Assetz Premium Holdings Private Limited
Sy No 17 HOSAHALLI VILLAGE, JALA HOBLI YELAHANKA TALUK, BANGALORE URBAN DISTRICT
Approved
27th Oct 2021
Completed
30th Mar 2024
Registration No.
PRM/KA/RERA/1251/309/PR/211027/004375
Acknowledgement No.
ACK/KA/RERA/1251/309/PR/210824/005174
Project Type
Plotted Development
Approving Authority
BIAPPA - Bangalore Airport Area Planning Authority
District
Bengaluru Urban
Taluka
Bengaluru North
State
Karnataka
| Project Name | Earth & Essence - Plotted Development - Phase 2 |
| Project Description | Plotted Development Project |
| Project Type | Plotted Development |
| Project Status | New Project Launch |
| Project Start Date | 01-10-2021 |
| Proposed Project Completion Date | 30-03-2024 |
| Total Area Of Land (Sq Mtr) | 23067 |
| Total Coverd Area (Sq Mtr) | 10527 |
| Total Open Area (Sq Mtr) | 12540 |
| Estimated Cost of Construction (INR) | 317959965 |
| Cost of Land (INR) | 462496750 |
| Total Project Cost (INR) | 780456715 |
| Project Address | Sy No 17 HOSAHALLI VILLAGE, JALA HOBLI YELAHANKA TALUK, BANGALORE URBAN DISTRICT |
| District | Bengaluru Urban |
| Taluk | Bengaluru North |
| Approving Authority | BIAPPA - Bangalore Airport Area Planning Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Type of Inventory | ODD Site |
| No of Inventory | 1 |
| Carpet Area (Sq Mtr) | 309SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0SqMtr |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Self Development |
| Solid Waste Management And Disposal | Self Development |
| Fire Fighting facility | Self Development |
| Drinking Water Facility | Self Development |
| Emergency Evacuation Services | Self Development |
| Use of Renewable Energy | Self Development |
| Bank Name | HDFC |
| Branch | Richmond Road |
| ifscCode | HDFC0000523 |
| Account No.(70% Account) | 57500000718421 |
| State | Karnataka |
| Name | Rajesh S Shirakol |
| Address | RREN Consultants & Contractors Pvt Ltd 470 Muneesh Legacy 1st floor,13th Cross 3rd Main Indiranagar 2nd stage Bengaluru |
| Pin Code | 560038 |
| Year Of Establishment | 2018 |
| Number of Project Completed | 10 |
| Reg. Of COA No. | CA/2004/33004 |
| Local Authority Licence Number | M-137173-2 |
| Promoter Type | Company |
| Name | Somasundaram Thiruppathi |
| PAN Number | AANCA3473H |
| Address | Assetz House No 30 .Crescent Road |
| District | Bengaluru Urban |
| State/UT | Karnataka |
| PIN Code | 560001 |
| Company Registration No. | U45205KA2015PTC079422 |
| Type | Director |
| Pin Code | 560001 |
| Sl No. |
| Type of Inventory | ODD Site |
| No of Inventory | 1 |
| Carpet Area (Sq Mtr) | 309 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
| Extension Applied On | 24-02-2023 |
| Extension Approved On | 25-04-2023 |
| Extension Registration Number | EX/PRM/KA/RERA/1251/309/PR/230425/004375 |
| Proposed Project End Date at the time of registration | 31-03-2023 |
| Project End Date provided under Section 6 | 30-03-2024 |
| whether 2/3rd concern from the allottees has taken? | NO |
| Whether any compensation is provided for the Buyer? | YES |
| Document Name | Form B |
| 1 | others |
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | Residential | MID SIZE PLOT | 242.30 | Phase 2 | Infrastructure work in Progress | 19.77 | 18.3 | 9.5 | 16.98 | Road | Site 2 | Site 24 | Road |
| 2 | 2 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 1 | Site 3 | Site 23,24 | Road |
| 3 | 3 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 2 | Site 4 | Site 23 | Road |
| 4 | 4 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 3 | Site 5 | Site 22 | Road |
| 5 | 5 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 4 | Site 6 | Site 21 | Road |
| 6 | 6 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 5 | Site 7 | Site 20 | Road |
| 7 | 7 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 6 | Site 8 | Site 19 | Road |
| 8 | 8 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 7 | Site 9 | Site 18 | Road |
| 9 | 9 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 8 | Site 10 | Site 17 | Road |
| 10 | 10 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 9 | Site 11 | Site 16 | Road |
| 11 | 11 | Residential | 13.63 M X 18.30 M | 249.43 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 13.63 | 13.63 | Site 10 | Site 12 | Site 15 | Road |
| 12 | 12 | Residential | 13.63 M X 18.30 M | 249.43 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 13.63 | 13.63 | Site 11 | Site 13 | Site 14 | Road |
| 13 | 13 | Residential | MID SIZE PLOT | 251.18 | Phase 2 | Infrastructure work in Progress | 18.3 | 20.72 | 11 | 12.64 | Site 12 | Road | Public Utility | Road |
| 14 | 14 | Residential | 13.63 M X 18.30 M | 249.43 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 13.63 | 13.63 | Site 15 | Public Utility | Road | Site 12 |
| 15 | 15 | Residential | 13.63 M X 18.30 M | 249.43 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 13.63 | 13.63 | Site 16 | Site 14 | Road | Site 11 |
| 16 | 16 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 17 | Site 15 | Road | Site 10 |
| 17 | 17 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 18 | Site 16 | Road | Site 9 |
| 18 | 18 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 19 | Site 17 | Road | Site 8 |
| 19 | 19 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 20 | Site 18 | Road | Site 7 |
| 20 | 20 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 21 | Site 19 | Road | Site 6 |
| 21 | 21 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 22 | Site 20 | Road | Site 5 |
| 22 | 22 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 23 | Site 21 | Road | Site 4 |
| 23 | 23 | Residential | 15.24 M X 18.30 M | 278.89 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 15.24 | 15.24 | Site 24 | Site 22 | Road | Site 3, 2 |
| 24 | 24 | Residential | LARGER SIZE PLOT | 273.17 | Phase 2 | Infrastructure work in Progress | 19.77 | 18.3 | 11.19 | 18.66 | Road | Site 23 | Road | Site 2,1 |
| 25 | 25 | Residential | LARGER SIZE PLOT | 289.60 | Phase 2 | Infrastructure work in Progress | 20.06 | 18.3 | 11.75 | 19.85 | Private Property | Site 26 | Site 44 | Road |
| 26 | 26 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 25 | Site 27 | Site 44,43 | Road |
| 27 | 27 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 26 | Site 28 | Site 43 | Road |
| 28 | 28 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 27 | Site 29 | Site 42 | Road |
| 29 | 29 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 28 | Site 30 | Site 41 | Road |
| 30 | 30 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 29 | Site 31 | Site 40 | Road |
| 31 | 31 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 30 | Site 32 | Site 39 | Road |
| 32 | 32 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 31 | Site 33 | Site 38 | Road |
| 33 | 33 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 32 | Site 34 | Site 37 | Road |
| 34 | 34 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 33 | Site 35 | Site 36 | Road |
| 35 | 35 | Residential | LARGER SIZE PLOT | 284.19 | Phase 2 | Infrastructure work in Progress | 18.3 | 20.6 | 13.08 | 14.38 | Site 34 | Road | Site 36, Public Utility | Road |
| 36 | 36 | Residential | 15.24 M X 18.30 M | 278.89 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 15.24 | 15.24 | Site 37 | Public Utility | Road | Site 35, 34 |
| 37 | 37 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 38 | Site 36 | Road | Site 33 |
| 38 | 38 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 39 | Site 37 | Road | Site 32 |
| 39 | 39 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 40 | Site 38 | Road | Site 31 |
| 40 | 40 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 41 | Site 39 | Road | Site 30 |
| 41 | 41 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 42 | Site 40 | Road | Site 29 |
| 42 | 42 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 43 | Site 41 | Road | Site 28 |
| 43 | 43 | Residential | 15.24 M X 18.30 M | 278.89 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 15.24 | 15.24 | Site 44 | Site 42 | Road | Site 26, 27 |
| 44 | 44 | Residential | LARGER SIZE PLOT | 308.60 | Phase 2 | Infrastructure work in Progress | 19.94 | 18.3 | 12.85 | 20.88 | Private Property | Site 43 | Road | Site 25, 26 |
| 45 | 45 | Residential | LARGER SIZE PLOT | 294.55 | Phase 2 | Infrastructure work in Progress | 20.07 | 18.3 | 12.06 | 20.16 | Private Property | Site 46 | Kharab, private property | Road |
| 46 | 46 | Residential | 15.24 M X 18.30 M | 278.89 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 15.24 | 15.24 | Site 45 | Site 47 | Kharab, private property | Road |
| 47 | 47 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 46 | Site 48 | Kharab, private property | Road |
| 48 | 48 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 47 | Site 49 | Kharab, private property | Road |
| 49 | 49 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 48 | Site 50 | Kharab, private property | Road |
| 50 | 50 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 49 | Site 51 | Kharab, private property | Road |
| 51 | 51 | Residential | 12.20M X 18.30M | 223.26 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 12.2 | 12.2 | Site 50 | Site 52 | Kharab, private property | Road |
| 52 | 52 | Residential | 15.24 M X 18.30 M | 278.89 | Phase 2 | Infrastructure work in Progress | 18.3 | 18.3 | 15.24 | 15.24 | Site 51 | Public Utility | Kharab, private property | Road |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 01-01-2022 | 15-02-2022 |
| 2 | Formation Of Road, Footpath | Yes | 01-02-2022 | 31-12-2022 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 15-03-2022 | 31-07-2022 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 14-04-2022 | 31-08-2022 |
| 5 | Power Supply Work(Tansformer And Substation) | Yes | 01-10-2022 | 31-01-2023 |
| 6 | Construction Of Storm Water Drainage | Yes | 29-04-2022 | 30-09-2022 |
| 7 | Solid Waste Management and Disposal | Yes | 01-11-2022 | 30-01-2023 |
| 8 | Tree Plantation And LandScape Work | Yes | 01-01-2023 | 31-03-2023 |
| 9 | Street Lighting | Yes | 01-02-2023 | 31-03-2023 |
| 10 | Other Miscellaneous Work | No |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | Yes |
| 4 | Club House | Yes |
| 5 | Community Hall | Yes |
| 6 | Outdoor Sports facility | Yes |
| 7 | Indoor sports facility | Yes |
| 8 | Swimming Pools | Yes |
| 9 | Gym | Yes |
| 10 | Parks | Yes |
| 11 | Power Backup | Yes |
| 12 | Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning and incarnation | No |
| WebSite Link 1 | www.assetzproperty.com |
| Agent Registration No 1 | undefined |
| Agent Registration No 2 | PRM/KA/RERA/1251/310/AG/190711/001527 |
| Agent Registration No 3 | PRM/KA/RERA/1251/310/AG/170823/000047 |
| Agent Registration No 4 | PRM/KA/RERA/1251/309/1G/180228/001934 |
| Agent Registration No 5 | PRM/KA/RERA/1251/446/AG/180430/000897 |
| Agent Registration No 6 | PRM/KA/RERA/1251/446/AG/171021/001317 |
| Agent Registration No 7 | PRM/KA/RERA/1251/309/AG/180804/001069 |
| Agent Registration No 8 | PRM/KA/RERA/1251/446/AG/210225/002303 |
| Agent Registration No 9 | PRM/KA/RERA/1251/310/AG/200826/001951 |
| Agent Registration No 10 | PRM/KA/RERA/1251/309/AG/171113/000713 |
| Agent Registration No 11 | PRM/KA/RERA/1251/310/AG/191023/001624 |
| Agent Registration No 12 | PRM/KA/RERA/1251/309/AG/180221/001740 |
| Agent Registration No 13 | ACK/KA/RERA/1251/310/AG/201226/002472 |
| Total number of Plots | 52 |
| No. of Public and Semi Pubic Sites | 1 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 166 |
| No. of Parks and Open Spaces | 2 |
| Area of Parks and Open Spaces(in Sq.m) | 2321 |
| Area of Road/Transportation(in Sq.m) | 6625 |
| Project Start Date | 01-10-2021 |
| Project End Date | 30-03-2024 |
| If any extension of time has been granted | YES |
| Extended From Date | 31-03-2023 |
| Extended End Date | 30-03-2024 |
| Cost of land | 462496750 |
| Cost of construction | 317959965 |
| Total cost | 780456715 |
| Total amount collected From buyers | 538345817 |
| Whether any loan has been raised | YES |
| Total amount spent on Project for completion of the project | 776825957 |
| Total No of sites of Project | 52 |
| Total No of sites sold | 42 |
| Total No of sites unsold | 10 |
| Whether there is any changes in inventory details | NO |
| Appeals / FNH | NO APPEALS / FNH |