EARTHEN HUES AND ESTATES PRIVATE LIMITED
Sy. No. 71/1 & 71/2, Doddajala Village, Jala Hobli, Bangalore North Thaluk
Approved
31st Jan 2018
Completed
2nd May 2017
Registration No.
PRM/KA/RERA/1251/309/PR/180131/001298
Acknowledgement No.
PR/KN/170814/001298
Project Type
Plotted Development
Approving Authority
BIAPPA - Bangalore Airport Area Planning Authority
District
Bengaluru Urban
Taluka
Bengaluru North
State
Karnataka
| Project Name | SONG OF TERRA |
| Project Description | BIAAPA Approved Layout Situated at North Bangalore |
| Project Type | Plotted Development |
| Project Status | Completed |
| Project Start Date | 22-06-2016 |
| Proposed Project Completion Date | 02-05-2017 |
| Total Area Of Land (Sq Mtr) | 22329 |
| Total Coverd Area (Sq Mtr) | 0 |
| Total Open Area (Sq Mtr) | 0 |
| Estimated Cost of Construction (INR) | 0 |
| Cost of Land (INR) | 236782408 |
| Total Project Cost (INR) | 236782408 |
| Project Address | Sy. No. 71/1 & 71/2, Doddajala Village, Jala Hobli, Bangalore North Thaluk |
| District | Bengaluru Urban |
| Taluk | Bengaluru North |
| Approving Authority | BIAPPA - Bangalore Airport Area Planning Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Type of Inventory | Plot |
| No of Inventory | 108 |
| Carpet Area (Sq Mtr) | 11582SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0SqMtr |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Local Authority |
| Solid Waste Management And Disposal | Self Development |
| Bank Name | ICICI Bank |
| Branch | Jayanagara |
| ifscCode | ICIC0000251 |
| Account No.(70% Account) | 025105007487 |
| State | Karnataka |
| Promoter Type | Company |
| Name | Ramakrishna Dutt P R |
| PAN Number | AAECE1305P |
| Address | # 1, OVH Road.Basavanagudi |
| District | Bengaluru Urban |
| State/UT | Karnataka |
| PIN Code | 560004 |
| Company Registration No. | U70100KA2015PTC083478 |
| Type | Director |
| Pin Code | 560004 |
| Type of Inventory | Plot |
| No of Inventory | 108 |
| Carpet Area (Sq Mtr) | 11582 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | Odd | 8.96mX12.19m | 8.96*12.19 | Phase 1 | Completed | 10.82 | 7.1 | 12.74 | 12.19 | Sy No. 46 | Site No. 2 | Site No. 22 | 9M Wide Road |
| 2 | 2 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 1 | Site No. 3 | Site No. 21 & 22 | 9M Wide Road |
| 3 | 3 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 2 | Site No. 4 | Site No. 20 & 21 | 9M Wide Road |
| 4 | 4 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 3 | Site No. 5 | Site No. 19 | 9M Wide Road |
| 5 | 5 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 4 | Site No. 6 | Site No. 18 | 9M Wide Road |
| 6 | 6 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 5 | Site No. 7 | Site No. 17 | 9M Wide Road |
| 7 | 7 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 6 | Site No. 8 | Site No. 16 | 9M Wide Road |
| 8 | 8 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 7 | Site No. 9 | Site No. 15 | 9M Wide Road |
| 9 | 9 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 8 | Site No. 10 | Site No. 14 | 9M Wide Road |
| 10 | 10 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 9 | Site No. 11 | Site No. 13 | 9M Wide Road |
| 11 | 11 | Odd | 10.06mX12.19m | 10.06*12.19 | Phase 1 | Completed | 10.55 | 9.56 | 12.19 | 12.23 | Site No. 10 | 9M Wide Road | Site No. 12 | 9M Wide Road |
| 12 | 12 | Odd | 9.06mX12.19m | 9.06*12.19 | Phase 1 | Completed | 9.56 | 8.56 | 12.19 | 12.23 | Site No. 13 | 9M Wide Road | 9M Wide Road | Site No. 11 |
| 13 | 13 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 14 | Site No. 12 | 9M Wide Road | Site No. 10 |
| 14 | 14 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 15 | Site No. 13 | 9M Wide Road | Site No. 9 |
| 15 | 15 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 16 | Site No. 14 | 9M Wide Road | Site No. 8 |
| 16 | 16 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 17 | Site No. 15 | 9M Wide Road | Site No. 7 |
| 17 | 17 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 18 | Site No. 16 | 9M Wide Road | Site No. 6 |
| 18 | 18 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 19 | Site No. 17 | 9M Wide Road | Site No. 5 |
| 19 | 19 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 20 | Site No. 18 | 9M Wide Road | Site No. 4 |
| 20 | 20 | Odd | 7.62mX12.19m | 7.62*12.19 | Phase 1 | Completed | 7.62 | 7.62 | 12.19 | 12.19 | Site No. 21 | Site No. 19 | 9M Wide Road | Site No. 2 & 3 |
| 21 | 21 | Odd | 7.62mX12.19m | 7.62*12.19 | Phase 1 | Completed | 7.62 | 7.62 | 12.19 | 12.19 | Site No. 22 | Site No. 20 | 9M Wide Road | Site No. 2 & 3 |
| 22 | 22 | Odd | 8.28mX12.19m | 8.28*12.19 | Phase 1 | Completed | 10.14 | 6.42 | 12.74 | 12.19 | Sy No. 46 | Site No. 21 | 9M Wide Road | Site No. 1 & 2 |
| 23 | 23 | Odd | 8.96mX12.19m | 8.96*12.19 | Phase 1 | Completed | 10.82 | 7.1 | 12.74 | 12.19 | Sy No. 46 | Site No. 24 | Site No. 42 | 9M Wide Road |
| 24 | 24 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 23 | Site No. 25 | Site No. 41 & 42 | 9M Wide Road |
| 25 | 25 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 24 | Site No. 26 | Site No. 40 & 41 | 9M Wide Road |
| 26 | 26 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 25 | Site No. 27 | Site No. 39 | 9M Wide Road |
| 27 | 27 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 26 | Site No. 28 | Site No. 38 | 9M Wide Road |
| 28 | 28 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 27 | Site No. 29 | Site No. 37 | 9M Wide Road |
| 29 | 29 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 28 | Site No. 30 | Site No. 36 | 9M Wide Road |
| 30 | 30 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 29 | Site No. 31 | Site No. 35 | 9M Wide Road |
| 31 | 31 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 30 | Site No. 32 | Site No. 34 | 9M Wide Road |
| 32 | 32 | Odd | 6.28mX12.19m | 6.28*12.19 | Phase 1 | Completed | 6.78 | 5.78 | 12.19 | 12.23 | Site No. 31 | 9M Wide Road | Site No. 33 | 9M Wide Road |
| 33 | 33 | Odd | 5.28mX12.19m | 5.28*12.19 | Phase 1 | Completed | 5.78 | 4.78 | 12.19 | 12.23 | Site No. 34 | 9M Wide Road | 9M Wide Road | Site No. 32 |
| 34 | 34 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 35 | Site No. 33 | 9M Wide Road | Site No. 31 |
| 35 | 35 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 36 | Site No. 34 | 9M Wide Road | Site No. 30 |
| 36 | 36 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 37 | Site No. 35 | 9M Wide Road | Site No. 29 |
| 37 | 37 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 38 | Site No. 36 | 9M Wide Road | Site No. 28 |
| 38 | 38 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 39 | Site No. 37 | 9M Wide Road | Site No. 27 |
| 39 | 39 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 40 | Site No. 38 | 9M Wide Road | Site No. 26 |
| 40 | 40 | Odd | 7.62mX12.19m | 7.62*12.19 | Phase 1 | Completed | 7.62 | 7.62 | 12.19 | 12.19 | Site No. 41 | Site No. 39 | 9M Wide Road | Site No. 25 |
| 41 | 41 | Odd | 7.62mX12.19m | 7.62*12.19 | Phase 1 | Completed | 7.62 | 7.62 | 12.19 | 12.19 | Site No. 42 | Site No. 40 | 9M Wide Road | Site No. 24 & 25 |
| 42 | 42 | Odd | 8.28mX12.19m | 8.28*12.19 | Phase 1 | Completed | 10.14 | 6.42 | 12.74 | 12.19 | Sy.no. 46 | Site No. 41 | 9M Wide Road | Site No. 23 & 24 |
| 43 | 43 | Odd | 8.96mX12.19m | 8.96*12.19 | Phase 1 | Completed | 10.82 | 7.1 | 12.74 | 12.19 | Sy.no. 46 | Site No. 44 | Site No. 58 | 9M Wide Road |
| 44 | 44 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 43 | Site No. 45 | Site No. 57 & 58 | 9M Wide Road |
| 45 | 45 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 44 | Site No. 46 | Site No. 56 & 57 | 9M Wide Road |
| 46 | 46 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 45 | Site No. 47 | Site No. 55 | 9M Wide Road |
| 47 | 47 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 46 | Site No. 48 | Site No. 54 | 9M Wide Road |
| 48 | 48 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 47 | Site No. 49 | Site No. 53 | 9M Wide Road |
| 49 | 49 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 48 | Site No. 50 | Site No. 52 | 9M Wide Road |
| 50 | 50 | Odd | 11.64mX12.19m | 11.64*12.19 | Phase 1 | Completed | 12.14 | 11.14 | 12.19 | 12.23 | Site No. 49 | 9M Wide Road | Site No. 51 | 9M Wide Road |
| 51 | 51 | Odd | 10.65mX12.19m | 10.65*12.19 | Phase 1 | Completed | 11.14 | 10.15 | 12.19 | 12.23 | Site No. 52 | 9M Wide Road | 9M Wide Road | Site No. 50 |
| 52 | 52 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 53 | Site No. 51 | 9M Wide Road | Site No. 49 |
| 53 | 53 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 54 | Site No. 52 | 9M Wide Road | Site No. 48 |
| 54 | 54 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 55 | Site No. 53 | 9M Wide Road | Site No. 47 |
| 55 | 55 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 56 | Site No. 54 | 9M Wide Road | Site No. 46 |
| 56 | 56 | Odd | 7.62mX12.19m | 7.62*12.19 | Phase 1 | Completed | 7.62 | 7.62 | 12.19 | 12.19 | Site No. 57 | Site No. 55 | 9M Wide Road | Site No. 45 |
| 57 | 57 | Odd | 7.62mX12.19m | 7.62*12.19 | Phase 1 | Completed | 7.62 | 7.62 | 12.19 | 12.19 | Site No. 58 | Site No. 56 | 9M Wide Road | Site No. 44 & 45 |
| 58 | 58 | Odd | 8.28mX12.19m | 8.28*12.19 | Phase 1 | Completed | 10.14 | 6.42 | 12.74 | 12.19 | Sy No. 46 | Site No. 57 | 9M Wide Road | Site No. 43 & 44 |
| 59 | 59 | Odd | 8.96mX12.19m | 8.96*12.19 | Phase 1 | Completed | 10.82 | 7.1 | 12.74 | 12.19 | Sy No. 46 | Site No. 60 | Site No. 72 | 9M Wide Road |
| 60 | 60 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 59 | Site No. 61 | Site No. 71 & 72 | 9M Wide Road |
| 61 | 61 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 60 | Site No. 62 | Site No. 70 & 71 | 9M Wide Road |
| 62 | 62 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 61 | Site No. 63 | Site No. 69 | 9M Wide Road |
| 63 | 63 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 62 | Site No. 64 | Site No. 68 | 9M Wide Road |
| 64 | 64 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 63 | Site No. 65 | Site No. 67 | 9M Wide Road |
| 65 | 65 | Odd | 7.87mX12.19m | 7.87*12.19 | Phase 1 | Completed | 8.37 | 7.37 | 12.19 | 12.23 | Site No. 64 | 9M Wide Road | Site No. 66 | 9M Wide Road |
| 66 | 66 | Odd | 6.87mX12.19m | 6.87*12.19 | Phase 1 | Completed | 7.37 | 6.37 | 12.19 | 12.23 | Site No. 67 | 9M Wide Road | 9M Wide Road | Site No. 65 |
| 67 | 67 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 68 | Site No. 66 | 9M Wide Road | Site No. 64 |
| 68 | 68 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 69 | Site No. 67 | 9M Wide Road | Site No. 63 |
| 69 | 69 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 70 | Site No. 68 | 9M Wide Road | Site No. 62 |
| 70 | 70 | Odd | 7.62mX12.19m | 7.62*12.19 | Phase 1 | Completed | 7.62 | 7.62 | 12.19 | 12.19 | Site No. 71 | Site No. 69 | 9M Wide Road | Site No. 61 |
| 71 | 71 | Odd | 7.62mX12.19m | 7.62*12.19 | Phase 1 | Completed | 7.62 | 7.62 | 12.19 | 12.19 | Site No. 72 | Site No. 70 | 9M Wide Road | Site No. 60 & 61 |
| 72 | 72 | Odd | 8.28mX12.19m | 8.28*12.19 | Phase 1 | Completed | 10.14 | 6.42 | 12.74 | 12.19 | Sy No. 46 | Site No. 71 | 9M Wide Road | Site No. 59 & 60 |
| 73 | 73 | Odd | 8.96mX12.19m | 8.96*12.19 | Phase 1 | Completed | 10.82 | 7.1 | 12.74 | 12.19 | Sy No. 46 | Site No. 74 | Site No. 83 | 9M Wide Road |
| 74 | 74 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 73 | Site No. 75 | Site No. 82 & 83 | 9M Wide Road |
| 75 | 75 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 74 | Site No. 76 | Site No. 81 & 82 | 9M Wide Road |
| 76 | 76 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 75 | Site No. 77 & 78 | Site No. 80 | 9M Wide Road |
| 77 | 77 | Odd | 13.42mX7.62m | 13.42*7.62 | Phase 1 | Completed | 13.73 | 13.11 | 7.62 | 7.65 | Site No. 76 | 9M Wide Road | Site No. 88 | 9M Wide Road |
| 78 | 78 | Odd | 12.80mX7.62m | 12.8*7.62 | Phase 1 | Completed | 13.11 | 12.48 | 7.62 | 7.65 | Site No. 76 & 80 | 9M Wide Road | Site No. 79 | Site No. 77 |
| 79 | 79 | Odd | 12.11mX9.14m | 12.11*9.14 | Phase 1 | Completed | 12.48 | 11.74 | 9.14 | 9.17 | Site No. 80 | 9M Wide Road | 9M Wide Road | Site No. 78 |
| 80 | 80 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 81 | Site No. 78 & 79 | 9M Wide Road | Site No. 80 |
| 81 | 81 | Odd | 7.62mX12.19m | 7.62*12.19 | Phase 1 | Completed | 7.62 | 7.62 | 12.19 | 12.19 | Site No. 82 | Site No. 80 | 9M Wide Road | Site No. 75 |
| 82 | 82 | Odd | 7.62mX12.19m | 7.62*12.19 | Phase 1 | Completed | 7.62 | 7.62 | 12.19 | 12.19 | Site No. 83 | Site No. 81 | 9M Wide Road | Site No. 74 & 75 |
| 83 | 83 | Odd | 8.28mX12.19m | 8.28*12.19 | Phase 1 | Completed | 10.14 | 6.42 | 12.74 | 12.19 | Sy No. 46 | Site No. 82 | 9M Wide Road | Site No. 73 & 74 |
| 84 | 84 | Odd | 9.15mX12.19m | 9.15*12.19 | Phase 1 | Completed | 11.01 | 7.29 | 12.74 | 12.19 | Sy No. 46 | Site No. 85 | CA Site | 9M Wide Road |
| 85 | 85 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 84 | Site No. 86 | CA Site | 9M Wide Road |
| 86 | 86 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | Site No. 85 | Site No. 87 | CA Site | 9M Wide Road |
| 87 | 87 | Odd | 9.27mX12.19m | 9.27*12.19 | Phase 1 | Completed | 9.77 | 8.77 | 12.19 | 12.23 | Site No. 86 | 9M Wide Road | CA Site | 9M Wide Road |
| 88 | 88 | Odd | 16.47mX7.62m | 16.47*7.62 | Phase 1 | Completed | 18 | 14.94 | 8.29 | 7.62 | Sy No. 46 | 9M Wide Road | Site No. 89 | CA Site |
| 89 | 89 | Odd | 13.41mX7.62m | 13.41*7.62 | Phase 1 | Completed | 14.94 | 11.88 | 8.29 | 7.62 | Sy No. 46 | 9M Wide Road | Site No. 90 | Site No. 88 |
| 90 | 90 | Odd | 10.31mX7.62m | 10.31*7.62 | Phase 1 | Completed | 11.88 | 8.73 | 8.54 | 7.86 | Sy No. 46 | 9M Wide Road | 3M Pathway | Site No. 89 |
| 91 | 91 | Odd | 7.94mX12.19m | 7.94*12.19 | Phase 1 | Completed | 12.19 | 12.13 | 7.94 | 7.94 | 9M Wide Road | Sy No. 72 | 3M Pathway | Site No. 92 |
| 92 | 92 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 91 | Site No. 93 |
| 93 | 93 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 92 | Site No. 94 |
| 94 | 94 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 93 | Site No. 95 |
| 95 | 95 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 94 | Site No. 96 |
| 96 | 96 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 95 | Site No. 97 |
| 97 | 97 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 96 | Site No. 98 |
| 98 | 98 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 97 | Site No. 99 |
| 99 | 99 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 98 | Site No. 100 |
| 100 | 100 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 99 | Site No. 101 |
| 101 | 101 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 100 | 9M Wide Road |
| 102 | 102 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | 9M Wide Road | Site No. 103 |
| 103 | 103 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 102 | Site No. 104 |
| 104 | 104 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 103 | Site No. 105 |
| 105 | 105 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 104 | Site No. 106 |
| 106 | 106 | Standard | 9.14mX12.19m | 9.14*12.19 | Phase 1 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | 9M Wide Road | Sy No. 72 | Site No. 105 | Site No. 107 & 108 |
| 107 | 107 | Odd | 6.09mX12.19m | 6.09*12.19 | Phase 1 | Completed | 6.09 | 6.09 | 12.19 | 12.19 | 9M Wide Road | Site No. 108 | Site No. 106 | 9M Wide Road |
| 108 | 108 | Odd | 6.09mX12.19m | 6.09*12.19 | Phase 1 | Completed | 6.09 | 6.09 | 12.19 | 12.19 | Site No. 107 | Sy No. 72 | Site No. 106 | 9M Wide Road |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 15-06-2016 | 22-03-2017 |
| 2 | Formation Of Road, Footpath | Yes | 02-08-2016 | 15-05-2017 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 10-08-2016 | 04-04-2017 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 25-06-2016 | 05-05-2017 |
| 5 | Power Supply Work(Tansformer And Substation) | Yes | 25-06-2016 | 10-05-2017 |
| 6 | Construction Of Storm Water Drainage | Yes | 25-06-2016 | 20-05-2017 |
| 7 | Solid Waste Management and Disposal | No | ||
| 8 | Tree Plantation And LandScape Work | Yes | 05-07-2016 | 24-04-2017 |
| 9 | Street Lighting | Yes | 20-07-2016 | 10-05-2017 |
| 10 | Other Miscellaneous Work | No |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning and incarnation | No |
| WebSite Link 1 | www.earthenhues.net |
| Total number of Plots | 108 |
| No. of Public and Semi Pubic Sites | 1 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 1121 |
| No. of Parks and Open Spaces | 5 |
| Area of Parks and Open Spaces(in Sq.m) | 2252 |
| Area of Road/Transportation(in Sq.m) | 7295 |
| Name | Registered conveyance deed for an individual unit |
| Approval Date | 27-12-2017 |
| Appeals / FNH | NO APPEALS / FNH |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |


Ask Pulse Ai anything about real estate
News, Infographics, Blogs & More! Delivered to your inbox.