SIDVIN DEVELOPERS PRIVATE LIMITED
Bengaluru East
Approved
6th Mar 2024
Completed
31st Dec 2025
Registration No.
PRM/KA/RERA/1251/446/PR/060324/006689
Acknowledgement No.
ACK/KA/RERA/1251/446/PR/150224/007872
Project Type
Plotted Development
District
Bengaluru Urban
Taluka
Bengaluru East
State
Karnataka
| Number of Survey No./CMC No./CTS No./PID No. | 15 |
| Is there any Litigations on Land/Property/Khatha? | NO |
| Type of Firm | Company |
| Promoter Name | SIDVIN DEVELOPERS PRIVATE LIMITED |
| Main Objectives | PLOTTED DEVELOPMENT |
| Registration Number | U45400KA2013PTC070369 |
| PAN | ABSPV3654J |
| GSTIN | 29AAECV5256C3Z7 |
| Promoter Address | FLAT NO.T4, 3RD FLOOR, PRINCETON PARK VIEW,, SHANTHINIKETHAN LAYOUT, AREKARE, BANGALORE - 560076, Karnataka, INDIA,FLAT NO.T4, 3RD FLOOR, PRINCETON PARK VIEW,, SHANTHINIKETHAN LAYOUT, AREKARE, BANGALORE - 560076, Karnataka, INDIA ,Bengaluru East ,Bengaluru Urban-560076 |
| District | Bengaluru Urban |
| Taluk | Bengaluru East |
| PIN Code | 560076 |
| Name of Authorized Signatory | SHEKAR G |
| Name of CEO/MD | NALLAGAMPALLI VIKRAM PAPUDESI |
| Designation | Managing Director |
| Director Identification (DIN) Number | 07094120 |
| Number of Directors | 6 |
| Is there any RERA Registrations in other State / UT ? | NO |
| Is there any Projects Launched In The Past 5 Years in Karnataka ? | NO |
| Present Address | Villa No 82,Akshaya Red Stone,Opp Shell Petrol Bunk,Seegehalli,Bengalore , Bengaluru Urban , Karnataka - 560067 |
| Permanent Address | Villa No 82,Akshaya Red Stone,Opp Shell Petrol Bunk,Seegehalli,Bengalore , Bengaluru Urban , Karnataka - 560067 |
| Official Address | Villa No 82,Akshaya Red Stone,Opp Shell Petrol Bunk,Seegehalli,Bengalore , Bengaluru Urban , Karnataka - 560067 |
| Sl No. | |
| Sl No._1 | |
| Sl No._2 | |
| Sl No._3 |
| Type of Inventory | 6.10 M X 9.14 M |
| No of Inventory | 9 |
| Carpet Area (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | ODD | ODD | 84.78 | NA | Work In Progress | 10.59 | 10.55 | 8.6 | 7.53 | Private Property | 9.14 mtrs Road | Private Property | Site No 2 |
| 2 | 2 | ODD | ODD | 68.31 | NA | Work In Progress | 9.82 | 9.77 | 7.53 | 6.53 | Private Property | 9.14 mtrs Road | Site No 1 | Site No 3 |
| 3 | 3 | ODD | ODD | 59.77 | NA | Work In Progress | 9.94 | 9.89 | 6.53 | 5.52 | Private Property | 9.14 mtrs Road | Site No 2 | Site No 4 |
| 4 | 4 | ODD | ODD | 97.23 | NA | Work In Progress | 13.17 | 12.33 | 5.52 | 10.3 | Private Property | 9.14 mtrs Road | Site No 3 | Site No 5 |
| 5 | 5 | ODD | ODD | 110.38 | NA | Work In Progress | 9.81 | 9.14 | 10.3 | 13.86 | Private Property | 9.14 mtrs Road | Site No 4 | Site No 6 |
| 6 | 6 | ODD | ODD | 139.77 | NA | Work In Progress | 9.54 | 9.14 | 13.86 | 15.76 | Private Property | 9.14 mtrs Road | Site No 5 | Site No 7 & 8 |
| 7 | 7 | ODD | ODD | 66.89 | NA | Work In Progress | 9.15 | 9.14 | 7.53 | 7.11 | Private Property | Site no 8 | Site No 6 | 9.14 Mtrs Road |
| 8 | 8 | ODD | ODD | 75.22 | NA | Work In Progress | 9.14 | 9.14 | 8.23 | 8.23 | Site No 7 | 9.14 mtrs Road | Site No 6 | 9.14 Mtrs Road |
| 9 | 9 | 9.14 X 12.19 | 9.14 X 12.19 | 111.42 | NA | Work In Progress | 9.14 | 9.14 | 12.19 | 12.19 | 9.14 mtrs Road | Site No 24 | Site no 10 | 9.14 Mtrs Road |
| 10 | 10 | 9.14X12.19 | 9.14 X 12.19 | 111.42 | NA | Work In Progress | 9.14 | 9.14 | 12.19 | 12.19 | 9.14 mtrs Road | Site No 23 | Site no 11 | Site no 9 |
| 11 | 11 | 9.14X12.19 | 9.14 X 12.19 | 111.42 | NA | Work In Progress | 9.14 | 9.14 | 12.19 | 12.19 | 9.14 mtrs Road | Site No 22 | Site no 12 | Site No 10 |
| 12 | 12 | 9.14X12.19 | 9.14 X 12.19 | 111.42 | NA | Work In Progress | 9.14 | 9.14 | 12.19 | 12.19 | 9.14 mtrs Road | Site No 21 | Site no 13 | Site no 11 |
| 13 | 13 | 9.14X12.19 | 9.14 X 12.19 | 111.42 | NA | Work In Progress | 9.14 | 9.14 | 12.19 | 12.19 | 9.14 mtrs Road | Site No 20 | Site no 14 | Site no 12 |
| 14 | 14 | 9.14X12.19 | 9.14 X 12.19 | 111.42 | NA | Work In Progress | 9.14 | 9.14 | 12.19 | 12.19 | 9.14 mtrs Road | Site No 19 | Site no 15 | Site no 13 |
| 15 | 15 | 9.14X12.19 | 9.14 X 12.19 | 111.42 | NA | Work In Progress | 9.14 | 9.14 | 12.19 | 12.19 | 9.14 mtrs Road | Site No 18 | Site no 16 | Site no 14 |
| 16 | 16 | ODD | ODD | 86.38 | NA | Work In Progress | 7.13 | 7.17 | 12.19 | 12.19 | 9.14 mtrs Road | Site No 17 | Private Property | Site no 15 |
| 17 | 17 | ODD | ODD | 65.3 | NA | Work In Progress | 7.17 | 7.24 | 9.14 | 9.14 | Site No 16 | 9.14 mtrs Road | Private Property | Site No 18 |
| 18 | 18 | 9.14X9.14 | 9.14X9.14 | 83.54 | NA | Work In Progress | 9.14 | 9.14 | 9.14 | 9.14 | Site No 15 | 9.14 mtrs Road | Site No 17 | Site No 19 |
| 19 | 19 | 9.14X9.14 | 9.14X9.14 | 83.54 | NA | Work In Progress | 9.14 | 9.14 | 9.14 | 9.14 | Site No 14 | 9.14 mtrs Road | Site No 18 | Site No 20 |
| 20 | 20 | 9.14X9.14 | 9.14X9.14 | 83.54 | NA | Work In Progress | 9.14 | 9.14 | 9.14 | 9.14 | Site No 13 | 9.14 mtrs Road | Site No 19 | Site No 21 |
| 21 | 21 | 9.14X9.14 | 9.14X9.14 | 83.54 | NA | Work In Progress | 9.14 | 9.14 | 9.14 | 9.14 | Site No 12 | 9.14 mtrs Road | Site No 20 | Site No 22 |
| 22 | 22 | 9.14X9.14 | 9.14X9.14 | 83.54 | NA | Work In Progress | 9.14 | 9.14 | 9.14 | 9.14 | Site No 11 | 9.14 mtrs Road | Site No 21 | Site No 23 |
| 23 | 23 | 9.14X9.14 | 9.14X9.14 | 83.54 | NA | Work In Progress | 9.14 | 9.14 | 9.14 | 9.14 | Site No 10 | 9.14 mtrs Road | Site No 22 | Site No 24 |
| 24 | 24 | 9.14X9.14 | 9.14X9.14 | 83.54 | NA | Work In Progress | 9.14 | 9.14 | 9.14 | 9.14 | Site No 9 | 9.14 mtrs Road | Site No 23 | 9.14 Mtrs Road |
| 25 | 25 | ODD | ODD | 107.28 | NA | Work In Progress | 12.19 | 12.3 | 9.6 | 8 | Site No 26 | Private Property | 9.14 Mtrs Road | Site No 44 |
| 26 | 26 | ODD | ODD | 97.52 | NA | Work In Progress | 12.19 | 12.19 | 8 | 8 | Site No 27 | Site No 25 | 9.14 Mtrs Road | Site No 43 |
| 27 | 27 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | 9.14 mtrs Road | Site No 26 | 9.14 Mtrs Road | Site No 42 |
| 28 | 28 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 29 | 9.14 mtrs Road | 9.14 Mtrs Road | Site No 41 |
| 29 | 29 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 30 | Site No 28 | 9.14 Mtrs Road | Site No 40 |
| 30 | 30 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 31 | Site No 29 | 9.14 Mtrs Road | Site No 39 |
| 31 | 31 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 32 | Site No 30 | 9.14 Mtrs Road | Site No 38 |
| 32 | 32 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 33 | Site No 31 | 9.14 Mtrs Road | Site No 37 |
| 33 | 33 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 34 | Site No 32 | 9.14 Mtrs Road | Site No 36 |
| 34 | 34 | ODD | ODD | 179.33 | NA | Work In Progress | 9.33 | 12.19 | 21.85 | 13.05 | Private Property | Site No 33 | 9.14 Mtrs Road | Site No 35 |
| 35 | 35 | ODD | ODD | 182.27 | NA | Work In Progress | 12.83 | 12.19 | 13.05 | 17.07 | Private Property | Site No 36 | Site No 34 | 9.14 Mtrs Road |
| 36 | 36 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 35 | Site No 37 | Site no 33 | 9.14 Mtrs Road |
| 37 | 37 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 36 | Site No 38 | Site No 32 | 9.14 Mtrs Road |
| 38 | 38 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 37 | Site No 39 | Site No 31 | 9.14 Mtrs Road |
| 39 | 39 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 38 | Site No 40 | Site No 30 | 9.14 Mtrs Road |
| 40 | 40 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 39 | Site No 41 | Site No 29 | 9.14 Mtrs Road |
| 41 | 41 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 40 | 9.14 mtrs Road | Site No 28 | 9.14 Mtrs Road |
| 42 | 42 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | 9.14 mtrs Road | Site No 43 | Site No 27 | 9.14 Mtrs Road |
| 43 | 43 | ODD | ODD | 97.52 | NA | Work In Progress | 12.19 | 12.19 | 8 | 8 | Site No 42 | Site No 44 | Site No 26 | 9.14 Mtrs Road |
| 44 | 44 | ODD | ODD | 88.03 | NA | Work In Progress | 12.19 | 12.28 | 8 | 6.55 | Site No 43 | Private Property | Site No 25 | 9.14 Mtrs Road |
| 45 | 45 | ODD | ODD | 163.23 | NA | Work In Progress | 15.24 | 16.94 | 14.04 | 6.63 | Site No 46 | Private Property | 9.14 Mtrs Road | Site No 62 |
| 46 | 46 | 9.14X15.24 | 9.14X15.24 | 139.29 | NA | Work In Progress | 15.24 | 15.24 | 9.14 | 9.14 | 9.14 mtrs Road | Site No 45 | 9.14 Mtrs Road | Site No 62 |
| 47 | 47 | 9.14X15.24 | 9.14X15.24 | 139.29 | NA | Work In Progress | 15.24 | 15.24 | 9.14 | 9.14 | Site No 48 | 9.14 mtrs Road | 9.14 Mtrs Road | Site No 60 & 61 |
| 48 | 48 | 9.14X15.24 | 9.14X15.24 | 139.29 | NA | Work In Progress | 15.24 | 15.24 | 9.14 | 9.14 | Site No 49 | Site No 47 | 9.14 Mtrs Road | Site No 60 & 61 |
| 49 | 49 | 9.14X15.24 | 9.14X15.24 | 139.29 | NA | Work In Progress | 15.24 | 15.24 | 9.14 | 9.14 | Site No 50 | Site No 48 | 9.14 Mtrs Road | Site No 59 & 60 |
| 50 | 50 | 9.14X15.24 | 9.14X15.24 | 139.29 | NA | Work In Progress | 15.24 | 15.24 | 9.14 | 9.14 | Site No 51 | Site No 49 | 9.14 Mtrs Road | Site No 59 |
| 51 | 51 | 9.14X15.24 | 9.14X15.24 | 139.29 | NA | Work In Progress | 15.24 | 15.24 | 9.14 | 9.14 | Site No 52 | Site No 50 | 9.14 Mtrs Road | Site No 58 |
| 52 | 52 | 9.14X15.24 | 9.14X15.24 | 139.29 | NA | Work In Progress | 15.24 | 15.24 | 9.14 | 9.14 | Site No 53 | Site No 51 | 9.14 Mtrs Road | Site No 57 & 58 |
| 53 | 53 | 9.14X15.24 | 9.14X15.24 | 139.29 | NA | Work In Progress | 15.24 | 15.24 | 9.14 | 9.14 | Site No 54 | Site No 52 | 9.14 Mtrs Road | Site No 56 & 57 |
| 54 | 54 | ODD | ODD | 204.98 | NA | Work In Progress | 16.05 | 15.24 | 10.94 | 15.96 | Private Property | Site No 53 | 9.14 Mtrs Road | Site No 55 & 56 |
| 55 | 55 | ODD | ODD | 176.22 | NA | Work In Progress | 19.18 | 18.29 | 6.8 | 12.57 | Private Property | Site No 56 | Site no 54 | 9.14 Mtrs Road |
| 56 | 56 | 12.19X18.29 | 12.19X18.29 | 222.96 | NA | Work In Progress | 18.29 | 18.29 | 12.19 | 12.19 | Site No 55 | Site No 57 | Site No 53 & 54 | 9.14 Mtrs Road |
| 57 | 57 | 12.19X18.29 | 12.19X18.29 | 222.96 | NA | Work In Progress | 18.29 | 18.29 | 12.19 | 12.19 | Site No 56 | Site No 58 | Site No 52 & 53 | 9.14 Mtrs Road |
| 58 | 58 | 12.19X18.29 | 12.19X18.29 | 222.96 | NA | Work In Progress | 18.29 | 18.29 | 12.19 | 12.19 | Site No 57 | Site No 59 | Site No 51 & 52 | 9.14 Mtrs Road |
| 59 | 59 | 12.19X18.29 | 12.19X18.29 | 222.96 | NA | Work In Progress | 18.29 | 18.29 | 12.19 | 12.19 | Site No 58 | Site No 60 | Site No 49 & 50 | 9.14 Mtrs Road |
| 60 | 60 | 12.19X18.29 | 12.19X18.29 | 222.96 | NA | Work In Progress | 18.29 | 18.29 | 12.19 | 12.19 | Site No 59 | Site No 61 | Site No 48 & 49 | 9.14 Mtrs Road |
| 61 | 61 | ODD | ODD | 222.72 | NA | Work In Progress | 18.29 | 18.29 | 12.19 | 12.19 | Site No 60 | 9.14 mtrs Road | Site No 47 & 48 | 9.14 Mtrs Road |
| 62 | 62 | ODD | ODD | 197.1 | NA | Work In Progress | 18.29 | 21.06 | 15.77 | 5.34 | 9.14 mtrs Road | Private Property | Site No 45 & 46 | 9.14 Mtrs Road |
| 63 | 63 | ODD | ODD | 139.93 | NA | Work In Progress | 12.19 | 12.19 | 11.48 | 11.48 | Site No 64 | 9.14 mtrs Road | 9.14 Mtrs Road | Site No 70 |
| 64 | 64 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 65 | Site No 63 | 9.14 Mtrs Road | Site No 69 |
| 65 | 65 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 66 | Site No 64 | 9.14 Mtrs Road | Site No 68 |
| 66 | 66 | ODD | ODD | 110.59 | NA | Work In Progress | 12.78 | 12.19 | 7.16 | 10.98 | Private Property | Site No 65 | 9.14 Mtrs Road | Site No 67 |
| 67 | 67 | ODD | ODD | 182.63 | NA | Work In Progress | 14.19 | 12.19 | 10.98 | 23.14 | Private Property | Site No 68 | Site No 66 | 9.14 Mtrs Road |
| 68 | 68 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 67 | Site No 69 | Site No 65 | 9.14 Mtrs Road |
| 69 | 69 | 9.14X12.19 | 9.14X12.19 | 111.42 | NA | Work In Progress | 12.19 | 12.19 | 9.14 | 9.14 | Site No 68 | Site No 70 | Site No 64 | 9.14 Mtrs Road |
| 70 | 70 | ODD | ODD | 139.93 | NA | Work In Progress | 12.19 | 12.19 | 11.48 | 11.48 | Site No 69 | 9.14 mtrs Road | Site No 63 | 9.14 Mtrs Road |
| 71 | 71 | 6.10X9.14 | 6.10X9.14 | 55.75 | NA | Work In Progress | 9.14 | 9.14 | 6.1 | 6.1 | Site No 72 | 9.14 mtrs Road | 9.14 Mtrs Road | Site No 84 |
| 72 | 72 | 6.10X9.14 | 6.10X9.14 | 55.75 | NA | Work In Progress | 9.14 | 9.14 | 6.1 | 6.1 | Site No 73 | Site No 71 | 9.14 Mtrs Road | Site No 84 |
| 73 | 73 | 6.10X9.14 | 6.10X9.14 | 55.75 | NA | Work In Progress | 9.14 | 9.14 | 6.1 | 6.1 | Site No 74 | Site No 72 | 9.14 Mtrs Road | Site No 83 |
| 74 | 74 | 6.10X9.14 | 6.10X9.14 | 55.75 | NA | Work In Progress | 9.14 | 9.14 | 6.1 | 6.1 | Site No 75 | Site No 73 | 9.14 Mtrs Road | Site No 82 |
| 75 | 75 | 6.10X9.14 | 6.10X9.14 | 55.75 | NA | Work In Progress | 9.14 | 9.14 | 6.1 | 6.1 | Site No 76 | Site No 74 | 9.14 Mtrs Road | Site No 81 |
| 76 | 76 | 6.10X9.14 | 6.10X9.14 | 55.75 | NA | Work In Progress | 9.14 | 9.14 | 6.1 | 6.1 | Site No 77 | Site No 75 | 9.14 Mtrs Road | Site No 80 |
| 77 | 77 | 6.10X9.14 | 6.10X9.14 | 55.75 | NA | Work In Progress | 9.14 | 9.14 | 6.1 | 6.1 | Site No 78 | Site No 76 | 9.14 Mtrs Road | Site No 79 |
| 78 | 78 | ODD | ODD | 58.44 | NA | Work In Progress | 9.48 | 9.14 | 7.68 | 5.17 | Private Property | Site No 77 | 9.14 Mtrs Road | Site No 79 |
| 79 | 79 | ODD | ODD | 91.54 | NA | Work In Progress | 9.48 | 9.14 | 11.27 | 8.76 | Private Property | Site No 80 | Site No 78 & 77 | 9.14 Mtrs Road |
| 80 | 80 | 6.10X9.14 | 6.10X9.14 | 55.75 | NA | Work In Progress | 9.14 | 9.14 | 6.1 | 6.1 | Site No 79 | Site No 81 | Site No 76 | 9.14 Mtrs Road |
| 81 | 81 | 6.10X9.14 | 6.10X9.14 | 55.75 | NA | Work In Progress | 9.14 | 9.14 | 6.1 | 6.1 | Site No 80 | Site No 82 | Site No 75 | 9.14 Mtrs Road |
| 82 | 82 | ODD | ODD | 53.82 | NA | Work In Progress | 9.14 | 8.09 | 6.1 | 6.19 | Site No 81 | Site No 83 | Site No 74 | 9.14 Mtrs Road |
| 83 | 83 | ODD | ODD | 44.29 | NA | Work In Progress | 8.09 | 6.43 | 6.1 | 6.32 | Site No 82 | Site No 84 | Site No 73 | 9.14 Mtrs Road |
| 84 | 84 | ODD | ODD | 58.3 | NA | Work In Progress | 6.43 | 3.12 | 12.2 | 12.64 | Site No 83 | 9.14 mtrs Road | Site No 71 & 72 | 9.14 Mtrs Road |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 25-01-2024 | 25-02-2024 |
| 2 | Formation Of Road, Footpath | Yes | 25-02-2024 | 25-03-2024 |
| 3 | Construction Of Water Supply Infrastucture | Yes | 25-03-2024 | 25-08-2024 |
| 4 | Construction Of Sewage System Infrastucture | No | ||
| 5 | Power Supply Work(Transformer & Substation) | Yes | 25-06-2024 | 25-12-2024 |
| 6 | Construction Of Storm Water Drainage | Yes | 25-08-2024 | 25-01-2025 |
| 7 | Solid Waste Management and Disposal | Yes | 25-08-2024 | 25-01-2025 |
| 8 | Tree Plantation And LandScape Work | Yes | 25-08-2024 | 25-06-2025 |
| 9 | Street Lighting | Yes | 25-12-2024 | 25-09-2025 |
| 10 | Sewage Treatment Plant (STP) | Yes | 25-08-2024 | 25-12-2025 |
| 11 | Other Miscellaneous Work | Yes | 25-01-2024 | 31-12-2025 |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Piped Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning | No |
| Total number of Plots | 84 |
| No. of Public and Semi Pubic Sites | 2 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 206 |
| No. of Parks and Open Spaces | 6 |
| Area of Parks and Open Spaces(in Sq.m) | 3062 |
| Area of Road/Transportation(in Sq.m) | 6980 |
| Project Start Date | 01-01-2024 |
| Project End Date | 31-12-2025 |
| If any extension of time has been granted | NO |
| Cost of land | 156556102 |
| Cost of construction | 88743898 |
| Total cost | 245300000 |
| Total amount collected From buyers | 244679519 |
| Whether any loan has been raised | NO |
| Total amount spent on Project for completion of the project | 247667294 |
| Total No of sites of Project | 84 |
| Total No of sites sold | 79 |
| Total No of sites unsold | 5 |
| Whether there is any changes in inventory details | NO |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |


Ask Pulse Ai anything about real estate
News, Infographics, Blogs & More! Delivered to your inbox.