. 172 | Road | Site No. 106&107 | Road |
| 38 | 172 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 173 | Site No. 171 | Site No. 107&108 | Road |
| 39 | 173 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 174 | Site No. 172 | Site No. 108&109 | Road |
| 40 | 174 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 175 | Site No. 173 | Site No. 109&110 | Road |
| 41 | 175 | Vacant Site | 111.41 | 116.24 | Phase II | ongoing | 12.22 | 12.19 | 9.14 | 9.93 | Sy No. 86 | Site No. 174 | Site No. 110&111 | Road |
| 42 | 176 | Vacant Site | 111.41 | 116.24 | Phase II | ongoing | 12.22 | 12.19 | 9.14 | 9.93 | Sy No. 86 | Site No. 177 | Road | Site No. 185 |
| 43 | 177 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 176 | Site No. 178 | Road | Site No. 184 |
| 44 | 178 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 177 | Site No. 179 | Road | Site No. 183 |
| 45 | 179 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 178 | Site No. 180 | Road | Site No. 182 |
| 46 | 180 | Vacant Site | 159.62 | 159.62 | Phase II | ongoing | 12.19 | 12.02 | 13.38 | 12.81 | Site No. 179 | Road | Road | Site No. 181 |
| 47 | 181 | Vacant Site | 152.62 | 152.62 | Phase II | ongoing | 12.19 | 12.02 | 12.81 | 12.23 | Site No. 182 | Road | Site No. 180 | Road |
| 48 | 182 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 183 | Site No. 181 | Site No. 179 | Road |
| 49 | 183 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 184 | Site No. 182 | Site No. 178 | Road |
| 50 | 184 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 185 | Site No. 183 | Site No. 177 | Road |
| 51 | 185 | Vacant Site | 125.88 | 125.88 | Phase II | ongoing | 12.22 | 12.19 | 9.93 | 10.72 | Sy No. 86 | Site No. 184 | Site No. 176 | Road |
| 52 | 186 | Vacant Site | 116.24 | 116.24 | Phase II | ongoing | 12.22 | 12.19 | 9.14 | 9.93 | Sy No. 86 | Site No. 187 | Road | Site No. 195 |
| 53 | 187 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 186 | Site No. 188 | Road | Site No. 194 |
| 54 | 188 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 187 | Site No 189 | Road | Site No. 193 |
| 55 | 189 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 188 | Site No. 190 | Road | Site No. 192 |
| 56 | 190 | Vacant Site | 166.85 | 166.85 | Phase II | ongoing | 12.19 | 12.02 | 13.97 | 13.4 | Site No. 189 | Road | Road | Site No. 191 |
| 57 | 191 | Vacant Site | 159.85 | 159.85 | Phase II | ongoing | 12.19 | 12.02 | 13.04 | 12.83 | Site No. 192 | Road | Site No. 190 | Road |
| 58 | 192 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 193 | Site No. 191 | Site No. 189 | Road |
| 59 | 193 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 194 | Site No. 192 | Site No. 188 | Road |
| 60 | 194 | Vacant Site | 111.41 | 111.41 | Phase II | ongoing | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 195 | Site No. 193 | Site No. 187 | Road |
| 61 | 195 | Vacant Site | 125.88 | 125.88 | Phase II | ongoing | 12.22 | 12.02 | 9.93 | 10.72 | Sy No. 86 | Site No. 194 | Site No. 186 | Road |
| 62 | 196 | Vacant Site | 131.61 | 131.61 | Phase II | ongoing | 9.14 | 9.79 | 13.92 | 13.09 | CA Site | Road | Road | Site No. 197 |
| 63 | 197 | Vacant Site | 127.05 | 127.05 | Phase II | ongoing | 9.14 | 9.14 | 13.9 | 13.9 | CA Site | Road | Site No. 196 | Site No. 198 |
| 64 | 198 | Vacant Site | 98.75 | 98.75 | Phase II | ongoing | 7.67 | 6.54 | 13.9 | 13.95 | CA Site | Road | Site No. 197 | Sy. No. 9 |
| 65 | 199 | Vacant Site | 158.39 | 158.39 | Phase II | ongoing | 12.99 | 12.99 | 12.19 | 12.19 | Site No. 200 | Road | Sy No. 73 | Road |
| 66 | 200 | Vacant Site | 158.39 | 158.39 | Phase II | ongoing | 12.99 | 12.99 | 12.19 | 12.19 | Site No. 201 | Site No. 199 | Sy No. 73 | Road |
| 67 | 201 | Vacant Site | 158.39 | 158.39 | Phase II | ongoing | 12.99 | 12.99 | 12.19 | 12.19 | Site No. 202 | Site No. 200 | Sy No. 73 | Road |
| 68 | 202 | Vacant Site | 158.39 | 158.39 | Phase II | ongoing | 12.99 | 12.99 | 12.19 | 12.19 | Site No. 203 | Site No. 201 | Sy No. 73 | Road |
| 69 | 203 | Vacant Site | 158.39 | 158.39 | Phase II | ongoing | 12.99 | 12.99 | 12.19 | 12.19 | Site No. 204 | Site No. 202 | Sy No. 73 | Road |
| 70 | 204 | Vacant Site | 158.39 | 158.39 | Phase II | ongoing | 12.99 | 12.99 | 12.19 | 12.19 | Site No. 205 | Site No. 203 | Sy No. 73 | Road |
| 71 | 205 | Vacant Site | 174.69 | 174.69 | Phase II | ongoing | 12.99 | 12.99 | 13.44 | 13.44 | Road | Site No. 204 | Sy No. 73 | Road |
| 72 | 206 | Vacant Site | 204.89 | 204.89 | Phase II | ongoing | 15.24 | 15.24 | 13.44 | 13.44 | Road | Site No. 207 | Road | Sy No. 71 |
| 73 | 207 | Vacant Site | 185.77 | 185.77 | Phase II | ongoing | 15.24 | 15.24 | 12.19 | 12.19 | Site No. 206 | Site No. 208 | Road | Sy No. 71 |
| 74 | 208 | Vacant Site | 185.77 | 185.77 | Phase II | ongoing | 15.24 | 15.24 | 12.19 | 12.19 | Site No. 207 | Site No. 209 | Road | Sy No. 71 |
| 75 | 209 | Vacant Site | 185.77 | 185.77 | Phase II | ongoing | 15.24 | 15.24 | 12.19 | 12.19 | Site No. 208 | Site No. 210 | Road | Sy No. 71 |
| 76 | 210 | Vacant Site | 185.77 | 185.77 | Phase II | ongoing | 15.24 | 15.24 | 12.19 | 12.19 | Site No. 209 | Site No. 211 | Road | Sy No. 71 |
| 77 | 211 | Vacant Site | 185.77 | 185.77 | Phase II | ongoing | 15.24 | 15.24 | 12.19 | 12.19 | Site No. 210 | 212 | Road | Sy No. 71 |
| 78 | 212 | Vacant Site | 185.78 | 185.77 | Phase II | ongoing | 15.24 | 15.24 | 12.19 | 12.19 | Site No. 211 | Road | Road | Sy No. 71 |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 15-02-2018 | 01-12-2019 |
| 2 | Formation Of Road, Footpath | Yes | 15-02-2018 | 15-03-2019 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 15-02-2018 | 15-03-2019 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 15-02-2018 | 15-03-2019 |
| 5 | Power Supply Work(Tansformer And Substation) | Yes | 15-02-2018 | 15-03-2019 |
| 6 | Construction Of Storm Water Drainage | Yes | 15-02-2018 | 15-03-2019 |
| 7 | Solid Waste Management and Disposal | Yes | 15-02-2018 | 15-03-2019 |
| 8 | Tree Plantation And LandScape Work | Yes | 15-02-0008 | 15-03-2019 |
| 9 | Street Lighting | Yes | 15-02-2018 | 01-12-2019 |
| 10 | Other Miscellaneous Work | Yes | 15-02-2018 | 01-12-2019 |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Power Backup | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Electricity | Yes |
| 12 | Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning and incarnation | No |
| WebSite Link 1 | www.tghindia.com |
| Agent Registration No 1 | NO |
| Total number of Plots | 78 |
| No. of Public and Semi Pubic Sites | 1 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 995 |
| No. of Parks and Open Spaces | 3 |
| Area of Parks and Open Spaces(in Sq.m) | 2118 |
| Area of Road/Transportation(in Sq.m) | 6826 |
| Name | Registered conveyance deed for an individual unit |
| Approval Date | 20-12-2019 |
| Appeals / FNH | NO APPEALS / FNH |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |