Aprameya Properties Pvt Ltd
Survey No.45, Manganahalli village,, Yeshwanthapura Hobli, Bangalore North Taluk
Approved
20th Jan 2018
Completed
31st Mar 2018
Registration No.
PRM/KA/RERA/1251/309/PR/180120/001566
Acknowledgement No.
PR/KN/170830/001566
Project Type
Plotted Development
Approving Authority
Local Planing Authority
District
Bengaluru Urban
Taluka
Bengaluru North
State
Karnataka
| Project Name | Aprameya Prasiddhi |
| Project Description | BMICAPA Approved Plotted development |
| Project Type | Plotted Development |
| Project Status | Completed |
| Project Start Date | 01-08-2015 |
| Proposed Project Completion Date | 31-03-2018 |
| Total Area Of Land (Sq Mtr) | 20437 |
| Total Coverd Area (Sq Mtr) | 10542 |
| Total Open Area (Sq Mtr) | 9894 |
| Estimated Cost of Construction (INR) | 24850000 |
| Cost of Land (INR) | 122961190 |
| Total Project Cost (INR) | 147811190 |
| Project Address | Survey No.45, Manganahalli village,, Yeshwanthapura Hobli, Bangalore North Taluk |
| District | Bengaluru Urban |
| Taluk | Bengaluru North |
| Approving Authority | Local Planing Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Local Authority |
| Solid Waste Management And Disposal | Local Authority |
| Fire Fighting facility | Local Authority |
| Drinking Water Facility | Self Development |
| Emergency Evacuation Services | Local Authority |
| Use of Renewable Energy | Local Authority |
| Bank Name | LAKSHMI VILAS BANK |
| Branch | Banashankari |
| ifscCode | LAVB0000180 |
| Account No.(70% Account) | 0180360000000441 |
| State | Karnataka |
| Promoter Type | Company |
| Name | Prasanna Kumar K |
| PAN Number | AAICA3490R |
| Address | #20, Sri Krishna Nilaya.Chikkalasandra, Subramanyapura Post |
| District | Bengaluru Urban |
| State/UT | Karnataka |
| PIN Code | 560061 |
| Company Registration No. | U70102KA2010PTC052781 |
| Type | Director |
| Pin Code | 560061 |
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | Residential | odd*18.29 | 199.54 | Phase I | Completed | 14.95 | 18.29 | 9.56 | 12.26 | PVT. PROPERTY | SITE NO.2 | 15 Mtrs Rd | SITE NO.20 AND 21 |
| 2 | 2 | Residential | 12.19 *18.29 | 222.96 | Phase I | Completed | 18.29 | 18.29 | 12.19 | 12.19 | SITE NO.1 | SITE NO.3 | 15 Mtrs Rd | SITE NO.19 AND 20 |
| 3 | 3 | Residential | 12.19*18.29 | 222.96 | Phase I | Completed | 18.29 | 18.29 | 12.19 | 12.19 | SITE NO.2 | SITE NO.4 | 15 Mtrs Rd | SITE NO.18 AND 19 |
| 4 | 4 | Residential | 12.19 *18.29 | 222.96 | Phase I | Completed | 18.29 | 18.29 | 12.19 | 12.19 | SITE NO.3 | SITE NO.5 | 15 Mtrs Rd | SITE NO.16 AND 17 |
| 5 | 5 | Residential | 12.19*18.29 | 222.96 | Phase I | Completed | 18.29 | 18.29 | 12.19 | 12.19 | SITE NO.4 | SITE NO.6 | 15 Mtrs Rd | SITE NO.15 AND 16 |
| 6 | 6 | Residential | 12.19 *18.29 | 222.96 | Phase I | Completed | 18.29 | 18.29 | 12.19 | 12.19 | SITE NO.5 | SITE NO.7 | 15 Mtrs Rd | SITE NO.14 AND 15 |
| 7 | 7 | Residential | 12.19*18.29 | 222.96 | Phase I | Completed | 18.29 | 18.29 | 12.19 | 12.19 | SITE NO.6 | SITE NO.8 | 15 Mtrs Rd | SITE NO.12 AND 13 |
| 8 | 8 | Residential | 10.16*18.29 | 185.27 | Phase I | Completed | 18.29 | 18.33 | 10.16 | 10.1 | SITE NO.7 | 12 MTR ROAD | 15 Mtrs Rd | SITE NO.12 |
| 9 | 9 | Residential | 15.24*15.29 | 232.63 | Phase I | Completed | 15.24 | 15.24 | 15.24 | 15.29 | 12 MTR ROAD | SITE NO.10 | 15 Mtrs Rd | 3 Mtr Pathway and Park |
| 10 | 10 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.9 | SITE NO.11 | 15 Mtrs Rd | 3 Mtr Pathway and Park |
| 11 | 11 | Residential | odd*15.24 | 198.8 | Phase I | Completed | 15.24 | 9.47 | 14.51 | 11.58 | SITE NO.10 | PVT PROPERTY | 15 Mtrs Rd | 3 mtr Pathway and Park15 Mtrs Road |
| 12 | 12 | Residential | odd*15.24 | 201.55 | Phase I | Completed | 15.24 | 15.24 | 13.25 | 13.2 | SITE NO.13 | 12 MTRS RD | SITE NO.7 & 8 | 10 Mtrs Rd |
| 13 | 13 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.14 | SITE NO.12 | SITE NO.7 | 10 Mtrs Rd |
| 14 | 14 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.15 | SITE NO.13 | SITE NO.6 | 10 Mtrs Rd |
| 15 | 15 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.16 | SITE NO.14 | SITE NO.5 & 6 | 10 Mtrs Rd |
| 16 | 16 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.17 | SITE NO.15 | SITE NO.4 &5 | 10 Mtrs Rd |
| 17 | 17 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.18 | SITE NO.16 | SITE NO.4 | 10 Mtrs Rd |
| 18 | 18 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.19 | SITE NO.17 | SITE NO.3 | 10 Mtrs Rd |
| 19 | 19 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.20 | SITE NO.18 | SITE NO.2 & 3 | 10 Mtrs Rd |
| 20 | 20 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.21 | SITE NO.19 | SITE NO.1 & 2 | 10 Mtrs Rd |
| 21 | 21 | Residential | odd*15.24 | 154.22 | Phase I | Completed | 15.37 | 15.24 | 9.14 | 11.1 | PVT. PROPERTY | SITE NO.20 | SITE NO.1 | 10 Mtrs Rd |
| 22 | 22 | Residential | odd*15.24 | 138.6 | Phase I | Completed | 15.37 | 15.24 | 8.12 | 10.07 | PVT. PROPERTY | SITE NO.23 | 10 MTR RD | SITE NO.43 |
| 23 | 23 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.22 | SITE NO.24 | 10 MTR RD | SITE NO.42 |
| 24 | 24 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.23 | SITE NO.25 | 10 MTR RD | SITE NO.41 |
| 25 | 25 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.24 | SITE NO.26 | 10 MTR RD | SITE NO.40 |
| 26 | 26 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.25 | SITE NO.27 | 10 MTR RD | SITE NO.39 |
| 27 | 27 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.26 | SITE NO.28 | 10 MTR RD | SITE NO.38 |
| 28 | 28 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.27 | SITE NO.29 | 10 MTR RD | SITE NO.37 |
| 29 | 29 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.28 | SITE NO.30 | 10 MTR RD | SITE NO.36 |
| 30 | 30 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.29 | SITE NO,31 | 10 MTR RD | SITE NO.35 |
| 31 | 31 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.30 | SITE NO.32 | 10 MTR RD | SITE NO.34 |
| 32 | 32 | Residential | odd*15.24 | 125.95 | Phase I | Completed | 15.24 | 15.24 | 8.29 | 8.24 | SITE NO.31 | 12 MTR ROAD | 10 MTR RD | SITE NO.33 |
| 33 | 33 | Residential | odd*12.19 | 100.2 | Phase I | Completed | 12.19 | 12.19 | 8.24 | 8.2 | SITE NO.34 | 12 MTR RD | SITE NO.32 | 10 MTR RD |
| 34 | 34 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.35 | SITE NO.33 | SITE NO.31 | 10 MTR RD |
| 35 | 35 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.36 | SITE NO.34 | SITE NO.30 | 10 MTR RD |
| 36 | 36 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.37 | SITE NO.35 | SITE NO.29 | 10 MTR RD |
| 37 | 37 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.38 | SITE NO.36 | SITE NO.28 | 10 MTR RD |
| 38 | 38 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.39 | SITE NO.37 | SITE NO.27 | 10 MTR RD |
| 39 | 39 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.40 | SITE NO.38 | SITE NO.26 | 10 MTR RD |
| 40 | 40 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.41 | SITE NO.39 | SITE NO.25 | 10 MTR RD |
| 41 | 41 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.42 | SITE NO.40 | SITE NO.24 | 10 MTR RD |
| 42 | 42 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.43 | SITE NO.41 | SITE NO.23 | 10 MTR RD |
| 43 | 43 | Residential | odd*12.19 | 132.32 | Phase I | Completed | 12.29 | 12.19 | 10.07 | 11.64 | PVT. PROPERTY | SITE NO.42 | SITE NO.22 | 10 MTR RD |
| 44 | 44 | Residential | odd*15.24 | 154.22 | Phase I | Completed | 15.37 | 15.24 | 9.14 | 11.1 | PVT. PROPERTY | SITE NO.45 | 10 MTR RD | SITE NO.65 |
| 45 | 45 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.44 | SITE NO.46 | 10 MTR RD | SITE NO.64 |
| 46 | 46 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.45 | SITE NO.47 | 10 MTR RD | SITE NO.63 |
| 47 | 47 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.46 | SITE NO.48 | 10 MTR RD | SITE NO.62 |
| 48 | 48 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.47 | SITE NO.49 | 10 MTR RD | SITE NO.61 |
| 49 | 49 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.48 | SITE NO.50 | 10 MTR RD | SITE NO.60 |
| 50 | 50 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.49 | SITE NO.51 | 10 MTR RD | SITE NO.59 |
| 51 | 51 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.50 | SITE NO.52 | 10 MTR RD | SITE NO.58 |
| 52 | 52 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.51 | SITE NO.53 | 10 MTR RD | SITE NO.57 |
| 53 | 53 | Residential | 9.14*15.24 | 139.29 | Phase I | Completed | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.52 | SITE NO.54 | 10 MTR RD | SITE NO.56 |
| 54 | 54 | Residential | odd*15.24 | 181.73 | Phase I | Completed | 15.24 | 15.24 | 11.95 | 11.9 | SITE NO.53 | 12 MTRS RD | 10 MTR RD | SITE NO.55 |
| 55 | 55 | Residential | odd*12.19 | 144.81 | Phase I | Completed | 12.19 | 12.19 | 11.9 | 11.86 | SITE NO.56 | 12 MTRS RD | SITE NO.54 | 10 Mtrs Rd |
| 56 | 56 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.57 | SITE NO.55 | SITE NO.53 | 10 Mtrs Rd |
| 57 | 57 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.58 | SITE NO.56 | SITE NO.52 | 10 Mtrs Rd |
| 58 | 58 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.59 | SITE NO.57 | SITE NO.51 | 10 Mtrs Rd |
| 59 | 59 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.60 | SITE NO.58 | SITE NO.50 | 10 Mtrs Rd |
| 60 | 60 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.61 | SITE NO.59 | SITE NO.49 | 10 Mtrs Rd |
| 61 | 61 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.62 | SITE NO.60 | SITE NO.48 | 10 Mtrs Rd |
| 62 | 62 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.63 | SITE NO.61 | SITE NO.47 | 10 Mtrs Rd |
| 63 | 63 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.64 | SITE NO.62 | SITE NO.46 | 10 Mtrs Rd |
| 64 | 64 | Residential | 9.14*12.19 | 111.42 | Phase I | Completed | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.65 | SITE NO.63 | SITE NO.45 | 10 Mtrs Rd |
| 65 | 65 | Residential | odd*12.19 | 144.81 | Phase I | Completed | 12.29 | 12.19 | 11.1 | 12.66 | PVT. PROPERTY | SITE NO.64 | SITE NO.44 | 10 Mtrs Rd |
| 66 | 66 | Residential | 9.14*odd | 160.9 | Phase I | Completed | 18.06 | 17.2 | 9.14 | 9.18 | 3 MTRS PATHWAY & PARK | SITE NO.67 | 10 MTR RD | PVT PROPERTY |
| 67 | 67 | Residential | 9.14*odd | 153.23 | Phase I | Completed | 17.2 | 16.33 | 9.14 | 9.14 | SITE NO.66 | SITE NO.68 | 10 MTR RD | PVT PROPERTY |
| 68 | 68 | Residential | 9.14*odd | 145.32 | Phase I | Completed | 16.33 | 15.47 | 9.14 | 9.14 | SITE NO.67 | SITE NO.69 | 10 MTR RD | PVT PROPERTY |
| 69 | 69 | Residential | 9.14*odd | 137.46 | Phase I | Completed | 15.47 | 14.61 | 9.14 | 9.14 | SITE NO.68 | SITE NO.70 | 10 MTR RD | PVT PROPERTY |
| 70 | 70 | Residential | 9.14*odd | 129.6 | Phase I | Completed | 14.61 | 13.75 | 9.14 | 9.14 | SITE NO.69 | SITE NO.71 | 10 MTR RD | PVT PROPERTY |
| 71 | 71 | Residential | 9.14*odd | 243.39 | Phase I | Completed | 13.75 | 12.88 | 9.14 | 9.14 | SITE NO.70 | SITE NO.72 | 10 MTR RD | PVT PROPERTY |
| 72 | 72 | Residential | 9.14*odd | 9.14 | Phase I | Completed | 12.88 | 12.02 | 9.14 | 9.14 | SITE NO.71 | SITE NO.73 | 10 MTR RD | PVT PROPERTY |
| 73 | 73 | Residential | 9.14*odd | 105.93 | Phase I | Completed | 12.02 | 11.16 | 9.14 | 9.14 | SITE NO.72 | SITE NO.74 | 10 MTR RD | PVT PROPERTY |
| 74 | 74 | Residential | Odd | 77.29 | Phase I | Completed | 11.16 | 10.49 | 7.14 | 7.14 | SITE NO.73 | 12 MTR RD | 10 MTR RD | PVT PROPERTY |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 01-08-2015 | 30-09-2015 |
| 2 | Formation Of Road, Footpath | Yes | 01-10-2015 | 31-03-2016 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 01-04-2016 | 31-10-2016 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 01-04-2016 | 31-10-2016 |
| 5 | Power Supply Work(Tansformer And Substation) | Yes | 01-03-2017 | 31-03-2018 |
| 6 | Construction Of Storm Water Drainage | Yes | 01-04-2016 | 31-10-2016 |
| 7 | Solid Waste Management and Disposal | Yes | 01-04-2016 | 31-10-2016 |
| 8 | Tree Plantation And LandScape Work | Yes | 01-01-2018 | 28-02-2018 |
| 9 | Street Lighting | Yes | 01-03-2017 | 31-03-2018 |
| 10 | Other Miscellaneous Work | Yes | 01-03-2017 | 31-03-2018 |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Power Backup | Yes |
| 12 | Gas | No |
| 13 | Water and Sanitation | No |
| 14 | Air conditioning and incarnation | No |
| WebSite Link 1 | www.aprameya.co.in |
| Agent Registration No 1 | No Agent |
| Total number of Plots | 74 |
| No. of Public and Semi Pubic Sites | 1 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 1024 |
| No. of Parks and Open Spaces | 2 |
| Area of Parks and Open Spaces(in Sq.m) | 2045 |
| Area of Road/Transportation(in Sq.m) | 6825 |
| Name | Registered conveyance deed for an individual unit |
| Approval Date | 23-09-2017 |
| Appeals / FNH | NO APPEALS / FNH |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |