SHREE DEVELOPERS
Anekal
Approved
31st Jan 2023
Completed
31st Dec 2024
Registration No.
PRM/KA/RERA/1251/308/PR/310123/005672
Acknowledgement No.
ACK/KA/RERA/1251/308/PR/100123/006717
Project Type
Plotted Development
District
Bengaluru Urban
Taluka
Anekal
State
Karnataka
| Number of Survey No./CMC No./CTS No./PID No. | 13 |
| Is there any Litigations on Land/Property/Khatha? | NO |
| Type of Firm | Partnership Firm |
| Promoter Name | SHREE DEVELOPERS |
| Main Objectives | Real Estate Development, Sales and Marketing |
| Registration Number | BSD-F449-2019-20 |
| PAN | AIXPV7346K |
| GSTIN | NA |
| Promoter Address | No 41, Sri Rama Layout, Ward No 9, Chandapura Main Road,,Anekal ,Anekal ,Bengaluru Urban-562106 |
| District | Bengaluru Urban |
| Taluk | Anekal |
| PIN Code | 562106 |
| Name of Authorized Signatory | C Venkatesh |
| Number of Partners | 2 |
| Is there any RERA Registrations in other State / UT ? | NO |
| Is there any Projects Launched In The Past 5 Years in Karnataka ? | NO |
| Present Address | No 107, Kavalahosahalli Village, Janatha Colony, Sidihosakote Post, Anekal Taluk , Bengaluru Urban , Karnataka - 562106 |
| Permanent Address | No 107, Kavalahosahalli Village, Janatha Colony, Sidihosakote Post, Anekal Taluk , Bengaluru Urban , Karnataka - 562106 |
| Official Address | No 41, Sri Rama Layout, Ward No 9, Chandapura Main Road, Anekal , Bengaluru Urban , Karnataka - 562106 |
| Sl No. | |
| Sl No._1 | |
| Sl No._2 |
| Type of Inventory | 9.14X12.19 |
| No of Inventory | 32 |
| Carpet Area (Sq Mtr) | 3567 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | Residential | Odd | 141.08 | Not Started | Phase 3 | 14.34 | 12.19 | 7.8 | 15.34 | 9.0M ROAD | SITE NO.2 | SITE NO.5 | 9.0M ROAD |
| 2 | 2 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.1 | SITE NO.3 | SITE NO.5 | 9.0M ROAD |
| 3 | 3 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.2 | SITE NO.4 | SITE NO.6 | 9.0M ROAD |
| 4 | 4 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.3 | SITE NO.8 | SITE NO.7 | 9.0M ROAD |
| 5 | 5 | Residential | Odd | 186.55 | Not Started | Phase 3 | 17.93 | 15.24 | 7.53 | 16.95 | 9.0M ROAD | SITE NO.6 | 9.0M ROAD | SITE NO.1,2 |
| 6 | 6 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.5 | SITE NO.7 | 9.0M ROAD | SITE NO.3 |
| 7 | 7 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.6 | SITE NO.8 | 9.0M ROAD | SITE NO.4 |
| 8 | 8 | Residential | Odd | 236.77 | Not Started | Phase 3 | 27.43 | 23.78 | 9.14 | 9.85 | SITE NO.7 | SITE NO.9 | 9.0M ROAD | private property |
| 9 | 9 | Residential | Odd | 203.05 | Not Started | Phase 3 | 23.78 | 20.53 | 9.14 | 9.75 | SITE NO.8 | SITE NO.10 | 9.0M ROAD | private property |
| 10 | 10 | Residential | Odd | 172.94 | Not Started | Phase 3 | 20.53 | 17.29 | 9.14 | 9.7 | SITE NO.9 | SITE NO.11 | 9.0M ROAD | private property |
| 11 | 11 | Residential | Odd | 143.17 | Not Started | Phase 3 | 17.29 | 14.07 | 9.14 | 9.67 | SITE NO.10 | 9.0m road | 9.0M ROAD | private property |
| 12 | 12 | Residential | Odd | 150.27 | Not Started | Phase 3 | 10.86 | 0 | 29.7 | 31.64 | 9.0M ROAD | SITE NO.13 | 9.0M ROAD | private property |
| 13 | 13 | Residential | Odd | 90.14 | Not Started | Phase 3 | 12.19 | 7.4 | 9.14 | 10.3 | SITE NO.15 | SITE NO.35 | SITE NO.34 | 9.0M ROAD |
| 14 | 14 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.16 | SITE NO.14 | SITE NO.33 | 9.0M ROAD |
| 15 | 15 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.17 | SITE NO.15 | SITE NO.32 | 9.0M ROAD |
| 16 | 16 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | 9.0M ROAD | SITE NO.16 | SITE NO.31 | 9.0M ROAD |
| 17 | 17 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.19 | 9.0m road | SITE NO.30 | 9.0M ROAD |
| 18 | 18 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.20 | SITE NO.18 | SITE NO.29 | 9.0M ROAD |
| 19 | 19 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.21 | SITE NO.19 | SITE NO.28 | 9.0M ROAD |
| 20 | 20 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.22 | SITE NO.20 | SITE NO.27 | 9.0M ROAD |
| 21 | 21 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.23 | SITE NO.21 | SITE NO.26 | 9.0M ROAD |
| 22 | 22 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.24 | SITE NO.22 | SITE NO.25 | 9.0M ROAD |
| 23 | 23 | Residential | Odd | 130.06 | Not Started | Phase 3 | 13.92 | 12.19 | 7.32 | 14.02 | private property | SITE NO.23 | SITE NO.25 | 9.0M ROAD |
| 24 | 24 | Residential | Odd | 169.77 | Not Started | Phase 3 | 13.92 | 12.19 | 10.58 | 17.19 | private property | SITE NO.26 | 9.0M ROAD | SITE NO.23,24 |
| 25 | 25 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.25 | SITE NO.27 | 9.0M ROAD | SITE NO.22 |
| 26 | 26 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.26 | SITE NO.28 | 9.0M ROAD | SITE NO.21 |
| 27 | 27 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.27 | SITE NO.29 | 9.0M ROAD | SITE NO.20 |
| 28 | 28 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.28 | SITE NO.30 | 9.0M ROAD | SITE NO.19 |
| 29 | 29 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.29 | 9.0M ROAD | 9.0M ROAD | SITE NO.18 |
| 30 | 30 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | 9.0M ROAD | SITE NO.32 | 9.0M ROAD | SITE NO.17 |
| 31 | 31 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.31 | SITE NO.33 | 9.0M ROAD | SITE NO.16 |
| 32 | 32 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.32 | SITE NO.34 | 9.0M ROAD | SITE NO.15 |
| 33 | 33 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.33 | SITE NO.35 | 9.0M ROAD | SITE NO.14 |
| 34 | 34 | Residential | Odd | 211.66 | Not Started | Phase 3 | 19.59 | 13.05 | 12.93 | 14.49 | SITE NO.34 | C.A | 9.0M ROAD | 9.0M ROAD |
| 35 | 35 | Residential | Odd | 157.54 | Not Started | Phase 3 | 12.19 | 12.19 | 12.93 | 12.92 | SITE NO.37 | C.A | SITE NO.52 | 9.0M ROAD |
| 36 | 36 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.38 | SITE NO.36 | SITE NO.51 | 9.0M ROAD |
| 37 | 37 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.39 | SITE NO.37 | SITE NO.50 | 9.0M ROAD |
| 38 | 38 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.40 | SITE NO.38 | SITE NO.49 | 9.0M ROAD |
| 39 | 39 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | 9.0M ROAD | SITE NO.39 | SITE NO.48 | 9.0M ROAD |
| 40 | 40 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 9.14 | 9.14 | 12.19 | 12.19 | SITE NO.42 | 9.0m road | SITE NO.46 | 9.0M ROAD |
| 41 | 41 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.43 | SITE NO.41 | SITE NO.45 | 9.0M ROAD |
| 42 | 42 | Residential | Odd | 139.83 | Not Started | Phase 3 | 12.38 | 18.16 | 10.82 | 9.14 | SITE NO.44 | SITE NO.42 | 12.0M ROAD | 9.0M ROAD |
| 43 | 43 | Residential | Odd | 122.27 | Not Started | Phase 3 | 0 | 12.38 | 23.3 | 19.7 | private property | SITE NO.43 | 12.0M ROAD | 9.0M ROAD |
| 44 | 44 | Residential | Odd | 81.04 | Not Started | Phase 3 | 5.98 | 11.74 | 10.82 | 9.14 | SITE NO.43 | SITE NO.46,47 | 12.0M ROAD | SITE NO.42 |
| 45 | 45 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 9.14 | 9.14 | 12.19 | 12.19 | SITE NO.45,42 | 9.0m road | SITE NO.47 | SITE NO.41 |
| 46 | 46 | Residential | Odd | 85.63 | Not Started | Phase 3 | 5.65 | 7.18 | 12.63 | 12.19 | SITE NO.45 | 9.0m road | 12.0M ROAD | SITE NO.46 |
| 47 | 47 | Residential | 9.14Mx9.14M | 83.65 | Not Started | Phase 3 | 9.14 | 9.14 | 9.14 | 9.14 | 9.0m road | SITE NO.49 | 12.0M ROAD | SITE NO.40 |
| 48 | 48 | Residential | 9.14Mx9.14M | 83.65 | Not Started | Phase 3 | 9.14 | 9.14 | 9.14 | 9.14 | SITE NO.48 | SITE NO.50 | 12.0M ROAD | SITE NO.39 |
| 49 | 49 | Residential | 9.14Mx9.14M | 83.65 | Not Started | Phase 3 | 9.14 | 9.14 | 9.14 | 9.14 | SITE NO.49 | SITE NO.51 | 12.0M ROAD | SITE NO.38 |
| 50 | 50 | Residential | 9.14Mx9.14M | 83.65 | Not Started | Phase 3 | 9.14 | 9.14 | 9.14 | 9.14 | SITE NO.50 | SITE NO.52 | 12.0M ROAD | SITE NO.37 |
| 51 | 51 | Residential | Odd | 118.69 | Not Started | Phase 3 | 9.14 | 9.14 | 12.92 | 12.92 | SITE NO.51 | C.A | 12.0M ROAD | SITE NO.36 |
| 52 | 52 | Residential | Odd | 156.54 | Not Started | Phase 3 | 12.19 | 12.19 | 12.93 | 12.93 | SITE NO.54 | C.A | PRIVATE PROPERTY | 12.0M ROAD |
| 53 | 53 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.55 | SITE NO.54 | PRIVATE PROPERTY | 12.0M ROAD |
| 54 | 54 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.56 | SITE NO.55 | PRIVATE PROPERTY | 12.0M ROAD |
| 55 | 55 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | SITE NO.57 | SITE NO.56 | PRIVATE PROPERTY | 12.0M ROAD |
| 56 | 56 | Residential | 9.14Mx12.19M | 111.48 | Not Started | Phase 3 | 12.19 | 12.19 | 9.14 | 9.14 | 9.0m road | SITE NO.57 | PRIVATE PROPERTY | 12.0M ROAD |
| 57 | 57 | Residential | Odd | 156.59 | Not Started | Phase 3 | 14.95 | 0 | 18.94 | 23.01 | SITE NO.59 | 12.0M ROAD | PRIVATE PROPERTY | 12.0M ROAD |
| 58 | 58 | Residential | Odd | 118.55 | Not Started | Phase 3 | 26.93 | 14.95 | 0 | 17.02 | private property | PRIVATE PROPERTY | PRIVATE PROPERTY | 12.0M ROAD |
| 59 | 59 | Residential | Odd | 97.79 | Not Started | Phase 3 | 2.79 | 10.81 | 16.59 | 11.64 | 9.0m road | SITE NO.60 | 3M PATHWAY | 9.0m road |
| 60 | 60 | Residential | Odd | 114.8 | Not Started | Phase 3 | 10.81 | 14.3 | 9.79 | 9.14 | SITE NO.59 | SITE NO.61 | 3M PATHWAY | 9.0m road |
| 61 | 61 | Residential | Odd | 138.2 | Not Started | Phase 3 | 14.3 | 15.24 | 9.19 | 9.14 | SITE NO.60 | SITE NO.62 | 3M PATHWAY | 9.0m road |
| 62 | 62 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.61 | SITE NO.63 | 3M PATHWAY | 9.0m road |
| 63 | 63 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.62 | SITE NO.64 | 3M PATHWAY | 9.0m road |
| 64 | 64 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.63 | SITE NO.65 | 3M PATHWAY | 9.0m road |
| 65 | 65 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.64 | SITE NO.66 | 3M PATHWAY | 9.0m road |
| 66 | 66 | Residential | Odd | 178.2 | Not Started | Phase 3 | 15.24 | 15.4 | 10.59 | 12.79 | SITE NO.65 | PRIVATE PROPERTY | 3M PATHWAY | 9.0m road |
| 67 | 67 | Residential | Odd | 115.44 | Not Started | Phase 3 | 15.24 | 15.4 | 8.68 | 6.47 | SITE NO.68 | PRIVATE PROPERTY | 9.0m road | SITE NO.84 |
| 68 | 68 | Residential | Odd | 116.13 | Not Started | Phase 3 | 15.24 | 15.24 | 7.62 | 7.62 | SITE NO.69 | SITE NO.67 | 9.0m road | SITE NO.83 |
| 69 | 69 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.70 | SITE NO.68 | 9.0m road | SITE NO.82 |
| 70 | 70 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.71 | SITE NO.69 | 9.0m road | SITE NO.81 |
| 71 | 71 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.72 | SITE NO.70 | 9.0m road | SITE NO.80 |
| 72 | 72 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | 9.0m road | SITE NO.71 | 9.0m road | SITE NO.79 |
| 73 | 73 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.74 | 9.0m road | 9.0m road | SITE NO.78 |
| 74 | 74 | Residential | Odd | 116.13 | Not Started | Phase 3 | 15.24 | 15.24 | 7.62 | 7.62 | SITE NO.75 | SITE NO.73 | 9.0m road | SITE NO.77 |
| 75 | 75 | Residential | Odd | 116.13 | Not Started | Phase 3 | 15.24 | 15.24 | 7.62 | 7.62 | 3m pathway | SITE NO.74 | 9.0m road | SITE NO.76 |
| 76 | 76 | Residential | Odd | 116.13 | Not Started | Phase 3 | 15.24 | 15.24 | 7.62 | 7.62 | 3m pathway | SITE NO.77 | SITE NO.75 | 9.0m road |
| 77 | 77 | Residential | Odd | 116.13 | Not Started | Phase 3 | 15.24 | 15.24 | 7.62 | 7.62 | SITE NO.76 | SITE NO.78 | SITE NO.74 | 9.0m road |
| 78 | 78 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.77 | 9.0m road | SITE NO.73 | 9.0m road |
| 79 | 79 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | 9.0m road | SITE NO.80 | SITE NO.72 | 9.0m road |
| 80 | 80 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.79 | SITE NO.81 | SITE NO.71 | 9.0m road |
| 81 | 81 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.80 | SITE NO.82 | SITE NO.70 | 9.0m road |
| 82 | 82 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.81 | SITE NO.83 | SITE NO.69 | 9.0m road |
| 83 | 83 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.82 | SITE NO.84 | SITE NO.68 | 9.0m road |
| 84 | 84 | Residential | Odd | 125.1 | Not Started | Phase 3 | 15.24 | 15.34 | 7.15 | 8.92 | SITE NO.83 | PRIVATE PROPERTY | SITE NO.67 | 9.0m road |
| 85 | 85 | Residential | Odd | 136 | Not Started | Phase 3 | 15.24 | 15.24 | 9 | 8.93 | SITE NO.86 | PRIVATE PROPERTY | 9.0m road | SITE NO.99 |
| 86 | 86 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.87 | SITE NO.85 | 9.0m road | SITE NO.98 |
| 87 | 87 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.88 | SITE NO.86 | 9.0m road | SITE NO.97 |
| 88 | 88 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.89 | SITE NO.87 | 9.0m road | SITE NO.96 |
| 89 | 89 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.90 | SITE NO.88 | 9.0m road | SITE NO.95 |
| 90 | 90 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | 9.0M ROAD | SITE NO.89 | 9.0m road | SITE NO.94 |
| 91 | 91 | Residential | Odd | 132.8 | Not Started | Phase 3 | 15.11 | 13.94 | 9.14 | 9.22 | SITE NO.92 | 9.0m road | 9.0m road | PRIVATE PROPERTY |
| 92 | 92 | Residential | Odd | 143.55 | Not Started | Phase 3 | 16.29 | 15.11 | 9.14 | 9.22 | SITE NO.93 | SITE NO.91 | 9.0m road | PRIVATE PROPERTY |
| 93 | 93 | Residential | Odd | 154.31 | Not Started | Phase 3 | 17.46 | 16.29 | 9.14 | 9.22 | SITE NO.94 | SITE NO.92 | 9.0m road | PRIVATE PROPERTY |
| 94 | 94 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | 9.0M ROAD | SITE NO.95 | SITE NO.90 | 9.0m road |
| 95 | 95 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.94 | SITE NO.96 | SITE NO.89 | 9.0m road |
| 96 | 96 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.95 | SITE NO.97 | SITE NO.88 | 9.0m road |
| 97 | 97 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.96 | SITE NO.98 | SITE NO.87 | 9.0m road |
| 98 | 98 | Residential | 9.14Mx15.24M | 139.35 | Not Started | Phase 3 | 15.24 | 15.24 | 9.14 | 9.14 | SITE NO.97 | SITE NO.99 | SITE NO.86 | 9.0m road |
| 99 | 99 | Residential | Odd | 136.11 | Not Started | Phase 3 | 15.24 | 15.24 | 8.93 | 8.93 | SITE NO.98 | PRIVATE PROPERTY | SITE NO.85 | 9.0m road |
| 100 | 100 | Residential | Odd | 117.21 | Not Started | Phase 3 | 9.38 | 3.59 | 18.15 | 18.99 | SITE NO.101 | PRIVATE PROPERTY | 9.0m road | PRIVATE PROPERTY |
| 101 | 101 | Residential | Odd | 99.15 | Not Started | Phase 3 | 12.31 | 9.38 | 9.14 | 9.6 | SITE NO.102 | SITE NO.100 | 9.0m road | PRIVATE PROPERTY |
| 102 | 102 | Residential | Odd | 125.94 | Not Started | Phase 3 | 15.24 | 12.31 | 9.14 | 9.6 | SITE NO.103 | SITE NO.101 | 9.0m road | PRIVATE PROPERTY |
| 103 | 103 | Residential | Odd | 149.69 | Not Started | Phase 3 | 17.4 | 15.24 | 9.14 | 9.4 | SITE NO.104,105 | SITE NO.102 | 9.0m road | PRIVATE PROPERTY |
| 104 | 104 | Residential | Odd | 97.66 | Not Started | Phase 3 | 10.68 | 10.68 | 9.14 | 9.14 | 9.0m road | SITE NO.103 | 9.0m road | PRIVATE PROPERTY |
| 105 | 105 | Residential | Odd | 70.85 | Not Started | Phase 3 | 8.77 | 6.72 | 9.14 | 9.37 | 9.0m road | SITE NO.103 | 9.0m road | PRIVATE PROPERTY |
| 106 | 106 | Residential | Odd | 140 | Not Started | Phase 3 | 10 | 10 | 14.61 | 13.86 | 3m pathway | 9.0m road | 3M PATHWAY | PRIVATE PROPERTY |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 01-01-2023 | 30-06-2023 |
| 2 | Formation Of Road, Footpath | Yes | 01-04-2023 | 30-08-2023 |
| 3 | Construction Of Water Supply Infrastucture | Yes | 01-05-2023 | 30-09-2023 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 01-06-2023 | 30-10-2023 |
| 5 | Power Supply Work(Transformer & Substation) | Yes | 01-11-2023 | 30-03-2024 |
| 6 | Construction Of Storm Water Drainage | Yes | 01-01-2024 | 30-06-2024 |
| 7 | Solid Waste Management and Disposal | No | ||
| 8 | Tree Plantation And LandScape Work | Yes | 01-01-2024 | 31-12-2024 |
| 9 | Street Lighting | Yes | 01-06-2024 | 31-12-2024 |
| 10 | Sewage Treatment Plant (STP) | Yes | 01-08-2024 | 31-12-2024 |
| 11 | Other Miscellaneous Work | No |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Piped Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning | No |
| Total number of Plots | 106 |
| No. of Public and Semi Pubic Sites | 1 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 1283 |
| No. of Parks and Open Spaces | 4 |
| Area of Parks and Open Spaces(in Sq.m) | 2605 |
| Area of Road/Transportation(in Sq.m) | 8217 |
| Project Start Date | 01-01-2023 |
| Project End Date | 31-12-2024 |
| If any extension of time has been granted | NO |
| Cost of land | 37950000 |
| Cost of construction | 31415800 |
| Total cost | 69365800 |
| Total amount collected From buyers | 0 |
| Whether any loan has been raised | NO |
| Total amount spent on Project for completion of the project | 11372170 |
| Total No of sites of Project | 106 |
| Total No of sites sold | 0 |
| Total No of sites unsold | 106 |
| Whether there is any changes in inventory details | NO |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |


Ask Pulse Ai anything about real estate