EARTHEN HUES AND ESTATES PRIVATE LIMITED
Bengaluru North
Approved
25th Jan 2023
Completed
31st Dec 2024
Registration No.
PRM/KA/RERA/1251/309/PR/250123/005668
Acknowledgement No.
ACK/KA/RERA/1251/309/PR/191222/006626
Project Type
Plotted Development
District
Bengaluru Urban
Taluka
Bengaluru North
State
Karnataka
| Number of Survey No./CMC No./CTS No./PID No. | 1 |
| Is there any Litigations on Land/Property/Khatha? | NO |
| Type of Firm | Company |
| Promoter Name | EARTHEN HUES AND ESTATES PRIVATE LIMITED |
| Main Objectives | Real Estate and Related Activities |
| Registration Number | U70100KA2015PTC083478 |
| PAN | ACWPR2682R |
| GSTIN | 29AAECE1305P1ZH |
| Promoter Website | www.earthenhues.net |
| Promoter Address | No. 359/95, 7th Cross,1st Block Jayanagara ,Bengaluru South ,Bengaluru Urban-560011 |
| District | Bengaluru Urban |
| Taluk | Bengaluru South |
| PIN Code | 560011 |
| Name of Authorized Signatory | Ramakrishna Dutt P R |
| Name of CEO/MD | Ramakrishna Dutt P R |
| Designation | Managing Director |
| Director Identification (DIN) Number | 02009210 |
| Number of Directors | 2 |
| Is there any RERA Registrations in other State / UT ? | NO |
| Is there any Projects Launched In The Past 5 Years in Karnataka ? | YES |
| Project Name | BIRD OF PARADISE |
| Project Description | Plotted Development project with spread across 9 acres 38 Guntas with BIAAPA approval. |
| Type of Project | Plotted Development |
| Current Status | Completed |
| Is there any case pending ? | NO |
| Is Payment Pertaining to Project Land Pending ? | NO |
| Project Address | Bird of Paradise , Sy. No. 232, 234, 235/1, Tharahunuse Village, Jala Hbli, Yelahanka Thaluk |
| State/UT | Karnataka |
| Pin Code | 562157 |
| Present Address | No. 2, Govindappa Garden, 5th Cross End, 1st Block Jayanagara , Bengaluru Urban , Karnataka - 560011 |
| Permanent Address | No. 2, Govindappa Garden, 5th Cross End, 1st Block Jayanagara , Bengaluru Urban , Karnataka - 560011 |
| Official Address | No. 359/95, 7th Cross, 1st Block Jayanagara , Bengaluru Urban , Karnataka - 560011 |
| Sl No. | |
| Sl No._1 | |
| Sl No._2 | |
| Sl No._3 |
| Type of Inventory | ODD SITES |
| No of Inventory | 23 |
| Carpet Area (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 192 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 193 | 12M Wide Road | Sy No. 234 | 9M wide Road |
| 2 | 193 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 194 | Site No. 192 | Sy No. 234 | 9M wide Road |
| 3 | 194 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 195 | Site No. 193 | Sy No. 234 | 9M wide Road |
| 4 | 195 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 196 | Site No. 194 | Sy No. 234 | 9M wide Road |
| 5 | 196 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 197 | Site No. 195 | Sy No. 234 | 9M wide Road |
| 6 | 197 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 198 | Site No. 196 | Sy No. 236 | 9M wide Road |
| 7 | 198 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 199 | Site No. 197 | Sy No. 236 | 9M wide Road |
| 8 | 199 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 200 | Site No. 198 | Sy No. 236 | 9M wide Road |
| 9 | 200 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 201 | Site No. 199 | Sy No. 236 | 9M wide Road |
| 10 | 201 | Odd | 12.19mX11.88m | 144.8 | Phase 2 | Under Development | 11.88 | 11.88 | 12.19 | 12.19 | 9M wide Road | Site No. 200 | Sy No. 236 | 9M wide Road |
| 11 | 202 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 203 | 9M Wide Road | Sy No. 236 | 9M wide Road |
| 12 | 203 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 204 | Site No. 202 | Sy No. 236 | 9M wide Road |
| 13 | 204 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 205 | Site No. 203 | Sy No. 236 | 9M wide Road |
| 14 | 205 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 206 | Site No. 204 | Sy No. 236 | 9M wide Road |
| 15 | 206 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 207 | Site No. 205 | Sy No. 236 | 9M wide Road |
| 16 | 207 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 208 | Site No. 206 | Sy No. 236 | 9M wide Road |
| 17 | 208 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 209 | Site No. 207 | Sy No. 236 | 9M wide Road |
| 18 | 209 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 210 | Site No. 208 | Sy No. 236 | 9M wide Road |
| 19 | 210 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 211 | Site No. 209 | Sy No. 236 | 9M wide Road |
| 20 | 211 | Odd | 12.19m*8.11m | 98.91 | Phase 2 | Under Development | 8.11 | 8.11 | 12.19 | 12.19 | Sy No. 238 | Site No. 210 | Sy No. 236 | 9M wide Road |
| 21 | 212 | Odd | 12.19m*8.11m | 98.91 | Phase 2 | Under Development | 8.11 | 8.11 | 12.19 | 12.19 | Sy No. 238 | Site No. 213 | 9M Wide Road | Site No. 251 |
| 22 | 213 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 212 | Site No. 214 | 9M Wide Road | Site No. 250 |
| 23 | 214 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 213 | Site No. 215 | 9M Wide Road | Site No. 249 |
| 24 | 215 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 214 | Site No. 216 | 9M Wide Road | Site No. 248 |
| 25 | 216 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 215 | Site No. 217 | 9M Wide Road | Site No. 247 |
| 26 | 217 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 216 | Site No. 218 | 9M Wide Road | Site No. 246 |
| 27 | 218 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 217 | Site No. 219 | 9M Wide Road | Site No. 245 |
| 28 | 219 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 218 | Site No. 220 | 9M Wide Road | Site No. 244 |
| 29 | 220 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 219 | Site No. 221 | 9M Wide Road | Site No. 243 |
| 30 | 221 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 220 | 9M Wide Road | 9M Wide Road | Site No. 242 |
| 31 | 222 | Odd | 12.19mX11.88m | 144.8 | Phase 2 | Under Development | 11.88 | 11.88 | 12.19 | 12.19 | 9M wide Road | Site No. 223 | 9M Wide Road | Site No. 241 |
| 32 | 223 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 222 | Site No. 224 | 9M Wide Road | Site No. 240 |
| 33 | 224 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 223 | Site No. 225 | 9M Wide Road | Site No. 239 |
| 34 | 225 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 224 | Site No. 226 | 9M Wide Road | Site No. 238 |
| 35 | 226 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 225 | Site No. 227 | 9M Wide Road | Site No. 237 |
| 36 | 227 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 226 | Site No. 228 | 9M Wide Road | Site No. 236 |
| 37 | 228 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 227 | Site No. 229 | 9M Wide Road | Site No. 235 |
| 38 | 229 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 228 | Site No. 230 | 9M Wide Road | Site No. 234 |
| 39 | 230 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 229 | Site No. 231 | 9M Wide Road | Site No. 233 |
| 40 | 231 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 230 | 12M Wide Road | 9M Wide Road | Site No. 232 |
| 41 | 232 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 233 | 12M Wide Road | Site No. 231 | 9M wide Road |
| 42 | 233 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 234 | Site No. 232 | Site No. 230 | 9M wide Road |
| 43 | 234 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 235 | Site No. 233 | Site No. 229 | 9M wide Road |
| 44 | 235 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 236 | Site No. 234 | Site No. 228 | 9M wide Road |
| 45 | 236 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 237 | Site No. 235 | Site No. 227 | 9M wide Road |
| 46 | 237 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 238 | Site No. 236 | Site No. 226 | 9M wide Road |
| 47 | 238 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 239 | Site No. 237 | Site No. 225 | 9M wide Road |
| 48 | 239 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 240 | Site No. 238 | Site No. 224 | 9M wide Road |
| 49 | 240 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 241 | Site No. 239 | Site No. 223 | 9M wide Road |
| 50 | 241 | Odd | 12.19mX11.88m | 144.8 | Phase 2 | Under Development | 11.88 | 11.88 | 12.19 | 12.19 | 9M wide Road | Site No. 240 | Site No. 222 | 9M wide Road |
| 51 | 242 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 243 | 9M Wide Road | Site No. 221 | 9M wide Road |
| 52 | 243 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 244 | Site No. 242 | Site No. 220 | 9M wide Road |
| 53 | 244 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 245 | Site No. 243 | Site No. 219 | 9M wide Road |
| 54 | 245 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 246 | Site No. 244 | Site No. 218 | 9M wide Road |
| 55 | 246 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 247 | Site No. 245 | Site No. 217 | 9M wide Road |
| 56 | 247 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 248 | Site No. 246 | Site No. 216 | 9M wide Road |
| 57 | 248 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 249 | Site No. 247 | Site No. 215 | 9M wide Road |
| 58 | 249 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 250 | Site No. 248 | Site No. 214 | 9M wide Road |
| 59 | 250 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 251 | Site No. 249 | Site No. 213 | 9M wide Road |
| 60 | 251 | Odd | 12.19mX8.11m | 98.91 | Phase 2 | Under Development | 8.11 | 8.11 | 12.19 | 12.19 | Sy No. 238 | Site No. 250 | Site No. 212 | 9M wide Road |
| 61 | 252 | Odd | 11.38mX9.935m | 112.69 | Phase 2 | Under Development | 9.97 | 9.9 | 10.81 | 11.95 | Sy No. 238 | Site No. 253 | 9M Wide Road | Sy No. 148 |
| 62 | 253 | Odd | 12.47mX8.93 | 110.92 | Phase 2 | Under Development | 8.96 | 8.9 | 11.95 | 12.98 | Site No. 252 | Site No. 254 | 9M Wide Road | Sy No. 148 |
| 63 | 254 | Odd | 13.46mX8.33m | 111.68 | Phase 2 | Under Development | 8.36 | 8.3 | 12.98 | 13.93 | Site No. 253 | Site No. 255 | 9M Wide Road | Sy No. 148 |
| 64 | 255 | Odd | 14.38mX7.825m | 112.2 | Phase 2 | Under Development | 7.85 | 7.8 | 13.93 | 14.83 | Site No. 254 | Site No. 256 | 9M Wide Road | Sy No. 148 |
| 65 | 256 | Odd | 15.26mX7.425m | 112.93 | Phase 2 | Under Development | 7.45 | 7.4 | 14.83 | 15.69 | Site No. 255 | Site No. 257 | 9M Wide Road | Sy No. 148 |
| 66 | 257 | Odd | 16.085mX6.925m | 111 | Phase 2 | Under Development | 6.95 | 6.9 | 15.69 | 16.48 | Site No. 256 | Site No. 258 | 9M Wide Road | Sy No. 148 |
| 67 | 258 | Odd | 16.865mX6.67m | 112.17 | Phase 2 | Under Development | 6.69 | 6.65 | 16.48 | 17.25 | Site No. 257 | Site No. 259 | 9M Wide Road | Sy No. 148 |
| 68 | 259 | Odd | 17.615mX6.35m | 111.59 | Phase 2 | Under Development | 6.37 | 6.33 | 17.25 | 17.98 | Site No. 258 | Site No. 260 | 9M Wide Road | Sy No. 148 |
| 69 | 260 | Odd | 18.325mX6.02m | 109.97 | Phase 2 | Under Development | 6.04 | 6 | 17.98 | 18.67 | Site No. 259 | Site No. 261 | 9M Wide Road | Sy No. 148 |
| 70 | 261 | Odd | 19.02mX6.02m | 114.12 | Phase 2 | Under Development | 6.04 | 6 | 18.67 | 19.37 | Site No. 260 | Site No. 262 | 9M Wide Road | Sy No. 148 |
| 71 | 262 | Odd | 19.715mX6.02m | 118.28 | Phase 2 | Under Development | 6.04 | 6 | 19.37 | 20.06 | Site No. 261 | Site No. 263 & Site No. 64 | 9M Wide Road | Sy No. 148 |
| 72 | 263 | Odd | 9.68m10.225m | 98.66 | Phase 2 | Under Development | 10.26 | 10.19 | 9.09 | 10.27 | Site No. 262 | 9M Wide Road | Site No. 264 | Sy No. 148 |
| 73 | 264 | Odd | 10.96mX10.19m | 111.73 | Phase 2 | Under Development | 10.19 | 10.19 | 10.96 | 10.96 | Site No. 262 | 9M Wide Road | 9M Wide Road | Site No. 263 |
| 74 | 265 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | 9M wide Road | Site No. 268 | 9M Wide Road | Site No. 266 |
| 75 | 266 | Odd | 7mX12.19m | 85.33 | Phase 2 | Under Development | 12.19 | 12.19 | 7 | 7 | 9M wide Road | Site No. 269 | Site No. 265 | Site No. 267 |
| 76 | 267 | Odd | 6.835mX12.23m | 83.34 | Phase 2 | Under Development | 12.27 | 12.19 | 6.13 | 7.54 | 9M wide Road | Site No. 270 | Site No. 266 | Sy No. 148 |
| 77 | 268 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 2 | Under Development | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 265 | 9M Wide Road | 9M Wide Road | Site No. 269 |
| 78 | 269 | Odd | 7mX12.19m | 85.33 | Phase 2 | Under Development | 12.19 | 12.19 | 7 | 7 | Site No. 266 | 9M Wide Road | Site No. 268 | Site No. 270 |
| 79 | 270 | Odd | 8.245mX12.23m | 100.48 | Phase 2 | Under Development | 12.27 | 12.19 | 7.54 | 8.95 | Site No. 267 | 9M Wide Road | Site No. 269 | Sy No. 148 |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 19-12-2022 | 21-02-2023 |
| 2 | Formation Of Road, Footpath | Yes | 15-01-2023 | 31-03-2023 |
| 3 | Construction Of Water Supply Infrastucture | Yes | 20-01-2023 | 25-04-2023 |
| 4 | Construction Of Sewage System Infrastucture | No | ||
| 5 | Power Supply Work(Transformer & Substation) | Yes | 16-12-2023 | 05-03-2024 |
| 6 | Construction Of Storm Water Drainage | No | ||
| 7 | Solid Waste Management and Disposal | No | ||
| 8 | Tree Plantation And LandScape Work | Yes | 23-06-2023 | 05-10-2024 |
| 9 | Street Lighting | Yes | 01-01-2024 | 20-08-2024 |
| 10 | Sewage Treatment Plant (STP) | No | ||
| 11 | Other Miscellaneous Work | Yes | 01-12-2023 | 13-12-2024 |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Piped Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning | No |
| WebSite Link 1 | www.earthenhues.net |
| Total number of Plots | 79 |
| No. of Public and Semi Pubic Sites | 1 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 816 |
| No. of Parks and Open Spaces | 2 |
| Area of Parks and Open Spaces(in Sq.m) | 1621 |
| Area of Road/Transportation(in Sq.m) | 4977 |
| Project Start Date | 19-12-2022 |
| Project End Date | 31-12-2024 |
| If any extension of time has been granted | NO |
| Cost of land | 130000000 |
| Cost of construction | 59395340 |
| Total cost | 189395340 |
| Total amount collected From buyers | 68392885 |
| Whether any loan has been raised | YES |
| Total amount spent on Project for completion of the project | 179967618 |
| Total No of sites of Project | 79 |
| Total No of sites sold | 77 |
| Total No of sites unsold | 2 |
| Whether there is any changes in inventory details | NO |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |