Sammy's Beverly Hills Phase-II
SAMMYS DREAM LAND CO PRIVATE LIMITED
Sy No:145/3 146/1 & 147 of Hosahalli Village, Jala Hobli, Bengaluru North Taluk, Bangaluru Urban District
Approved
11th Jan 2021
Completed
31st Dec 2023
Registration No.
PRM/KA/RERA/1251/309/PR/210111/003782
Acknowledgement No.
ACK/KA/RERA/1251/309/PR/201219/004454
Project Type
Plotted Development
Approving Authority
BIAPPA - Bangalore Airport Area Planning Authority
District
Bengaluru Urban
Taluka
Bengaluru North
State
Karnataka
Project Details
| Project Name | Sammy's Beverly Hills Phase-II |
| Project Description | Residential Layout comprises of 87 plots of different dimensions |
| Project Type | Plotted Development |
| Project Status | Completed |
| Project Start Date | 01-01-2021 |
| Proposed Project Completion Date | 31-12-2023 |
| Total Area Of Land (Sq Mtr) | 34650 |
| Total Coverd Area (Sq Mtr) | 17863 |
| Total Open Area (Sq Mtr) | 16787 |
| Estimated Cost of Construction (INR) | 52582500 |
| Cost of Land (INR) | 169900000 |
| Total Project Cost (INR) | 222482500 |
| Project Address | Sy No:145/3 146/1 & 147 of Hosahalli Village, Jala Hobli, Bengaluru North Taluk, Bangaluru Urban District |
| District | Bengaluru Urban |
| Taluk | Bengaluru North |
| Approving Authority | BIAPPA - Bangalore Airport Area Planning Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Type of Inventory | 12.19 m x 24.38 m |
| No of Inventory | 18 |
| Carpet Area (Sq Mtr) | 0SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0SqMtr |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Local Authority |
| Solid Waste Management And Disposal | Local Authority |
| Fire Fighting facility | Local Authority |
| Drinking Water Facility | Local Authority |
| Emergency Evacuation Services | Local Authority |
| Use of Renewable Energy | Local Authority |
| Bank Name | IDFC FIRST BANK |
| Branch | Sahakarnagar Branch |
| ifscCode | IDFB0080183 |
| Account No.(70% Account) | 98452885751 |
| State | Karnataka |
| Name | SATEESHA U S |
| Address | 149C, Chennagiri Mansion, 11th C Cross, 1st Main,2nd Stage, West of Chord Road, Mahalakshmipuram |
| Pin Code | 560086 |
| Year Of Establishment | 2018 |
| Number of Project Completed | 5 |
| Reg. Of COA No. | BCC/BL-3.6/A:1779:08-09 |
| Local Authority Licence Number | BCC/BL-3.6/E:4426/2018-19 |
Promoter Details
| Promoter Type | Company |
| Name | SURESH GOPAL DAS NANWANI |
| PAN Number | AAC******* |
| Address | No.9, 2nd Floor, BEL Air Drive, Mekhri Circle, Bellary road.Bangalore |
| District | Bengaluru Urban |
| State/UT | Karnataka |
| PIN Code | 560032 |
| Company Registration No. | 08 17657 |
| Type | Board Member |
| Pin Code | 560032 |
| Sl No. |
Modification Plan Details
| Type of Inventory | 12.19 m x 24.38 m |
| No of Inventory | 18 |
| Carpet Area (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
Residential Plot Details
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | Residential | 310.26 | 3339.64 | Phase II | In Progress | 19.79 | 20.1 | 15.56 | 15.56 | Sy No-21 | 12 meter Road | Plot No-02 | Park No-01 |
| 2 | 2 | Residential | 246.43 | 2652.57 | Phase II | In Progress | 20.1 | 20.33 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-03 | Plot No-01 |
| 3 | 3 | Residential | 249.32 | 2683.68 | Phase II | In Progress | 20.33 | 20.57 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-04 | Plot No-02 |
| 4 | 4 | Residential | 252.21 | 2714.79 | Phase II | In Progress | 20.57 | 20.81 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-05 | Plot No-03 |
| 5 | 5 | Residential | 255.11 | 2746 | Phase II | In Progress | 20.81 | 21.05 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-06 | Plot No-04 |
| 6 | 6 | Residential | 258 | 2777.11 | Phase II | In Progress | 21.05 | 21.28 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-07 | Plot No-05 |
| 7 | 7 | Residential | 260.89 | 2808.22 | Phase II | In Progress | 21.28 | 21.52 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-08 | Plot No-06 |
| 8 | 8 | Residential | 263.79 | 2839.44 | Phase II | In Progress | 21.52 | 21.76 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-09 | Plot No-07 |
| 9 | 9 | Residential | 266.68 | 2870.54 | Phase II | In Progress | 21.76 | 22 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-10 | Plot No-08 |
| 10 | 10 | Residential | 269.57 | 2901.65 | Phase II | In Progress | 22 | 22.23 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-11 | Plot No-09 |
| 11 | 11 | Residential | 272.46 | 2932.76 | Phase II | In Progress | 22.23 | 22.47 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-12 | Plot No-10 |
| 12 | 12 | Residential | 275.36 | 2963.98 | Phase II | In Progress | 22.47 | 22.71 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-13 | Plot No-11 |
| 13 | 13 | Residential | 278.25 | 2995.08 | Phase II | In Progress | 22.71 | 22.94 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-14 | Plot No-12 |
| 14 | 14 | Residential | 281.14 | 3026.19 | Phase II | In Progress | 22.94 | 23.18 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-15 | Plot No-13 |
| 15 | 15 | Residential | 284.04 | 3057.41 | Phase II | In Progress | 23.18 | 23.42 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-16 | Plot No-14 |
| 16 | 16 | Residential | 286.93 | 3088.51 | Phase II | In Progress | 23.42 | 23.66 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Plot No-17 | Plot No-15 |
| 17 | 17 | Residential | 289.82 | 3119.62 | Phase II | In Progress | 23.66 | 23.89 | 12.19 | 12.19 | Sy No-21 | 12 meter Road | Park No-02 | Plot No-16 |
| 18 | 18 | Residential | 275.66 | 2967.2 | Phase II | In Progress | 24.38 | 20.68 | 13.09 | 11.59 | 12 Meter Road | Sy No-146(P) | Park no-03 | Plot no-19 |
| 19 | 19 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-18 | plot no-20 |
| 20 | 20 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-19 | plot no-21 |
| 21 | 21 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-20 | plot no-22 |
| 22 | 22 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-21 | plot no-23 |
| 23 | 23 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-22 | plot no-24 |
| 24 | 24 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-23 | plot no-25 |
| 25 | 25 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-24 | plot no-26 |
| 26 | 26 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-25 | plot no-27 |
| 27 | 27 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-26 | plot no-28 |
| 28 | 28 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-27 | plot no-29 |
| 29 | 29 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-28 | plot no-30 |
| 30 | 30 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-29 | plot no-31 |
| 31 | 31 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-30 | plot no-32 |
| 32 | 32 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-31 | plot no-33 |
| 33 | 33 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-32 | plot no-34 |
| 34 | 34 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-33 | plot no-35 |
| 35 | 35 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-34 | plot no-36 |
| 36 | 36 | Residential | 297.19 | 3198.95 | Phase II | In Progress | 24.38 | 24.38 | 12.19 | 12.19 | 12 Meter Road | Sy No-146(P) | Plot no-35 | plot no-37 |
| 37 | 37 | Residential | 343.52 | 3697.65 | Phase II | In Progress | 24.42 | 24.38 | 14.82 | 13.36 | 12 Meter Road | Sy No-146(P) | Plot no-36 | Sy No-147 |
| 38 | 38 | Residential | 122.17 | 1315.04 | Phase II | In Progress | 11.8 | 11.57 | 10.63 | 10.3 | Sy No-146(P) | 15 meter Road | Plot no-39 | Sy No-146/1 |
| 39 | 39 | Residential | 139.41 | 1500.61 | Phase II | In Progress | 11.57 | 11.31 | 12.19 | 12.19 | Sy No-146(P) | 15 meter Road | Plot no-40 | Plot no-38 |
| 40 | 40 | Residential | 136.26 | 1466.7 | Phase II | In Progress | 11.31 | 11.05 | 12.19 | 12.19 | Sy No-146(P) | 15 meter Road | Plot no-41 | Plot no-39 |
| 41 | 41 | Residential | 133.11 | 1432.8 | Phase II | In Progress | 11.05 | 10.79 | 12.19 | 12.19 | Sy No-146(P) | 15 meter Road | Plot no-42 | Plot no-40 |
| 42 | 42 | Residential | 129.97 | 1399 | Phase II | In Progress | 10.79 | 10.53 | 12.19 | 12.19 | Sy No-146(P) | 15 meter Road | Plot no-43 | Plot no-41 |
| 43 | 43 | Residential | 126.82 | 1365.09 | Phase II | In Progress | 10.53 | 10.27 | 12.19 | 12.19 | Sy No-146(P) | 15 meter Road | Plot no-44 | Plot no-42 |
| 44 | 44 | Residential | 123.67 | 1331.18 | Phase II | In Progress | 10.27 | 10.02 | 12.19 | 12.19 | Sy No-146(P) | 15 meter Road | Park No-04 | Plot no-43 |
| 45 | 45 | Commercial | 967.77 | 10417.08 | Phase II | In Progress | 29.6 | 29.95 | 32.7 | 31.89 | Plot No-46 and 47 | Sy No-145/2 | CA-02 | Sy No-146/1 |
| 46 | 46 | Residential | 398.8 | 4292.68 | Phase II | In Progress | 18.3 | 18.29 | 22.06 | 21.55 | 15 meter Road | Commercial plot no-45 | Plot No-47 | Sy No-146/1 |
| 47 | 47 | Residential | 222.96 | 2399.94 | Phase II | In Progress | 18.29 | 18.29 | 12.19 | 12.19 | 15 meter Road | Commercial plot no-45 | Plot No-48 | Plot no-46 |
| 48 | 48 | Residential | 222.96 | 2399.94 | Phase II | In Progress | 18.29 | 18.29 | 12.19 | 12.19 | 15 meter Road | CA-02 | Plot No-49 | Plot no-47 |
| 49 | 49 | Residential | 222.96 | 2399.94 | Phase II | In Progress | 18.29 | 18.29 | 12.19 | 12.19 | 15 meter Road | CA-02 | Plot No-50 | Plot no-48 |
| 50 | 50 | Residential | 222.96 | 2399.94 | Phase II | In Progress | 18.29 | 18.29 | 12.19 | 12.19 | 15 meter Road | CA-02 | Plot No-51 | Plot no-49 |
| 51 | 51 | Residential | 222.96 | 2399.94 | Phase II | In Progress | 18.29 | 18.29 | 12.19 | 12.19 | 15 meter Road | CA-02 | 12 Meter road | Plot no-50 |
| 52 | 52 | Residential | 217.9 | 2345.48 | Phase II | In Progress | 15.24 | 15.24 | 14.3 | 14.3 | 15 meter Road | Plot No-74 and 73 | Plot no-53 | 12 Meter road |
| 53 | 53 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-73 and 72 | Plot no-54 | Plot no-52 |
| 54 | 54 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-72 and 71 | Plot no-55 | Plot no-53 |
| 55 | 55 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-70 and 69 | Plot no-56 | Plot no-54 |
| 56 | 56 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-69 and 68 | Plot no-57 | Plot no-55 |
| 57 | 57 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-68 and 67 | Plot no-58 | Plot no-56 |
| 58 | 58 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-66 and65 | Plot no-59 | Plot no-57 |
| 59 | 59 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-65 and 64 | Plot no-60 | Plot no-58 |
| 60 | 60 | Residential | 185.78 | 1999.74 | Phase II | In Progress | 15.24 | 15.24 | 12.19 | 12.19 | 15 meter Road | Plot No-64 and 63 | Plot no-61 | Plot no-59 |
| 61 | 61 | Residential | 196.86 | 2119 | Phase II | In Progress | 15.24 | 15.25 | 13.24 | 12.19 | 15 meter Road | Plot No-62 | 09 Meter road | Plot no-60 |
| 62 | 62 | Residential | 150.14 | 1616.11 | Phase II | In Progress | 12 | 12.01 | 12.77 | 12.25 | Plot No-61 | 09 Meter road | 09 Meter road | Plot no-63 |
| 63 | 63 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-60 | 09 Meter road | Plot no-62 | Plot no-64 |
| 64 | 64 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-60 and 59 | 09 Meter road | Plot no-63 | Plot no-65 |
| 65 | 65 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-58 and 59 | 09 Meter road | Plot no-64 | Plot no-66 |
| 66 | 66 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-58 | 09 Meter road | Plot no-65 | Plot no-67 |
| 67 | 67 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-57 and 58 | 09 Meter road | Plot no-66 | Plot no-68 |
| 68 | 68 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-57 and 56 | 09 Meter road | Plot no-67 | Plot no-69 |
| 69 | 69 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-55 and 56 | 09 Meter road | Plot no-68 | Plot no-70 |
| 70 | 70 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-55 | 09 Meter road | Plot no-69 | Plot no-71 |
| 71 | 71 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-54 and 55 | 09 Meter road | Plot no-70 | Plot no-72 |
| 72 | 72 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-54 and 53 | 09 Meter road | Plot no-71 | Plot no-73 |
| 73 | 73 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | Plot No-52 and 53 | 09 Meter road | Plot no-72 | Plot no-74 |
| 74 | 74 | Residential | 151.69 | 1632.79 | Phase II | In Progress | 12 | 12 | 12.64 | 12.64 | Plot No-52 | 09 Meter road | Plot no-73 | 12 Meter road |
| 75 | 75 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-76 | 12 Meter road |
| 76 | 76 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-77 | Plot no-75 |
| 77 | 77 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-78 | Plot no-76 |
| 78 | 78 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-79 | Plot no-77 |
| 79 | 79 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-80 | Plot no-78 |
| 80 | 80 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-81 | Plot no-79 |
| 81 | 81 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-82 | Plot no-80 |
| 82 | 82 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-83 | Plot no-81 |
| 83 | 83 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-84 | Plot no-82 |
| 84 | 84 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-85 | Plot no-83 |
| 85 | 85 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-86 | Plot no-84 |
| 86 | 86 | Residential | 108 | 1162.51 | Phase II | In Progress | 12 | 12 | 9 | 9 | 09 Meter road | Sy No-145/4 | Plot no-87 | Plot no-85 |
| 87 | 87 | Residential | 182.99 | 1969.7 | Phase II | In Progress | 12 | 12.01 | 15.51 | 14.99 | 09 Meter road | Sy No-145/4 | 9m Wide Road | Plot no-86 |
Project Development Schedule
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 01-01-2021 | 31-12-2023 |
| 2 | Formation Of Road, Footpath | Yes | 01-01-2021 | 31-12-2023 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 01-01-2021 | 31-12-2023 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 01-01-2021 | 31-12-2023 |
| 5 | Power Supply Work(Tansformer And Substation) | Yes | 01-01-2021 | 31-12-2023 |
| 6 | Construction Of Storm Water Drainage | Yes | 01-01-2021 | 31-12-2023 |
| 7 | Solid Waste Management and Disposal | Yes | 01-01-2021 | 31-12-2023 |
| 8 | Tree Plantation And LandScape Work | Yes | 01-01-2021 | 31-12-2023 |
| 9 | Street Lighting | Yes | 01-01-2021 | 31-12-2023 |
| 10 | Other Miscellaneous Work | No |
Amenities & Utilities Availability
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | Yes |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Gas | No |
| 13 | Water and Sanitation | No |
| 14 | Air conditioning and incarnation | No |
| 15 | Kids Play Area | Yes |
| 16 | Open Party Lawn/Yoga Area | Yes |
| 17 | Stage/Skating rink (Small) | Yes |
Post Registration Details
| Total number of Plots | 87 |
| No. of Public and Semi Pubic Sites | 2 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 1735 |
| No. of Parks and Open Spaces | 5 |
| Area of Parks and Open Spaces(in Sq.m) | 3490 |
| Area of Road/Transportation(in Sq.m) | 10593 |
Appeals & Complaints
| Appeals / FNH | NO APPEALS / FNH |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Bangalore


Ask Pulse Ai anything about real estate