KNS AADRIKA
KNS Infrastructure Private Limited
Dodderi Village, Tavarekere Hobli, Bengaluru South Taluk,
Approved
2nd Jul 2020
Completed
16th Jan 2025
Registration No.
PRM/KA/RERA/1251/310/PR/200702/003479
Acknowledgement No.
ACK/KA/RERA/1251/310/PR/200608/004044
Project Type
Plotted Development
Approving Authority
Local Planing Authority
District
Bengaluru Urban
Taluka
Bengaluru South
State
Karnataka
Project Details
| Project Name | KNS AADRIKA |
| Project Description | KNS AADRIKA is a plotted development project in Sy.No.28/1, measuring 04 Acres and 14 Guntas, with approval from BMICAPA approval No.BMICAPA/RL-01/04/2019-20, dated:16.01.2020. |
| Project Type | Plotted Development |
| Project Status | Completed |
| Project Start Date | 16-01-2020 |
| Proposed Project Completion Date | 16-01-2025 |
| Total Area Of Land (Sq Mtr) | 17604 |
| Total Coverd Area (Sq Mtr) | 9436 |
| Total Open Area (Sq Mtr) | 8168 |
| Estimated Cost of Construction (INR) | 25580466 |
| Cost of Land (INR) | 43065000 |
| Total Project Cost (INR) | 75530320 |
| Project Address | Dodderi Village, Tavarekere Hobli, Bengaluru South Taluk, |
| District | Bengaluru Urban |
| Taluk | Bengaluru South |
| Approving Authority | Local Planing Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Self Development |
| Solid Waste Management And Disposal | Self Development |
| Fire Fighting facility | Self Development |
| Drinking Water Facility | Self Development |
| Emergency Evacuation Services | Self Development |
| Use of Renewable Energy | Self Development |
| Bank Name | Axis Bank |
| Branch | Chandra Layout |
| ifscCode | UTIB0003189 |
| Account No.(70% Account) | 920020033242472 |
| State | Karnataka |
Promoter Details
| Promoter Type | Company |
| Name | K N BOREGOWDA |
| PAN Number | AAD******* |
| Address | # 1013/A, 4th Cross, 11th Main, , Hampinagar, Vijayanagar 2nd stage |
| District | Bengaluru Urban |
| State/UT | Karnataka |
| PIN Code | 560104 |
| Company Registration No. | U45201KA2007PTC044230 |
Residential Plot Details
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | odd | 178.81 | 178.81 | PHASE-1 | 1 | 14.67 | 14.67 | 12.19 | 12.19 | Donnenahalli village boundary | Road | Site No 2 | Road |
| 2 | 2 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 9.14 | 9.14 | 12.19 | 12.19 | Donnenahalli village boundary | Road | Site No 3 | Site No1 |
| 3 | 3 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 9.14 | 9.14 | 12.19 | 12.19 | Donnenahalli village boundary | Road | Site No 4 | Site No 2 |
| 4 | 4 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 9.14 | 9.14 | 12.19 | 12.19 | Donnenahalli village boundary | Road | Site No 5 | Site No3 |
| 5 | 5 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 9.14 | 9.14 | 12.19 | 12.19 | Donnenahalli village boundary | Road | Site No 6 | Site No 4 |
| 6 | 6 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 9.14 | 9.14 | 12.19 | 12.19 | Donnenahalli village boundary | Road | Site No 7 | Site No 5 |
| 7 | 7 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 9.14 | 9.14 | 12.19 | 12.19 | Donnenahalli village boundary | Road | 3m Path way | Site No 6 |
| 8 | 8 | odd | 102.86 | 102.86 | PHASE-1 | 1 | 12.75 | 12.83 | 7.59 | 8.59 | Road | Road | Sy No 29 | Site No 9 |
| 9 | 9 | odd | 104.74 | 104.74 | PHASE-1 | 1 | 11.58 | 11.62 | 8.59 | 9.50 | Road | Road | Site No8 | Site No 10 |
| 10 | 10 | odd | 105.79 | 105.79 | PHASE-1 | 1 | 10.67 | 10.70 | 9.50 | 10.33 | Road | Road | Site No 9 | Site No 11 |
| 11 | 11 | odd | 114.70 | 114.70 | PHASE-1 | 1 | 10.67 | 10.70 | 10.33 | 11.71 | Road | Road | Site No 10 | Site No 12 |
| 12 | 12 | odd | 135.55 | 135.55 | PHASE-1 | 1 | 9.47 | 9.32 | 14.13 | 14.34 | Road | Road | Site No 11 | Site No 13 |
| 13 | 13 | odd | 152.84 | 152.84 | PHASE-1 | 1 | 10.67 | 10.67 | 14.34 | 14.31 | Road | Road | Site No 12 | Site No 14 |
| 14 | 14 | odd | 152.71 | 152.71 | PHASE-1 | 1 | 10.67 | 10.68 | 14.31 | 13.96 | Road | Road | Site No 13 | Site No 15 |
| 15 | 15 | odd | 161.76 | 161.76 | PHASE-1 | 1 | 12.54 | 12.72 | 13.96 | 11.84 | Road | Road | Site No 14 | Road |
| 16 | 16 | odd | 158.71 | 158.71 | PHASE-1 | 1 | 12.19 | 12.36 | 14.05 | 11.99 | Site No 17 | Road | Road | Site No 21 |
| 17 | 17 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No18 | Site No16 | Road | Site No 20 |
| 18 | 18 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Donnenahalli village boundary | Site No 17 | Road | Site No 19 |
| 19 | 19 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Donnenahalli village boundary | Site No20 | Site No 18 | Road |
| 20 | 20 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 19 | Site No 21 | Site No 17 | Road |
| 21 | 21 | odd | 133.60 | 133.60 | PHASE-1 | 1 | 12.19 | 12.36 | 11.99 | 9.93 | Site No 20 | Road | Site No 16 | Road |
| 22 | 22 | odd | 199.33 | 199.33 | PHASE-1 | 1 | 15.24 | 17.71 | 8.57 | 17.59 | Site No 23 | Road | Road | Site No 30 &29 |
| 23 | 23 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 24 | Site No 22 | Road | Site No 28 |
| 24 | 24 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 25 | Site No 23 | Road | Site No 27 |
| 25 | 25 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Donnenahalli village boundary | Site No 24 | Road | Site No 26 |
| 26 | 26 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Donnenahalli village boundary | Site No 27 | Site No 25 | Road |
| 27 | 27 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 26 | Site No 28 | Site No 24 | Road |
| 28 | 28 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 27 | Site No 29 | Site No 23 | Road |
| 29 | 29 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 28 | Site No 30 | Site No 22 | Road |
| 30 | 30 | odd | 197.51 | 197.51 | PHASE-1 | 1 | 15.24 | 17.71 | 8.45 | 17.47 | Site No 29 | Road | Site No 22 | Road |
| 31 | 31 | odd | 146.67 | 146.67 | PHASE-1 | 1 | 12.19 | 12.60 | 10.68 | 12.19 | site no 32 | Road | Road | Site No 42 |
| 32 | 32 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 33 | Site No 31 | Road | Site No 41 |
| 33 | 33 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 34 | Site No 32 | Road | Site No 40 |
| 34 | 34 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 35 | Site No 33 | Road | Site No 39 |
| 35 | 35 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 36 | Site No 34 | Road | Site No 38 |
| 36 | 36 | odd | 157.19 | 157.19 | PHASE-1 | 1 | 12.21 | 12.19 | 12.70 | 13.43 | Donnenahalli village boundary | Site No 35 | Road | Site No 37 |
| 37 | 37 | odd | 172.06 | 172.06 | PHASE-1 | 1 | 12.27 | 12.19 | 13.43 | 14.80 | Donnenahalli village boundary | Site No 38 | Site No 36 | Road |
| 38 | 38 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 37 | Site No 39 | Site No 35 | Road |
| 39 | 39 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 38 | Site No 40 | Site No 34 | Road |
| 40 | 40 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 39 | Site No 41 | Site No 33 | Road |
| 41 | 41 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 40 | Site No 42 | Site No 32 | Road |
| 42 | 42 | odd | 148.59 | 148.59 | PHASE-1 | 1 | 12.19 | 12.19 | 12.19 | 12.19 | Site No 41 | Road | Site No 31 | Road |
| 43 | 43 | odd | 130.06 | 130.06 | PHASE-1 | 1 | 12.19 | 12.19 | 10.67 | 10.67 | Site No 44 | Road | Road | Site No 56 |
| 44 | 44 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 45 | Site No 43 | Road | Site No55 |
| 45 | 45 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 46 | Site No 44 | Road | Site No 54 |
| 46 | 46 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 47 | Site No 45 | Road | Site No 53 |
| 47 | 47 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 48 | Site No 46 | Road | Site No 52 |
| 48 | 48 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 49 | Site No 47 | Road | Site No 51 |
| 49 | 49 | odd | 109.58 | 109.58 | PHASE-1 | 1 | 12.27 | 12.19 | 8.31 | 9.67 | Donnenahalli village boundary | Site No 48 | Road | Site No 50 |
| 50 | 50 | odd | 160.32 | 160.32 | PHASE-1 | 1 | 15.34 | 15.24 | 9.67 | 11.37 | Donnenahalli village boundary | Site No 51 | Site No 49 | Road |
| 51 | 51 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 50 | Site No 52 | Site No 48 | Road |
| 52 | 52 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 51 | Site No 53 | Site No 47 | Road |
| 53 | 53 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 52 | Site No 54 | Site No 46 | Road |
| 54 | 54 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 53 | Site No 55 | Site No 45 | Road |
| 55 | 55 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 54 | Site No 56 | Site No 44 | Road |
| 56 | 56 | odd | 162.61 | 162.61 | PHASE-1 | 1 | 15.24 | 15.24 | 10.67 | 10.67 | Site No 55 | Road | Site No 43 | Road |
| 57 | 57 | odd | 230.77 | 230.77 | PHASE-1 | 1 | 13.72 | 13.72 | 16.82 | 16.82 | CA | Road | Road | Site No 58 |
| 58 | 58 | odd | 153.73 | 153.73 | PHASE-1 | 1 | 9.14 | 9.14 | 16.82 | 16.82 | CA | Road | Site No 57 | Site No 59 |
| 59 | 59 | odd | 153.73 | 153.73 | PHASE-1 | 1 | 9.14 | 9.14 | 16.82 | 16.82 | CA | Road | Site No 58 | Site No 60 |
| 60 | 60 | odd | 153.73 | 153.73 | PHASE-1 | 1 | 9.14 | 9.14 | 16.82 | 16.82 | CA | Road | Site No 59 | Site No 61 |
| 61 | 61 | odd | 188.38 | 188.38 | PHASE-1 | 1 | 11.5 | 10.90 | 16.82 | 16.83 | CA | Road | Site No 60 | Sy No 28/2 |
| 62 | 62 | odd | 213.49 | 213.49 | PHASE-1 | 1 | 12 | 11.39 | 17.65 | 18.81 | Road | Sy No 130 | Site no 63 | Sy No 28/2 |
| 63 | 63 | odd | 206.31 | 206.31 | PHASE-1 | 1 | 12.19 | 12.28 | 16.20 | 17.65 | Road | Sy No 130 | Site No 64 | Site No 62 |
| 64 | 64 | odd | 188.70 | 188.70 | PHASE-1 | 1 | 12.19 | 12.28 | 14.76 | 16.20 | Road | Sy No 130 | Site No 65 | Site No 63 |
| 65 | 65 | odd | 168.68 | 168.68 | PHASE-1 | 1 | 12.01 | 12.01 | 13.33 | 14.76 | Road | Sy No 130 | Site No 66 | Site No 64 |
| 66 | 66 | odd | 116.90 | 116.90 | PHASE-1 | 1 | 9.14 | 9.20 | 12.25 | 13.33 | Road | Sy No 130 | Site No 67 | Site No 65 |
| 67 | 67 | odd | 107.02 | 107.02 | PHASE-1 | 1 | 9.14 | 9.20 | 11.17 | 12.25 | Road | Sy No 130 | Site No 68 | Site No 66 |
| 68 | 68 | odd | 112.40 | 112.40 | PHASE-1 | 1 | 10.67 | 10.74 | 9.90 | 11.17 | Road | Sy No 130 | Site No 69 | Site No 67 |
| 69 | 69 | odd | 121.96 | 121.96 | PHASE-1 | 1 | 13.71 | 14.23 | 6.84 | 9.90 | Road | Sy No 130 | Road | Site No 68 |
Project Development Schedule
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 01-10-2020 | 30-10-2020 |
| 2 | Formation Of Road, Footpath | Yes | 20-04-2021 | 10-05-2021 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 01-11-2020 | 15-11-2020 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 15-11-2020 | 30-11-2020 |
| 5 | Power Supply Work(Tansformer And Substation) | Yes | 15-03-2021 | 31-03-2021 |
| 6 | Construction Of Storm Water Drainage | Yes | 20-12-2020 | 31-12-2020 |
| 7 | Solid Waste Management and Disposal | Yes | 01-11-2020 | 15-01-2021 |
| 8 | Tree Plantation And LandScape Work | Yes | 01-03-2021 | 20-03-2021 |
| 9 | Street Lighting | Yes | 10-04-2021 | 20-04-2021 |
| 10 | Other Miscellaneous Work | Yes | 01-10-2020 | 31-03-2021 |
Amenities & Utilities Availability
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning and incarnation | No |
Post Registration Details
| Total number of Plots | 69 |
| No. of Public and Semi Pubic Sites | 1 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 881 |
| No. of Parks and Open Spaces | 2 |
| Area of Parks and Open Spaces(in Sq.m) | 1762 |
| Area of Road/Transportation(in Sq.m) | 5523 |
Completion Details
| Project Start Date | 16-01-2020 |
| Project End Date | 16-01-2025 |
| If any extension of time has been granted | NO |
| Cost of land | 43065000 |
| Cost of construction | 25580466 |
| Total cost | 75530320 |
| Total amount collected From buyers | 18200 |
| Whether any loan has been raised | NO |
| Total amount spent on Project for completion of the project | 75530320 |
| Total No of sites of Project | 69 |
| Total No of sites sold | 0 |
| Total No of sites unsold | 69 |
| Whether there is any changes in inventory details | NO |
Appeals & Complaints
| Appeals / FNH | NO APPEALS / FNH |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in