ADI LINGESWARA LAYOUT
M R CHITHRA
Gundlupet
Approved
18th Dec 2023
Pending
31st Mar 2030
Registration No.
PRM/KA/RERA/1253/286/PR/181223/006502
Acknowledgement No.
ACK/KA/RERA/1253/286/PR/031223/007643
Project Type
Plotted Development
District
Chamarajanagar
Taluka
Gundlupet
State
Karnataka
Project Details
| Number of Survey No./CMC No./CTS No./PID No. | 4 |
| Is there any Litigations on Land/Property/Khatha? | NO |
Promoter Details
| Type of Firm | Proprietorship |
| Promoter Name | M R CHITHRA |
| Main Objectives | DEVELOPING RESIDENTIAL LAYOUTS AND OTHER CONSTRUCTION ACTIVITIES |
| Trade Name | M R CHITHRA |
| Registration Number | NA |
| PAN | AEJPC5575P |
| Promoter Address | W/O S LINGESH KUMAR, BYRASETTIHALLI VILLAGE,SINGARAJIPURA ,Channapatna ,Ramanagara-562138 |
| District | Ramanagara |
| Taluk | Channapatna |
| PIN Code | 562138 |
| Name of Authorized Signatory | M R CHITHRA |
| Is there any RERA Registrations in other State / UT ? | NO |
| Is there any Projects Launched In The Past 5 Years in Karnataka ? | NO |
| Present Address | W/O S LINGESH KUMAR, BYRASETTIHALLI VILLAGE, SINGARAJIPURA, CHANNAPATNA , Ramanagara , Karnataka - 562138 |
| Permanent Address | W/O S LINGESH KUMAR, BYRASETTIHALLI VILLAGE, SINGARAJIPURA, CHANNAPATNA , Ramanagara , Karnataka - 562138 |
| Official Address | W/O S LINGESH KUMAR, BYRASETTIHALLI VILLAGE, SINGARAJIPURA, CHANNAPATNA , Ramanagara , Karnataka - 562138 |
| Sl No. |
Modification Plan Details
| Type of Inventory | 12.20M X ODD |
| No of Inventory | 7 |
| Carpet Area (Sq Mtr) | 1443 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
Residential Plot Details
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | Vacant Site | ODD | 151.83 | 1 | 1 | 9.68 | 10.63 | 16.15 | 13.62 | Site No - 11 | Road | Survey No - 46/3 & 47/3 Approved Layout | Site No - 2 |
| 2 | 2 | Vacant Site | 12.20M X ODD | 202.52 | 1 | 1 | 12.2 | 12.2 | 16.15 | 17.05 | Site No - 9,10 & 11 | Road | Site No - 1 | Site No - 3 |
| 3 | 3 | Vacant Site | 12.20M X ODD | 207.89 | 1 | 1 | 12.2 | 12.2 | 17.05 | 17.03 | Site No - 9 & 8 | Road | Site No - 2 | Site No - 4 |
| 4 | 4 | Vacant Site | 12.20M X ODD | 207.64 | 1 | 1 | 12.2 | 12.2 | 17.03 | 17.01 | Site No - 7 & 8 | Road | Site No - 3 | Site No - 5 |
| 5 | 5 | Vacant Site | ODD | 181.16 | 1 | 1 | 13.54 | 7.76 | 17.01 | 17.97 | Site No - 7 & 6 | Road | Site No - 4 | Road |
| 6 | 6 | Vacant Site | ODD | 211.46 | 1 | 1 | 16.47 | 11.28 | 15.24 | 16.12 | Road | Site No - 5 | Site No - 7 | Road |
| 7 | 7 | Vacant Site | 9.14M X 15.24M | 139.29 | 1 | 1 | 9.14 | 9.14 | 15.24 | 15.24 | Road | Site No - 4 & 5 | Site No - 8 | Site No - 6 |
| 8 | 8 | Vacant Site | 9.14M X 15.24M | 139.29 | 1 | 1 | 9.14 | 9.14 | 15.24 | 15.24 | Road | Site No - 3 & 4 | Site No - 9 | Site No - 7 |
| 9 | 9 | Vacant Site | 9.14M X 15.24M | 139.29 | 1 | 1 | 9.14 | 9.14 | 15.24 | 15.24 | Road | Site No - 3 & 2 | Site No - 10 | Site No - 8 |
| 10 | 10 | Vacant Site | 9.14M X 15.24M | 139.29 | 1 | 1 | 9.14 | 9.14 | 15.24 | 15.24 | Road | Site No - 2 | Site No - 11 | Site No - 9 |
| 11 | 11 | Vacant Site | ODD | 178.61 | 1 | 1 | 11.37 | 11.98 | 15.25 | 15.24 | Road | Site No - 1 & 2 | Survey No - 46/3 & 47/3 Approved Layout | Site No - 10 |
| 12 | 12 | Vacant Site | ODD | 115.47 | 1 | 1 | 9.22 | 9.71 | 12.21 | 12.2 | Site No - 26 | Road | Road | Site No - 13 |
| 13 | 13 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Site No - 25 | Road | Site No - 12 | Site No - 14 |
| 14 | 14 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Site No - 24 | Road | Site No - 13 | Site No - 15 |
| 15 | 15 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Site No - 23 | Road | Site No - 14 | Site No - 16 |
| 16 | 16 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Site No - 22 | Road | Site No - 15 | Site No - 17 |
| 17 | 17 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Site No - 21 | Road | Site No - 16 | Site No - 18 |
| 18 | 18 | Vacant Site | ODD | 167.93 | 1 | 1 | 15.84 | 11.69 | 12.2 | 12.9 | Site No - 19 & 20 | Road | Site No - 17 | Road |
| 19 | 19 | Vacant Site | ODD | 107.06 | 1 | 1 | 10.85 | 6.7 | 12.2 | 12.9 | Road | Site No - 18 | Site No - 20 | Road |
| 20 | 20 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 18 | Site No - 21 | Site No - 19 |
| 21 | 21 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 17 | Site No - 22 | Site No - 20 |
| 22 | 22 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 16 | Site No - 23 | Site No - 21 |
| 23 | 23 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 15 | Site No - 24 | Site No - 22 |
| 24 | 24 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 14 | Site No - 25 | Site No - 23 |
| 25 | 25 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 13 | Site No - 26 | Site No - 24 |
| 26 | 26 | Vacant Site | ODD | 109.5 | 1 | 1 | 8.73 | 9.22 | 12.21 | 12.2 | Road | Site No - 12 | Road | Site No - 25 |
| 27 | 27 | Vacant Site | ODD | 62.69 | 1 | 1 | 9 | 9.01 | 7.16 | 6.77 | Site No - 28 | Road | Road | Site No - 36 |
| 28 | 28 | Vacant Site | 6.00M X 9.00M | 54 | 1 | 1 | 9 | 9 | 6 | 6 | Site No - 29 | Site No - 27 | Road | Site No - 35 & 36 |
| 29 | 29 | Vacant Site | 6.00M X 9.00M | 54 | 1 | 1 | 9 | 9 | 6 | 6 | Site No - 30 | Site No - 28 | Road | Site No - 35 |
| 30 | 30 | Vacant Site | 6.00M X 9.00M | 54 | 1 | 1 | 9 | 9 | 6 | 6 | Site No - 31 | Site No - 29 | Road | Site No - 35 & 34 |
| 31 | 31 | Vacant Site | 6.00M X 9.00M | 54 | 1 | 1 | 9 | 9 | 6 | 6 | Site No - 32 | Site No - 30 | Road | Site No - 35 & 33 |
| 32 | 32 | Vacant Site | ODD | 62.46 | 1 | 1 | 9.01 | 9 | 6.76 | 7.12 | Road | Site No - 31 | Road | Site No - 33 |
| 33 | 33 | Vacant Site | ODD | 108.64 | 1 | 1 | 12.21 | 12.2 | 8.66 | 9.15 | Road | Site No - 34 | Site No - 32 & 31 | Road |
| 34 | 34 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 12.2 | 12.2 | 9.14 | 9.14 | Site No - 33 | Site No - 35 | Site No - 30 & 31 | Road |
| 35 | 35 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 12.2 | 12.2 | 9.14 | 9.14 | Site No - 34 | Site No - 36 | Site No - 28,29 & 30 | Road |
| 36 | 36 | Vacant Site | ODD | 130.36 | 1 | 1 | 12.2 | 12.21 | 10.95 | 10.42 | Site No - 35 | Road | Site No - 28 & 27 | Road |
| 37 | 37 | Vacant Site | ODD | 151.89 | 1 | 1 | 14.85 | 10.32 | 12.2 | 12.9 | CA | Road | Site No - 38 | Road |
| 38 | 38 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | CA | Road | Site No - 39 | Site No - 37 |
| 39 | 39 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | CA | Road | Site No - 40 | Site No - 38 |
| 40 | 40 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | CA & Site No - 42 | Road | Site No - 41 | Site No - 39 |
| 41 | 41 | Vacant Site | ODD | 108.09 | 1 | 1 | 8.56 | 9.16 | 12.21 | 12.2 | Site No - 42 | Road | Road | Site No - 40 |
| 42 | 42 | Vacant Site | ODD | 97.21 | 1 | 1 | 12.85 | 12.86 | 7.85 | 7.28 | Site No - 43 | Site No - 40 & 41 | Road | CA |
| 43 | 43 | Vacant Site | ODD | 117.45 | 1 | 1 | 12.85 | 12.85 | 9.14 | 9.14 | Site No - 44 | Site No - 42 | Road | CA |
| 44 | 44 | Vacant Site | ODD | 113.92 | 1 | 1 | 12.86 | 12.85 | 8.6 | 9.13 | Road | Site No - 43 | Road | CA |
| 45 | 45 | Vacant Site | ODD | 161.7 | 1 | 1 | 10.25 | 10.86 | 15.27 | 15.37 | Survey No -165/7 | Road | Survey No - 46/3 & 47/3 Approved Layout | Site No - 46 |
| 46 | 46 | Vacant Site | ODD | 142.56 | 1 | 1 | 9 | 9.49 | 15.37 | 15.47 | Survey No -165/7 | Road | Survey No - 46/3 & 47/4 Approved Layout | Road |
| 47 | 47 | Vacant Site | ODD | 204.35 | 1 | 1 | 13.31 | 12.83 | 15.57 | 15.7 | Survey No -165/7 | Road | Road | Site No - 48 |
| 48 | 48 | Vacant Site | ODD | 188.14 | 1 | 1 | 12.26 | 11.6 | 15.7 | 15.84 | Survey No -165/7 | Road | Site No - 47 | Road |
| 49 | 49 | Vacant Site | ODD | 151.07 | 1 | 1 | 9.15 | 9.74 | 15.94 | 16.02 | Survey No -165/3, 165/4,165/5, 165/6 & 165/1 Approved Layout | Road | Road | Site No - 50 |
| 50 | 50 | Vacant Site | ODD | 145.51 | 1 | 1 | 9.14 | 9.14 | 16.02 | 15.82 | Survey No -165/3, 165/4,165/5, 165/6 & 165/1 Approved Layout | Road | Site No - 49 | Site No - 51 |
| 51 | 51 | Vacant Site | ODD | 204 | 1 | 1 | 15.5 | 10.29 | 15.82 | 15.79 | Survey No -165/3, 165/4,165/5, 165/6 & 165/1 Approved Layout | Road | Site No - 50 | Road |
| 52 | 52 | Vacant Site | ODD | 135.84 | 1 | 1 | 9.59 | 9.58 | 14.33 | 14.03 | Survey No -165/3, 165/4,165/5, 165/6 & 165/1 Approved Layout | Road | Park | Site No - 53 |
| 53 | 53 | Vacant Site | ODD | 135.93 | 1 | 1 | 9.81 | 9.8 | 14.03 | 13.71 | Survey No -165/3, 165/4,165/5, 165/6 & 165/1 Approved Layout | Road | Site No - 52 | Park |
| 54 | 54 | Vacant Site | ODD | 122.61 | 1 | 1 | 11.68 | 14.66 | 9.97 | 9.31 | Road | Site No - 55 | Park-3 | Road |
| 55 | 55 | Vacant Site | 9.14M X ODD | 147.2 | 1 | 1 | 14.66 | 17.55 | 9.14 | 9.14 | Site No - 54 | Site No - 56 | Park-3 | Road |
| 56 | 56 | Vacant Site | 9.14M X ODD | 173.66 | 1 | 1 | 17.55 | 20.45 | 9.14 | 9.14 | Site No - 55 | Site No - 58 & 57 | Park-3 | Road |
| 57 | 57 | Vacant Site | ODD | 167.03 | 1 | 1 | 10.85 | 15.29 | 13.46 | 12.78 | Site No - 56 | Road | Park-3 | Site No - 58 |
| 58 | 58 | Vacant Site | ODD | 120 | 1 | 1 | 9.6 | 9.18 | 12.78 | 12.84 | Site No - 56 | Road | Site No - 57 | Road |
| 59 | 59 | Vacant Site | ODD | 177.17 | 1 | 1 | 15.24 | 15.25 | 11.84 | 11.41 | Site No - 60 | Road | Road | Site No - 66 |
| 60 | 60 | Vacant Site | 9.14M X 15.24M | 139.29 | 1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No - 61 | Site No - 59 | Road | Site No - 65 |
| 61 | 61 | Vacant Site | 9.14M X 15.24M | 139.29 | 1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No - 62 | Site No - 60 | Road | Site No - 64 |
| 62 | 62 | Vacant Site | ODD | 159.49 | 1 | 1 | 15.24 | 15.24 | 10.28 | 10.65 | Road | Site No - 61 | Road | Site No - 63 |
| 63 | 63 | Vacant Site | ODD | 129.02 | 1 | 1 | 12.2 | 12.2 | 10.65 | 10.95 | Road | Site No - 64 | Site No - 62 | Road |
| 64 | 64 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No - 63 | Site No - 65 | Site No - 61 | Road |
| 65 | 65 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 15.24 | 15.24 | 9.14 | 9.14 | Site No - 64 | Site No - 66 | Site No - 60 | Road |
| 66 | 66 | Vacant Site | ODD | 137.13 | 1 | 1 | 12.2 | 12.2 | 11.41 | 11.07 | Site No - 65 | Road | Site No - 59 | Road |
| 67 | 67 | Vacant Site | ODD | 118.16 | 1 | 1 | 9.21 | 10.16 | 12.2 | 12.24 | Road | Site No - 82 | Site No - 68 | Survey No - 45/1 & 45/2 Approved Layout |
| 68 | 68 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 81 | Site No - 69 | Site No - 67 |
| 69 | 69 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 80 | Site No - 70 | Site No - 68 |
| 70 | 70 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 79 | Site No - 71 | Site No - 69 |
| 71 | 71 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 78 | Site No - 72 | Site No - 70 |
| 72 | 72 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 77 | Site No - 73 | Site No - 71 |
| 73 | 73 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 76 | Site No - 74 | Site No - 72 |
| 74 | 74 | Vacant Site | ODD | 132.68 | 1 | 1 | 8.8 | 12.95 | 12.9 | 12.2 | Road | Site No - 75 | Park-2 | Site No - 73 |
| 75 | 75 | Vacant Site | ODD | 183.31 | 1 | 1 | 12.95 | 17.1 | 12.9 | 12.2 | Site No - 74 | Road | Park-2 | Site No - 76 |
| 76 | 76 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Site No - 73 | Road | Site No - 75 | Site No - 77 |
| 77 | 77 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Site No - 72 | Road | Site No - 76 | Site No - 78 |
| 78 | 78 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Site No - 71 | Road | Site No - 77 | Site No - 79 |
| 79 | 79 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Site No - 70 | Road | Site No - 78 | Site No - 80 |
| 80 | 80 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Site No - 69 | Road | Site No - 79 | Site No - 81 |
| 81 | 81 | Vacant Site | 9.14M X 12.20M | 111.51 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Site No - 68 | Road | Site No - 80 | Site No - 82 |
| 82 | 82 | Vacant Site | ODD | 129.75 | 1 | 1 | 10.16 | 11.11 | 12.2 | 12.23 | Site No - 67 | Road | Site No - 81 | Survey No - 45/1 & 45/2 Approved Layout |
| 83 | 83 | Vacant Site | ODD | 182.88 | 1 | 1 | 9.11 | 14.49 | 15.24 | 7.29 | Road | Site No - 95 | Site No - 84 | Road |
| 84 | 84 | Vacant Site | 9.14M X 15.24M | 139.29 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 95 & 94 | Site No - 85 | Site No - 83 |
| 85 | 85 | Vacant Site | 9.14M X 15.24M | 139.29 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 93 & 94 | Site No - 86 | Site No - 84 |
| 86 | 86 | Vacant Site | 9.14M X 15.24M | 139.29 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 93 | Site No - 87 | Site No - 85 |
| 87 | 87 | Vacant Site | 9.14M X 15.24M | 139.29 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 93 & 92 | Site No - 88 | Site No - 86 |
| 88 | 88 | Vacant Site | 9.14M X 15.24M | 139.29 | 1 | 1 | 9.14 | 9.14 | 12.2 | 12.2 | Road | Site No - 91 & 92 | Site No - 89 | Site No - 87 |
| 89 | 89 | Vacant Site | ODD | 255.12 | 1 | 1 | 14.12 | 19.36 | 16.12 | 15.24 | Road | Site No - 91 & 90 | Park-1 | Site No - 88 |
| 90 | 90 | Vacant Site | ODD | 258.52 | 1 | 1 | 12.35 | 18.19 | 17.94 | 16.93 | Site No - 89 | Road | Park-1 | Site No - 91 |
| 91 | 91 | Vacant Site | 12.20M X ODD | 206.49 | 1 | 1 | 12.2 | 12.2 | 16.93 | 16.92 | Site No - 88 & 89 | Road | Site No - 90 | Site No - 92 |
| 92 | 92 | Vacant Site | 12.20M X ODD | 206.3 | 1 | 1 | 12.2 | 12.2 | 16.92 | 16.9 | Site No - 88 & 87 | Road | Site No - 91 | Site No - 93 |
| 93 | 93 | Vacant Site | 12.20M X ODD | 206.06 | 1 | 1 | 12.2 | 12.2 | 16.9 | 16.88 | Site No - 85,86 & 87 | Road | Site No - 92 | Site No - 94 |
| 94 | 94 | Vacant Site | 12.20M X ODD | 205.81 | 1 | 1 | 12.2 | 12.2 | 16.88 | 16.86 | Site No - 85 & 84 | Road | Site No - 93 | Site No - 95 |
| 95 | 95 | Vacant Site | ODD | 255.68 | 1 | 1 | 18.4 | 11.93 | 16.86 | 18.04 | Site No - 83 & 84 | Road | Site No - 94 | Road |
Project Development Schedule
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 29-03-2023 | 15-06-2023 |
| 2 | Formation Of Road, Footpath | Yes | 15-06-2023 | 15-12-2024 |
| 3 | Construction Of Water Supply Infrastucture | Yes | 15-12-2024 | 15-12-2025 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 15-03-2025 | 15-12-2026 |
| 5 | Power Supply Work(Transformer & Substation) | Yes | 15-06-2026 | 15-12-2027 |
| 6 | Construction Of Storm Water Drainage | Yes | 15-09-2027 | 15-12-2028 |
| 7 | Solid Waste Management and Disposal | No | ||
| 8 | Tree Plantation And LandScape Work | No | ||
| 9 | Street Lighting | Yes | 15-12-2028 | 31-03-2029 |
| 10 | Sewage Treatment Plant (STP) | Yes | 15-12-2029 | 31-03-2030 |
| 11 | Other Miscellaneous Work | Yes | 15-12-2029 | 31-03-2030 |
Amenities & Utilities Availability
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Piped Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning | No |
Post Registration Details
| Total number of Plots | 95 |
| No. of Public and Semi Pubic Sites | 1 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 1056 |
| No. of Parks and Open Spaces | 4 |
| Area of Parks and Open Spaces(in Sq.m) | 1588 |
| Area of Road/Transportation(in Sq.m) | 8050 |
Appeals & Complaints
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in