SAMMYS DREAM LAND CO PRIVATE LIMITED
Sy No:145/3 146/1 & 147 of Hosahalli Village, Jala Hobli, Bengaluru North Taluk, Bangaluru Urban District
Approved
11th Jan 2021
Completed
31st Dec 2023
Registration No.
PRM/KA/RERA/1251/309/PR/210111/003782
Acknowledgement No.
ACK/KA/RERA/1251/309/PR/201219/004454
Project Type
Plotted Development
Approving Authority
BIAPPA - Bangalore Airport Area Planning Authority
District
Bengaluru Urban
Taluka
Bengaluru North
State
Karnataka
| Project Name | Sammy's Beverly Hills Phase-II |
| Project Description | Residential Layout comprises of 87 plots of different dimensions |
| Project Type | Plotted Development |
| Project Status | New Project Launch |
| Project Start Date | 01-01-2021 |
| Proposed Project Completion Date | 31-12-2023 |
| Total Area Of Land (Sq Mtr) | 34650 |
| Total Coverd Area (Sq Mtr) | 17863 |
| Total Open Area (Sq Mtr) | 16787 |
| Estimated Cost of Construction (INR) | 52582500 |
| Cost of Land (INR) | 169900000 |
| Total Project Cost (INR) | 222482500 |
| Project Address | Sy No:145/3 146/1 & 147 of Hosahalli Village, Jala Hobli, Bengaluru North Taluk, Bangaluru Urban District |
| District | Bengaluru Urban |
| Taluk | Bengaluru North |
| Approving Authority | BIAPPA - Bangalore Airport Area Planning Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Type of Inventory | 12.19 m x 24.38 m |
| No of Inventory | 18 |
| Carpet Area (Sq Mtr) | 0SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0SqMtr |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Local Authority |
| Solid Waste Management And Disposal | Local Authority |
| Fire Fighting facility | Local Authority |
| Drinking Water Facility | Local Authority |
| Emergency Evacuation Services | Local Authority |
| Use of Renewable Energy | Local Authority |
| Bank Name | IDFC FIRST BANK |
| Branch | Sahakarnagar Branch |
| ifscCode | IDFB0080183 |
| Account No.(70% Account) | 98452885751 |
| State | Karnataka |
| Name | SATEESHA U S |
| Address | 149C, Chennagiri Mansion, 11th C Cross, 1st Main,2nd Stage, West of Chord Road, Mahalakshmipuram |
| Pin Code | 560086 |
| Year Of Establishment | 2018 |
| Number of Project Completed | 5 |
| Reg. Of COA No. | BCC/BL-3.6/A:1779:08-09 |
| Local Authority Licence Number | BCC/BL-3.6/E:4426/2018-19 |
| Promoter Type | Company |
| Name | SURESH GOPAL DAS NANWANI |
| PAN Number | AACCS6592A |
| Address | No.9, 2nd Floor, BEL Air Drive, Mekhri Circle, Bellary road.Bangalore |
| District | Bengaluru Urban |
| State/UT | Karnataka |
| PIN Code | 560032 |
| Company Registration No. | 08 17657 |
| Type | Board Member |
| Pin Code | 560032 |
| Sl No. |
| Type of Inventory | 12.19 m x 24.38 m |
| No of Inventory | 18 |
| Carpet Area (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | Residential | 310.26 | 3339.64 | Phase II | In Progress | 19.79 | 20.1 | 15.56 | 15.56 | Sy No-21 | 12 meter Road | Plot No-02 | Park No-01 |
| 2 | 2 | Residential | 246.43 | 2652.57 | Phase II | In Progress | 20.1 | 20.33 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-03 | Plot No-01 |
| 3 | 3 | Residential | 249.32 | 2683.68 | Phase II | In Progress | 20.33 | 20.57 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-04 | Plot No-02 |
| 4 | 4 | Residential | 252.21 | 2714.79 | Phase II | In Progress | 20.57 | 20.81 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-05 | Plot No-03 |
| 5 | 5 | Residential | 255.11 | 2746 | Phase II | In Progress | 20.81 | 21.05 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-06 | Plot No-04 |
| 6 | 6 | Residential | 258 | 2777.11 | Phase II | In Progress | 21.05 | 21.28 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-07 | Plot No-05 |
| 7 | 7 | Residential | 260.89 | 2808.22 | Phase II | In Progress | 21.28 | 21.52 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-08 | Plot No-06 |
| 8 | 8 | Residential | 263.79 | 2839.44 | Phase II | In Progress | 21.52 | 21.76 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-09 | Plot No-07 |
| 9 | 9 | Residential | 266.68 | 2870.54 | Phase II | In Progress | 21.76 | 22 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-10 | Plot No-08 |
| 10 | 10 | Residential | 269.57 | 2901.65 | Phase II | In Progress | 22 | 22.23 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-11 | Plot No-09 |
| 11 | 11 | Residential | 272.46 | 2932.76 | Phase II | In Progress | 22.23 | 22.47 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-12 | Plot No-10 |
| 12 | 12 | Residential | 275.36 | 2963.98 | Phase II | In Progress | 22.47 | 22.71 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-13 | Plot No-11 |
| 13 | 13 | Residential | 278.25 | 2995.08 | Phase II | In Progress | 22.71 | 22.94 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-14 | Plot No-12 |
| 14 | 14 | Residential | 281.14 | 3026.19 | Phase II | In Progress | 22.94 | 23.18 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-15 | Plot No-13 |
| 15 | 15 | Residential | 284.04 | 3057.41 | Phase II | In Progress | 23.18 | 23.42 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-16 | Plot No-14 |
| 16 | 16 | Residential | 286.93 | 3088.51 | Phase II | In Progress | 23.42 | 23.66 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-17 | Plot No-15 |
| 17 | 17 | Residential | 289.82 | 3119.62 | Phase II | In Progress | 23.66 | 23.89 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Park No-02 | Plot No-16 |
| 18 | 18 | Residential | 275.66 | 2967.2 | Phase II | In Progress | 24.38 | 20.68 | 13.09 | 11.59 | 12 Meter Road | Sy No-146(P) | Park no-03 | Plot no-19 |
| 19 | 19 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-18 | plot no-20 |
| 20 | 20 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-19 | plot no-21 |
| 21 | 21 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-20 | plot no-22 |
| 22 | 22 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-21 | plot no-23 |
| 23 | 23 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-22 | plot no-24 |
| 24 | 24 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-23 | plot no-25 |
| 25 | 25 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-24 | plot no-26 |
| 26 | 26 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-25 | plot no-27 |
| 27 | 27 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-26 | plot no-28 |
| 28 | 28 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-27 | plot no-29 |
| 29 | 29 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-28 | plot no-30 |
| 30 | 30 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-29 | plot no-31 |
| 31 | 31 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-30 | plot no-32 |
| 32 | 32 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-31 | plot no-33 |
| 33 | 33 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-32 | plot no-34 |
| 34 | 34 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-33 | plot no-35 |
| 35 | 35 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-34 | plot no-36 |
| 36 | 36 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-35 | plot no-37 |
| 37 | 37 | Residential | 343.52 | 3697.65 | Phase II | In Progress | 24.42 | 24.38 | 14.82 | 13.36 | 12 Meter Road | Sy No-146(P) | Plot no-36 | Sy No-147 |
| 38 | 38 | Residential | 122.17 | 1315.04 | Phase II | In Progress | 11.8 | 11.57 | 10.63 | 10.3 | Sy No-146(P) | 15 meter Road | Plot no-39 | Sy No-146/1 |
| 39 | 39 | Residential | 139.41 | 1500.61 | Phase II | In Progress | 11.57 | 11.31 | 12.19 | 12.19 | Sy No-146(P) | 15 meter Road | Plot no-40 | Plot no-38 |
| 40 | 40 | Residential | 136.26 | 1466.7 | Phase II | In Progress | 11.31 | 11.05 | 12.19 | 12.19 | Sy No-146(P) | 15 meter Road | Plot no-41 | Plot no-39 |
| 41 | 41 | Residential | 133.11 | 1432.8 | Phase II | In Progress | 11.05 | 10.79 | 12.19 | 12.19 | Sy No-146(P) | 15 meter Road | Plot no-42 | Plot no-40 |
| 42 | 42 | Residential | 129.97 | 1399 | Phase II | In Progress | 10.79 | 10.53 | 12.19 | 12.19 | Sy No-146(P) | 15 meter Road | Plot no-43 | Plot no-41 |
| 43 | 43 | Residential | 126.82 | 1365.09 | Phase II | In Progress | 10.53 | 10.27 | 12.19 | 12.19 | Sy No-146(P) | 15 meter Road | Plot no-44 | Plot no-42 |
| 44 | 44 | Residential | 123.67 | 1331.18 | Phase II | In Progress | 10.27 | 10.02 | 12.19 | 12.19 | Sy No-146(P) | 15 meter Road | Park No-04 | Plot no-43 |
| 45 | 45 | Commercial | 967.77 | 10417.08 | Phase II | In Progress | 29.6 | 29.95 | 32.7 | 31.89 | Plot No-46 and 47 | Sy No-145/2 | CA-02 | Sy No-146/1 |
| 46 | 46 | Residential | 398.8 | 4292.68 | Phase II | In Progress | 18.3 | 18.29 | 22.06 | 21.55 | 15 meter Road | Commercial plot no-45 | Plot No-47 | Sy No-146/1 |
| 47 | 47 | Residential | 222.96 | 2399.94 | Phase II | In Progress | 18.29 | 18.29 | 12.19 | 12.19 | 15 meter Road | Commercial plot no-45 | Plot No-48 | Plot no-46 |
| 48 | 48 | Residential | 222.96 | 2399.94 | Phase II | In Progress | 18.29 | 18.29 | 12.19 | 12.19 | 15 meter Road | CA-02 | Plot No-49 | Plot no-47 |
| 49 | 49 | Residential | 222.96 | 2399.94 | Phase II | In Progress | 18.29 | 18.29 | 12.19 | 12.19 | 15 meter Road | CA-02 | Plot No-50 | Plot no-48 |
| 50 | 50 | Residential | 222.96 | 2399.94 | Phase II | In Progress | 18.29 | 18.29 | 12.19 | 12.19 | 15 meter Road | CA-02 | Plot No-51 | Plot no-49 |
| 51 | 51 | Residential | 222.96 | 2399.94 | Phase II | In Progress | 18.29 | 18.29 | 12.19 | 12.19 | 15 meter Road | CA-02 | 12 Meter road | Plot no-50 |
| 52 | 52 | Residential | 217.9 | 2345.48 | Phase II | In Progress | 15.24 | 15.24 | 14.3 | 14.3 | 15 meter Road | Plot No-74 and 73 | Plot no-53 | 12 Meter road |
| 53 | 53 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-73 and 72 | Plot no-54 | Plot no-52 |
| 54 | 54 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-72 and 71 | Plot no-55 | Plot no-53 |
| 55 | 55 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-70 and 69 | Plot no-56 | Plot no-54 |
| 56 | 56 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-69 and 68 | Plot no-57 | Plot no-55 |
| 57 | 57 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-68 and 67 | Plot no-58 | Plot no-56 |
| 58 | 58 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-66 and65 | Plot no-59 | Plot no-57 |
| 59 | 59 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-65 and 64 | Plot no-60 | Plot no-58 |
| 60 | 60 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-64 and 63 | Plot no-61 | Plot no-59 |
| 61 | 61 | Residential | 196.86 | 2119 | Phase II | In Progress | 15.24 | 15.25 | 13.24 | 12.19 | 15 meter Road | Plot No-62 | 09 Meter road | Plot no-60 |
| 62 | 62 | Residential | 150.14 | 1616.11 | Phase II | In Progress | 12 | 12.01 | 12.77 | 12.25 | Plot No-61 | 09 Meter road | 09 Meter road | Plot no-63 |
| 63 | 63 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-60 | 09 Meter road | Plot no-62 | Plot no-64 |
| 64 | 64 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-60 and 59 | 09 Meter road | Plot no-63 | Plot no-65 |
| 65 | 65 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-58 and 59 | 09 Meter road | Plot no-64 | Plot no-66 |
| 66 | 66 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-58 | 09 Meter road | Plot no-65 | Plot no-67 |
| 67 | 67 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-57 and 58 | 09 Meter road | Plot no-66 | Plot no-68 |
| 68 | 68 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-57 and 56 | 09 Meter road | Plot no-67 | Plot no-69 |
| 69 | 69 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-55 and 56 | 09 Meter road | Plot no-68 | Plot no-70 |
| 70 | 70 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-55 | 09 Meter road | Plot no-69 | Plot no-71 |
| 71 | 71 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-54 and 55 | 09 Meter road | Plot no-70 | Plot no-72 |
| 72 | 72 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-54 and 53 | 09 Meter road | Plot no-71 | Plot no-73 |
| 73 | 73 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-52 and 53 | 09 Meter road | Plot no-72 | Plot no-74 |
| 74 | 74 | Residential | 151.69 | 1632.79 | Phase II | In Progress | 12 | 12 | 12.64 | 12.64 | Plot No-52 | 09 Meter road | Plot no-73 | 12 Meter road |
| 75 | 75 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-76 | 12 Meter road |
| 76 | 76 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-77 | Plot no-75 |
| 77 | 77 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-78 | Plot no-76 |
| 78 | 78 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-79 | Plot no-77 |
| 79 | 79 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-80 | Plot no-78 |
| 80 | 80 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-81 | Plot no-79 |
| 81 | 81 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-82 | Plot no-80 |
| 82 | 82 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-83 | Plot no-81 |
| 83 | 83 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-84 | Plot no-82 |
| 84 | 84 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-85 | Plot no-83 |
| 85 | 85 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-86 | Plot no-84 |
| 86 | 86 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-87 | Plot no-85 |
| 87 | 87 | Residential | 182.99 | 1969.7 | Phase II | In Progress | 12 | 12.01 | 15.51 | 14.99 | 09 Meter road | Sy No-145/4 | 9m Wide Road | Plot no-86 |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 01-01-2021 | 31-12-2023 |
| 2 | Formation Of Road, Footpath | Yes | 01-01-2021 | 31-12-2023 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 01-01-2021 | 31-12-2023 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 01-01-2021 | 31-12-2023 |
| 5 | Power Supply Work(Tansformer And Substation) | Yes | 01-01-2021 | 31-12-2023 |
| 6 | Construction Of Storm Water Drainage | Yes | 01-01-2021 | 31-12-2023 |
| 7 | Solid Waste Management and Disposal | Yes | 01-01-2021 | 31-12-2023 |
| 8 | Tree Plantation And LandScape Work | Yes | 01-01-2021 | 31-12-2023 |
| 9 | Street Lighting | Yes | 01-01-2021 | 31-12-2023 |
| 10 | Other Miscellaneous Work | No |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | Yes |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Gas | No |
| 13 | Water and Sanitation | No |
| 14 | Air conditioning and incarnation | No |
| 15 | Kids Play Area | Yes |
| 16 | Open Party Lawn/Yoga Area | Yes |
| 17 | Stage/Skating rink (Small) | Yes |
| Total number of Plots | 87 |
| No. of Public and Semi Pubic Sites | 2 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 1735 |
| No. of Parks and Open Spaces | 5 |
| Area of Parks and Open Spaces(in Sq.m) | 3490 |
| Area of Road/Transportation(in Sq.m) | 10593 |
| Appeals / FNH | NO APPEALS / FNH |