KNS Infrastructure Private Limited
Dodderi Village, Tavarekere Hobli, Bengaluru South Taluk,
Approved
2nd Jul 2020
Completed
16th Jan 2025
Registration No.
PRM/KA/RERA/1251/310/PR/200702/003479
Acknowledgement No.
ACK/KA/RERA/1251/310/PR/200608/004044
Project Type
Plotted Development
Approving Authority
Local Planing Authority
District
Bengaluru Urban
Taluka
Bengaluru South
State
Karnataka
| Project Name | KNS AADRIKA |
| Project Description | KNS AADRIKA is a plotted development project in Sy.No.28/1, measuring 04 Acres and 14 Guntas, with approval from BMICAPA approval No.BMICAPA/RL-01/04/2019-20, dated:16.01.2020. |
| Project Type | Plotted Development |
| Project Status | Completed |
| Project Start Date | 16-01-2020 |
| Proposed Project Completion Date | 16-01-2025 |
| Total Area Of Land (Sq Mtr) | 17604 |
| Total Coverd Area (Sq Mtr) | 9436 |
| Total Open Area (Sq Mtr) | 8168 |
| Estimated Cost of Construction (INR) | 25580466 |
| Cost of Land (INR) | 43065000 |
| Total Project Cost (INR) | 75530320 |
| Project Address | Dodderi Village, Tavarekere Hobli, Bengaluru South Taluk, |
| District | Bengaluru Urban |
| Taluk | Bengaluru South |
| Approving Authority | Local Planing Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Self Development |
| Solid Waste Management And Disposal | Self Development |
| Fire Fighting facility | Self Development |
| Drinking Water Facility | Self Development |
| Emergency Evacuation Services | Self Development |
| Use of Renewable Energy | Self Development |
| Bank Name | Axis Bank |
| Branch | Chandra Layout |
| ifscCode | UTIB0003189 |
| Account No.(70% Account) | 920020033242472 |
| State | Karnataka |
| Promoter Type | Company |
| Name | K N BOREGOWDA |
| PAN Number | AADCK2086J |
| Address | # 1013/A, 4th Cross, 11th Main, , Hampinagar, Vijayanagar 2nd stage |
| District | Bengaluru Urban |
| State/UT | Karnataka |
| PIN Code | 560104 |
| Company Registration No. | U45201KA2007PTC044230 |
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | odd | 178.81 | 178.81 | PHASE-1 | 1 | 14.67 | 14.67 | 12.19 | 12.19 | Donnenahalli village boundary | Road | Site No 2 | Road |
| 2 | 2 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 9.14 | 9.14 | 12.19 | 12.19 | Donnenahalli village boundary | Road | Site No 3 | Site No1 |
| 3 | 3 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 9.14 | 9.14 | 12.19 | 12.19 | Donnenahalli village boundary | Road | Site No 4 | Site No 2 |
| 4 | 4 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 9.14 | 9.14 | 12.19 | 12.19 | Donnenahalli village boundary | Road | Site No 5 | Site No3 |
| 5 | 5 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 9.14 | 9.14 | 12.19 | 12.19 | Donnenahalli village boundary | Road | Site No 6 | Site No 4 |
| 6 | 6 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 9.14 | 9.14 | 12.19 | 12.19 | Donnenahalli village boundary | Road | Site No 7 | Site No 5 |
| 7 | 7 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 9.14 | 9.14 | 12.19 | 12.19 | Donnenahalli village boundary | Road | 3m Path way | Site No 6 |
| 8 | 8 | odd | 102.86 | 102.86 | PHASE-1 | 1 | 12.75 | 12.83 | 7.59 | 8.59 | Road | Road | Sy No 29 | Site No 9 |
| 9 | 9 | odd | 104.74 | 104.74 | PHASE-1 | 1 | 11.58 | 11.62 | 8.59 | 9.50 | Road | Road | Site No8 | Site No 10 |
| 10 | 10 | odd | 105.79 | 105.79 | PHASE-1 | 1 | 10.67 | 10.70 | 9.50 | 10.33 | Road | Road | Site No 9 | Site No 11 |
| 11 | 11 | odd | 114.70 | 114.70 | PHASE-1 | 1 | 10.67 | 10.70 | 10.33 | 11.71 | Road | Road | Site No 10 | Site No 12 |
| 12 | 12 | odd | 135.55 | 135.55 | PHASE-1 | 1 | 9.47 | 9.32 | 14.13 | 14.34 | Road | Road | Site No 11 | Site No 13 |
| 13 | 13 | odd | 152.84 | 152.84 | PHASE-1 | 1 | 10.67 | 10.67 | 14.34 | 14.31 | Road | Road | Site No 12 | Site No 14 |
| 14 | 14 | odd | 152.71 | 152.71 | PHASE-1 | 1 | 10.67 | 10.68 | 14.31 | 13.96 | Road | Road | Site No 13 | Site No 15 |
| 15 | 15 | odd | 161.76 | 161.76 | PHASE-1 | 1 | 12.54 | 12.72 | 13.96 | 11.84 | Road | Road | Site No 14 | Road |
| 16 | 16 | odd | 158.71 | 158.71 | PHASE-1 | 1 | 12.19 | 12.36 | 14.05 | 11.99 | Site No 17 | Road | Road | Site No 21 |
| 17 | 17 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No18 | Site No16 | Road | Site No 20 |
| 18 | 18 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Donnenahalli village boundary | Site No 17 | Road | Site No 19 |
| 19 | 19 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Donnenahalli village boundary | Site No20 | Site No 18 | Road |
| 20 | 20 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 19 | Site No 21 | Site No 17 | Road |
| 21 | 21 | odd | 133.60 | 133.60 | PHASE-1 | 1 | 12.19 | 12.36 | 11.99 | 9.93 | Site No 20 | Road | Site No 16 | Road |
| 22 | 22 | odd | 199.33 | 199.33 | PHASE-1 | 1 | 15.24 | 17.71 | 8.57 | 17.59 | Site No 23 | Road | Road | Site No 30 &29 |
| 23 | 23 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 24 | Site No 22 | Road | Site No 28 |
| 24 | 24 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 25 | Site No 23 | Road | Site No 27 |
| 25 | 25 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Donnenahalli village boundary | Site No 24 | Road | Site No 26 |
| 26 | 26 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Donnenahalli village boundary | Site No 27 | Site No 25 | Road |
| 27 | 27 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 26 | Site No 28 | Site No 24 | Road |
| 28 | 28 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 27 | Site No 29 | Site No 23 | Road |
| 29 | 29 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 28 | Site No 30 | Site No 22 | Road |
| 30 | 30 | odd | 197.51 | 197.51 | PHASE-1 | 1 | 15.24 | 17.71 | 8.45 | 17.47 | Site No 29 | Road | Site No 22 | Road |
| 31 | 31 | odd | 146.67 | 146.67 | PHASE-1 | 1 | 12.19 | 12.60 | 10.68 | 12.19 | site no 32 | Road | Road | Site No 42 |
| 32 | 32 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 33 | Site No 31 | Road | Site No 41 |
| 33 | 33 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 34 | Site No 32 | Road | Site No 40 |
| 34 | 34 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 35 | Site No 33 | Road | Site No 39 |
| 35 | 35 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 36 | Site No 34 | Road | Site No 38 |
| 36 | 36 | odd | 157.19 | 157.19 | PHASE-1 | 1 | 12.21 | 12.19 | 12.70 | 13.43 | Donnenahalli village boundary | Site No 35 | Road | Site No 37 |
| 37 | 37 | odd | 172.06 | 172.06 | PHASE-1 | 1 | 12.27 | 12.19 | 13.43 | 14.80 | Donnenahalli village boundary | Site No 38 | Site No 36 | Road |
| 38 | 38 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 37 | Site No 39 | Site No 35 | Road |
| 39 | 39 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 38 | Site No 40 | Site No 34 | Road |
| 40 | 40 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 39 | Site No 41 | Site No 33 | Road |
| 41 | 41 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 40 | Site No 42 | Site No 32 | Road |
| 42 | 42 | odd | 148.59 | 148.59 | PHASE-1 | 1 | 12.19 | 12.19 | 12.19 | 12.19 | Site No 41 | Road | Site No 31 | Road |
| 43 | 43 | odd | 130.06 | 130.06 | PHASE-1 | 1 | 12.19 | 12.19 | 10.67 | 10.67 | Site No 44 | Road | Road | Site No 56 |
| 44 | 44 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 45 | Site No 43 | Road | Site No55 |
| 45 | 45 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 46 | Site No 44 | Road | Site No 54 |
| 46 | 46 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 47 | Site No 45 | Road | Site No 53 |
| 47 | 47 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 48 | Site No 46 | Road | Site No 52 |
| 48 | 48 | 30X40 | 111.42 | 111.42 | PHASE-1 | 1 | 12.19 | 12.19 | 9.14 | 9.14 | Site No 49 | Site No 47 | Road | Site No 51 |
| 49 | 49 | odd | 109.58 | 109.58 | PHASE-1 | 1 | 12.27 | 12.19 | 8.31 | 9.67 | Donnenahalli village boundary | Site No 48 | Road | Site No 50 |
| 50 | 50 | odd | 160.32 | 160.32 | PHASE-1 | 1 | 15.34 | 15.24 | 9.67 | 11.37 | Donnenahalli village boundary | Site No 51 | Site No 49 | Road |
| 51 | 51 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 50 | Site No 52 | Site No 48 | Road |
| 52 | 52 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 51 | Site No 53 | Site No 47 | Road |
| 53 | 53 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 52 | Site No 54 | Site No 46 | Road |
| 54 | 54 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 53 | Site No 55 | Site No 45 | Road |
| 55 | 55 | 30X50 | 139.29 | 139.29 | PHASE-1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No 54 | Site No 56 | Site No 44 | Road |
| 56 | 56 | odd | 162.61 | 162.61 | PHASE-1 | 1 | 15.24 | 15.24 | 10.67 | 10.67 | Site No 55 | Road | Site No 43 | Road |
| 57 | 57 | odd | 230.77 | 230.77 | PHASE-1 | 1 | 13.72 | 13.72 | 16.82 | 16.82 | CA | Road | Road | Site No 58 |
| 58 | 58 | odd | 153.73 | 153.73 | PHASE-1 | 1 | 9.14 | 9.14 | 16.82 | 16.82 | CA | Road | Site No 57 | Site No 59 |
| 59 | 59 | odd | 153.73 | 153.73 | PHASE-1 | 1 | 9.14 | 9.14 | 16.82 | 16.82 | CA | Road | Site No 58 | Site No 60 |
| 60 | 60 | odd | 153.73 | 153.73 | PHASE-1 | 1 | 9.14 | 9.14 | 16.82 | 16.82 | CA | Road | Site No 59 | Site No 61 |
| 61 | 61 | odd | 188.38 | 188.38 | PHASE-1 | 1 | 11.5 | 10.90 | 16.82 | 16.83 | CA | Road | Site No 60 | Sy No 28/2 |
| 62 | 62 | odd | 213.49 | 213.49 | PHASE-1 | 1 | 12 | 11.39 | 17.65 | 18.81 | Road | Sy No 130 | Site no 63 | Sy No 28/2 |
| 63 | 63 | odd | 206.31 | 206.31 | PHASE-1 | 1 | 12.19 | 12.28 | 16.20 | 17.65 | Road | Sy No 130 | Site No 64 | Site No 62 |
| 64 | 64 | odd | 188.70 | 188.70 | PHASE-1 | 1 | 12.19 | 12.28 | 14.76 | 16.20 | Road | Sy No 130 | Site No 65 | Site No 63 |
| 65 | 65 | odd | 168.68 | 168.68 | PHASE-1 | 1 | 12.01 | 12.01 | 13.33 | 14.76 | Road | Sy No 130 | Site No 66 | Site No 64 |
| 66 | 66 | odd | 116.90 | 116.90 | PHASE-1 | 1 | 9.14 | 9.20 | 12.25 | 13.33 | Road | Sy No 130 | Site No 67 | Site No 65 |
| 67 | 67 | odd | 107.02 | 107.02 | PHASE-1 | 1 | 9.14 | 9.20 | 11.17 | 12.25 | Road | Sy No 130 | Site No 68 | Site No 66 |
| 68 | 68 | odd | 112.40 | 112.40 | PHASE-1 | 1 | 10.67 | 10.74 | 9.90 | 11.17 | Road | Sy No 130 | Site No 69 | Site No 67 |
| 69 | 69 | odd | 121.96 | 121.96 | PHASE-1 | 1 | 13.71 | 14.23 | 6.84 | 9.90 | Road | Sy No 130 | Road | Site No 68 |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 01-10-2020 | 30-10-2020 |
| 2 | Formation Of Road, Footpath | Yes | 20-04-2021 | 10-05-2021 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 01-11-2020 | 15-11-2020 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 15-11-2020 | 30-11-2020 |
| 5 | Power Supply Work(Tansformer And Substation) | Yes | 15-03-2021 | 31-03-2021 |
| 6 | Construction Of Storm Water Drainage | Yes | 20-12-2020 | 31-12-2020 |
| 7 | Solid Waste Management and Disposal | Yes | 01-11-2020 | 15-01-2021 |
| 8 | Tree Plantation And LandScape Work | Yes | 01-03-2021 | 20-03-2021 |
| 9 | Street Lighting | Yes | 10-04-2021 | 20-04-2021 |
| 10 | Other Miscellaneous Work | Yes | 01-10-2020 | 31-03-2021 |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning and incarnation | No |
| Total number of Plots | 69 |
| No. of Public and Semi Pubic Sites | 1 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 881 |
| No. of Parks and Open Spaces | 2 |
| Area of Parks and Open Spaces(in Sq.m) | 1762 |
| Area of Road/Transportation(in Sq.m) | 5523 |
| Project Start Date | 16-01-2020 |
| Project End Date | 16-01-2025 |
| If any extension of time has been granted | NO |
| Cost of land | 43065000 |
| Cost of construction | 25580466 |
| Total cost | 75530320 |
| Total amount collected From buyers | 18200 |
| Whether any loan has been raised | NO |
| Total amount spent on Project for completion of the project | 75530320 |
| Total No of sites of Project | 69 |
| Total No of sites sold | 0 |
| Total No of sites unsold | 69 |
| Whether there is any changes in inventory details | NO |
| Appeals / FNH | NO APPEALS / FNH |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |


Ask Pulse Ai anything about real estate