New Town
Patel Builders and Developers
Sy no-85/1,86/3, Uttambali, Kollegal Road,
Approved
25th Nov 2020
Completed
1st Oct 2022
Registration No.
PRM/KA/RERA/1253/287/PR/201125/003702
Acknowledgement No.
ACK/KA/RERA/1253/287/PR/200724/004148
Project Type
Plotted Development
Approving Authority
Chamarajanagar-Ramsamudra Urban Development Authority
District
Chamarajanagar
Taluka
Kollegal
State
Karnataka
Project Details
| Project Name | New Town |
| Project Description | New Town is the perfect homes for a family, a singleton , an investor and justanyone |
| Project Type | Plotted Development |
| Project Status | Completed |
| Project Start Date | 23-07-2020 |
| Proposed Project Completion Date | 01-10-2022 |
| Total Area Of Land (Sq Mtr) | 27689 |
| Total Coverd Area (Sq Mtr) | 13813 |
| Total Open Area (Sq Mtr) | 13876 |
| Estimated Cost of Construction (INR) | 18000000 |
| Cost of Land (INR) | 83000000 |
| Total Project Cost (INR) | 101000000 |
| Project Address | Sy no-85/1,86/3, Uttambali, Kollegal Road, |
| District | Mysore |
| Taluk | Kollegal |
| Approving Authority | Chamarajanagar-Ramsamudra Urban Development Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Type of Inventory | Plots |
| No of Inventory | 121 |
| Carpet Area (Sq Mtr) | 13813SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0SqMtr |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Self Development |
| Solid Waste Management And Disposal | Local Authority |
| Fire Fighting facility | Local Authority |
| Drinking Water Facility | Self Development |
| Emergency Evacuation Services | Local Authority |
| Use of Renewable Energy | Local Authority |
| Bank Name | Industrial Development Bank of India |
| Branch | Mysore |
| ifscCode | IBKL0001092 |
| Account No.(70% Account) | 1092102000007474 |
| State | Karnataka |
| Name | PATEL BUILDERS AMD DEVELOPERS |
| Address | Benaka Ground Floor, 5906, Opp Kodava Samaja,General Thimmaiah Road, Vijayanagar, 2nd Stage |
| Pin Code | 570017 |
| Year Of Establishment | 2020 |
| Number Of Project Completed | 1 |
Promoter Details
| Promoter Type | Other |
| Name | Ashok Patel M |
| PAN Number | ASL******* |
| Address | #3125, High Tension Road.Vijay Nagar |
| District | Mysore |
| State/UT | Karnataka |
| PIN Code | 570017 |
| Company Registration No. | 29ASLPA6889J2ZY |
| Type | Others |
| Pin Code | 570017 |
| Sl No. |
Modification Plan Details
| Type of Inventory | Plots |
| No of Inventory | 121 |
| Carpet Area (Sq Mtr) | 13813 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
Residential Plot Details
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | PLOTTED | ODD | 327.09 | NA | 2nd Stage | 23.48 | 22.41 | 14.8 | 13.74 | 45 M ROAD | 9M ROAD | SY.NO 85/3 | SITE NO 2,54 |
| 2 | 2 | PLOTTED | 12.20xODD | 143.27 | NA | 1st Stage | 12.21 | 11.28 | 12.20 | 12.20 | 45 M ROAD | SITE NO 54 | SITE NO 1 | SITE NO 3 |
| 3 | 3 | PLOTTED | 12.20xODD | 154.64 | NA | 1st Stage | 13.14 | 12.21 | 12.20 | 12.20 | 45 M ROAD | SITE NO 53,52 | SITE NO 2 | SITE NO 4 |
| 4 | 4 | PLOTTED | 12.20xODD | 163.81 | NA | 1st Stage | 13.64 | 13.14 | 12.20 | 12.20 | 45 M ROAD | SITE NO 52,51 | SITE NO 3 | SITE NO 5 |
| 5 | 5 | PLOTTED | 12.20xODD | 168.81 | NA | 1st Stage | 14.04 | 13.64 | 12.20 | 12.20 | 45 M ROAD | SITE NO 50 | SITE NO 4 | SITE NO 6 |
| 6 | 6 | PLOTTED | 12.20xODD | 173.71 | NA | 1st Stage | 14.44 | 14.04 | 12.20 | 12.20 | 45 M ROAD | SITE NO 49,48 | SITE NO 5 | SITE NO 7 |
| 7 | 7 | PLOTTED | 12.20xODD | 178.60 | NA | 2nd Stage | 14.84 | 14.44 | 12.20 | 12.20 | 45 M ROAD | SITE NO 48,47 | SITE NO 6 | SITE NO 8 |
| 8 | 8 | PLOTTED | ODD | 189.02 | NA | 2nd Stage | 15.25 | 14.84 | 12.81 | 12.32 | 45 M ROAD | SITE NO 47,46 | SITE NO 7 | 12M ROAD |
| 9 | 9 | PLOTTED | ODD | 193.36 | NA | 2nd Stage | 16.05 | 15.65 | 12.20 | 12.20 | 45 M ROAD | SITE NO 10 | 12 M ROAD | SY.NO 86/2 |
| 10 | 10 | PLOTTED | ODD | 148.84 | NA | 2nd Stage | 12.20 | 12.20 | 12.20 | 12.20 | SITE NO 9 | 9 M ROAD | 12 M ROAD | SY.NO 86/2 |
| 11 | 11 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | 9 M ROAD | SITE NO 12 | 12 M ROAD | SY.NO 86/2 |
| 12 | 12 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 11 | SITE NO 13 | 12 M ROAD | SY.NO 86/2 |
| 13 | 13 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 12 | SITE NO 14 | 12 M ROAD | SY.NO 86/2 |
| 14 | 14 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 13 | SITE NO 15 | 12 M ROAD | SY.NO 86/2 |
| 15 | 15 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 14 | SITE NO 16 | 12 M ROAD | SY.NO 86/2 |
| 16 | 16 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 15 | SITE NO 17 | 12 M ROAD | SY.NO 86/2 |
| 17 | 17 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 16 | SITE NO 18 | 12 M ROAD | SY.NO 86/2 |
| 18 | 18 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 17 | SITE NO 19 | 12 M ROAD | SY.NO 86/2 |
| 19 | 19 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 18 | SITE NO 20 | 12 M ROAD | SY.NO 86/2 |
| 20 | 20 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 19 | SITE NO 21 | 12 M ROAD | SY.NO 86/2 |
| 21 | 21 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 20 | SITE NO 22 | 12 M ROAD | SY.NO 86/2 |
| 22 | 22 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 21 | SITE NO 23 | 12 M ROAD | SY.NO 86/2 |
| 23 | 23 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 22 | SITE NO 24 | 12 M ROAD | SY.NO 86/2 |
| 24 | 24 | PLOTTED | ODD | 107.37 | NA | 2nd Stage | 8.80 | 8.80 | 12.20 | 12.20 | SITE NO 23 | 9M ROAD | 12 M ROAD | SY.NO 86/2 |
| 25 | 25 | PLOTTED | ODD | 166.10 | NA | 2nd Stage | 13.61 | 13.61 | 12.20 | 12.20 | 9 M ROAD | SITE NO 26 | 12 M ROAD | SY.NO 86/2 |
| 26 | 26 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 25 | SITE NO 27 | 12 M ROAD | SY.NO 86/2 |
| 27 | 27 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 26 | SITE NO 28 | 12 M ROAD | SY.NO 86/2 |
| 28 | 28 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 27 | OHT | 12 M ROAD | SY.NO 86/2 |
| 29 | 29 | PLOTTED | ODD | 169.90 | NA | 2nd Stage | 15.20 | 15.20 | 11.15 | 11.15 | 9 M ROAD | CA | SITE NO 30 | 12M ROAD |
| 30 | 30 | PLOTTED | 9.14X15.24 | 139.45 | NA | 1st Stage | 15.24 | 15.24 | 9.14 | 9.14 | 9 M ROAD | CA | SITE NO 31 | SITE NO 29 |
| 31 | 31 | PLOTTED | 9.14X15.24 | 139.45 | NA | 1st Stage | 15.24 | 15.24 | 9.14 | 9.14 | 9 M ROAD | CA | PARK | SITE NO 30 |
| 32 | 32 | PLOTTED | ODD | 107.37 | NA | 2nd Stage | 8.80 | 8.80 | 12.20 | 12.20 | SITE NO 33 | 9 M ROAD | SITE NO 68 | 12 M ROAD |
| 33 | 33 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 34 | SITE NO 32 | SITE NO 67 | 12 M ROAD |
| 34 | 34 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 35 | SITE NO 33 | SITE NO 66 | 12 M ROAD |
| 35 | 35 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 36 | SITE NO 34 | SITE NO 65 | 12 M ROAD |
| 36 | 36 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 37 | SITE NO 35 | SITE NO 64 | 12 M ROAD |
| 37 | 37 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 38 | SITE NO 36 | SITE NO 63 | 12 M ROAD |
| 38 | 38 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 39 | SITE NO 37 | SITE NO 62 | 12 M ROAD |
| 39 | 39 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 40 | SITE NO 38 | SITE NO 61 | 12 M ROAD |
| 40 | 40 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 41 | SITE NO 39 | SITE NO 60 | 12 M ROAD |
| 41 | 41 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 42 | SITE NO 40 | SITE NO 59 | 12 M ROAD |
| 42 | 42 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 43 | SITE NO 41 | SITE NO 58 | 12 M ROAD |
| 43 | 43 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 44 | SITE NO 42 | SITE NO 57 | 12 M ROAD |
| 44 | 44 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 45 | SITE NO 43 | SITE NO 56 | 12 M ROAD |
| 45 | 45 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | 9 M ROAD | SITE NO 44 | SITE NO 55 | 12 M ROAD |
| 46 | 46 | PLOTTED | ODD | 129.17 | NA | 2nd Stage | 12.20 | 12.20 | 10.59 | 10.59 | SITE NO 8 | 9M ROAD | SITE NO 47 | 12 M ROAD |
| 47 | 47 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 12.20 | 12.20 | 9.14 | 9.14 | SITE NO 8,7 | 9 M ROAD | SITE NO 48 | SITE NO 46 |
| 48 | 48 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 12.20 | 12.20 | 9.14 | 9.14 | SITE NO 7,6 | 9 M ROAD | SITE NO 49 | SITE NO 47 |
| 49 | 49 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 12.20 | 12.20 | 9.14 | 9.14 | SITE NO 6 | 9 M ROAD | SITE NO 50 | SITE NO 48 |
| 50 | 50 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 12.20 | 12.20 | 9.14 | 9.14 | SITE NO 5 | 9 M ROAD | SITE NO 51 | SITE NO 49 |
| 51 | 51 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 12.20 | 12.20 | 9.14 | 9.14 | SITE NO 5,4 | 9 M ROAD | SITE NO 52 | SITE NO 50 |
| 52 | 52 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 12.20 | 12.20 | 9.14 | 9.14 | SY.NO 4,3 | 9 M ROAD | SITE NO 53 | SITE NO 51 |
| 53 | 53 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 12.20 | 12.20 | 9.14 | 9.14 | SITE NO 3 | 9 M ROAD | SITE NO 54 | SITE NO 52 |
| 54 | 54 | PLOTTED | ODD | 131.14 | NA | 1st Stage | 12.20 | 12.20 | 10.99 | 10.59 | SITE NO 2 | 9 M ROAD | SITE NO 1 | SITE NO 53 |
| 55 | 55 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | 9 M ROAD | SITE NO 56 | 9 M ROAD | SITE NO 45 |
| 56 | 56 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 55 | SITE NO 57 | 9 M ROAD | SITE NO 44 |
| 57 | 57 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 56 | SITE NO 58 | 9 M ROAD | SITE NO 43 |
| 58 | 58 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 57 | SITE NO 59 | 9 M ROAD | SITE NO 42 |
| 59 | 59 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 58 | SITE NO 60 | 9 M ROAD | SITE NO 41 |
| 60 | 60 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 59 | SITE NO 61 | 9 M ROAD | SITE NO 40 |
| 61 | 61 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 60 | SITE NO 62 | 9 M ROAD | SITE NO 39 |
| 62 | 62 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 61 | SITE NO 63 | 9 M ROAD | SITE NO 38 |
| 63 | 63 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 62 | SITE NO 64 | 9 M ROAD | SITE NO 37 |
| 64 | 64 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 63 | SITE NO 65 | 9 M ROAD | SITE NO 36 |
| 65 | 65 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 64 | SITE NO 66 | 9 M ROAD | SITE NO 35 |
| 66 | 66 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 65 | SITE NO 67 | 9 M ROAD | SITE NO 34 |
| 67 | 67 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 66 | SITE NO 68 | 9 M ROAD | SITE NO 33 |
| 68 | 68 | PLOTTED | ODD | 107.37 | NA | 2nd Stage | 8.80 | 8.80 | 12.20 | 12.20 | SITE NO 67 | 9 M ROAD | 9M ROAD | SITE NO 32 |
| 69 | 69 | PLOTTED | ODD | 107.37 | NA | 2nd Stage | 8.80 | 8.80 | 12.20 | 12.20 | SITE NO 70 | 9 M ROAD | SITE NO 96 | 9 M ROAD |
| 70 | 70 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 71 | SITE NO 69 | SITE NO 95 | 9 M ROAD |
| 71 | 71 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 72 | SITE NO 70 | SITE NO 94 | 9 M ROAD |
| 72 | 72 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 73 | SITE NO 71 | SITE NO 93 | 9 M ROAD |
| 73 | 73 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 74 | SITE NO 72 | SITE NO 92 | 9 M ROAD |
| 74 | 74 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 75 | SITE NO 73 | SITE NO 91 | 9 M ROAD |
| 75 | 75 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 76 | SITE NO 74 | SITE NO 90 | 9 M ROAD |
| 76 | 76 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 77 | SITE NO 75 | SITE NO 89 | 9 M ROAD |
| 77 | 77 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 78 | SITE NO 76 | SITE NO 88 | 9 M ROAD |
| 78 | 78 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 79 | SITE NO 77 | SITE NO 87 | 9 M ROAD |
| 79 | 79 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 80 | SITE NO 78 | SITE NO 86 | 9 M ROAD |
| 80 | 80 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 81 | SITE NO 79 | SITE NO 85 | 9 M ROAD |
| 81 | 81 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 82 | SITE NO 80 | SITE NO 84 | 9 M ROAD |
| 82 | 82 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | 9 M ROAD | SITE NO 81 | SITE NO 83 | 9 M ROAD |
| 83 | 83 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | 9 M ROAD | SITE NO 84 | 9 M ROAD | SITE NO 82 |
| 84 | 84 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 83 | SITE NO 85 | 9 M ROAD | SITE NO 81 |
| 85 | 85 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 84 | SITE NO 86 | 9 M ROAD | SITE NO 80 |
| 86 | 86 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 85 | SITE NO 87 | 9 M ROAD | SITE NO 79 |
| 87 | 87 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 86 | SITE NO 88 | 9 M ROAD | SITE NO 78 |
| 88 | 88 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 87 | SITE NO 89 | 9 M ROAD | SITE NO 77 |
| 89 | 89 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 88 | SITE NO 90 | 9 M ROAD | SITE NO 76 |
| 90 | 90 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 89 | SITE NO 91 | 9 M ROAD | SITE NO 75 |
| 91 | 91 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 90 | SITE NO 92 | 9 M ROAD | SITE NO 74 |
| 92 | 92 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 91 | SITE NO 93 | 9 M ROAD | SITE NO 73 |
| 93 | 93 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 92 | SITE NO 94 | 9 M ROAD | SITE NO 72 |
| 94 | 94 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 93 | SITE NO 95 | 9 M ROAD | SITE NO 71 |
| 95 | 95 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 94 | SITE NO 96 | 9 M ROAD | SITE NO 70 |
| 96 | 96 | PLOTTED | ODD | 107.37 | NA | 2nd Stage | 8.80 | 8.80 | 12.20 | 12.20 | SITE NO 95 | 9 M ROAD | 9 M ROAD | SITE NO 69 |
| 97 | 97 | PLOTTED | ODD | 52.84 | NA | 2nd Stage | 8.74 | 8.74 | 6.04 | 6.04 | SITE NO 99 | 9 M ROAD | SITE NO 98 | 9 M ROAD |
| 98 | 98 | PLOTTED | ODD | 55.90 | NA | 2nd Stage | (8.74+8.77)/2 | (8.74+8.77)/2 | 6.75 | 6.04 | SITE NO 99 | 9 M ROAD | 9 M ROAD | SITE NO 97 |
| 99 | 99 | PLOTTED | 6.10XODD | 79.52 | NA | 1st Stage | 6.10 | 6.10 | 13.28 | 12.79 | SITE NO 100 | SITE NO 97,98 | 9 M ROAD | 9 M ROAD |
| 100 | 100 | PLOTTED | 6.10XODD | 82.51 | NA | 1st Stage | 6.10 | 6.10 | 13.77 | 13.28 | SITE NO 101 | SITE NO 99 | 9 M ROAD | 9 M ROAD |
| 101 | 101 | PLOTTED | 6.10XODD | 85.50 | NA | 1st Stage | 6.10 | 6.10 | 14.26 | 13.77 | SITE NO 102 | SITE NO 100 | 9 M ROAD | 9 M ROAD |
| 102 | 102 | PLOTTED | 6.10XODD | 88.49 | NA | 1st Stage | 6.10 | 6.10 | 14.75 | 14.26 | SITE NO 103 | SITE NO 101 | 9 M ROAD | 9 M ROAD |
| 103 | 103 | PLOTTED | 6.10XODD | 91.48 | NA | 1st Stage | 6.10 | 6.10 | 14.75 | 14.75 | SITE NO 104 | SITE NO 102 | 9 M ROAD | 9 M ROAD |
| 104 | 104 | PLOTTED | 6.10XODD | 94.47 | NA | 1st Stage | 6.10 | 6.10 | 15.73 | 15.24 | SITE NO 105 | SITE NO 103 | 9 M ROAD | 9 M ROAD |
| 105 | 105 | PLOTTED | 6.10XODD | 97.46 | NA | 1st Stage | 6.10 | 6.10 | 15.73 | 15.73 | SITE NO 106,121 | SITE NO 104 | 9 M ROAD | 9 M ROAD |
| 106 | 106 | PLOTTED | 6.10X9.14 | 55.80 | NA | 1st Stage | 6.10 | 6.10 | 9.14 | 9.14 | SITE NO 107 | SITE NO 105 | SITE NO 121 | 9 M ROAD |
| 107 | 107 | PLOTTED | 6.10X9.14 | 55.80 | NA | 1st Stage | 6.10 | 6.10 | 9.14 | 9.14 | SITE NO 108 | SITE NO 106 | SITE NO 121 | 9 M ROAD |
| 108 | 108 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 109 | SITE NO 107 | SITE NO 120 | 9 M ROAD |
| 109 | 109 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 110 | SITE NO 108 | SITE NO 120,119 | 9 M ROAD |
| 110 | 110 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 111 | SITE NO 109 | SITE NO 119,118 | 9 M ROAD |
| 111 | 111 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 112 | SITE NO 110 | SITE NO 118,117 | 9 M ROAD |
| 112 | 112 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 113 | SITE NO 111 | SITE NO 117,116 | 9 M ROAD |
| 113 | 113 | PLOTTED | 9.14X12.20 | 111.51 | NA | 1st Stage | 9.14 | 9.14 | 12.20 | 12.20 | SITE NO 114 | SITE NO 112 | SITE NO 116,115 | 9 M ROAD |
| 114 | 114 | PLOTTED | 9.14X12.20 | 111.51 | NA | 2nd Stage | 9.14 | 9.14 | 12.20 | 12.20 | 9 M ROAD | SITE NO 113 | SITE NO 115 | 9 M ROAD |
| 115 | 115 | PLOTTED | ODD | 131.48 | NA | 2nd Stage | (13.71+13.75)/2 | (13.71+13.75)/2 | 10.14 | 9.04 | 9 M ROAD | SITE NO 116 | 9 M ROAD | SITE NO 114,113 |
| 116 | 116 | PLOTTED | 9.14XODD | 79.26 | NA | 1st Stage | 9.14 | 9.14 | 9.04 | 8.30 | SITE NO 115 | SITE NO 117 | 9 M ROAD | SITE NO 113,112 |
| 117 | 117 | PLOTTED | 9.14XODD | 72.55 | NA | 1st Stage | 9.14 | 9.14 | 8.30 | 7.57 | SITE NO 116 | SITE NO 118 | 9 M ROAD | SITE NO 112,111 |
| 118 | 118 | PLOTTED | 9.14XODD | 65.84 | NA | 1st Stage | 9.14 | 9.14 | 7.57 | 6.84 | SITE NO 117 | SITE NO 119 | 9 M ROAD | SITE NO 111,110 |
| 119 | 119 | PLOTTED | 9.14XODD | 59.13 | NA | 1st Stage | 9.14 | 9.14 | 6.84 | 6.10 | SITE NO 118 | SITE NO 120 | 9 M ROAD | SITE NO 110,109 |
| 120 | 120 | PLOTTED | ODD | 76.12 | NA | 1st Stage | (13.71+13.75)/2 | (13.71+13.75)/2 | 6.10 | 5.00 | SITE NO 119 | SITE NO 121 | 9 M ROAD | SITE NO 109,108 |
| 121 | 121 | PLOTTED | ODD | 92.27 | NA | 1st Stage | (12.20+12.24)/2 | (12.20+12.24)/2 | 8.05 | 7.07 | SITE NO 120 | SITE NO 105 | 9 M ROAD | SITE NO 107,106 |
Project Development Schedule
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 12-10-2020 | 01-05-2021 |
| 2 | Formation Of Road, Footpath | Yes | 05-01-2021 | 15-06-2021 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 01-01-2021 | 15-10-2021 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 15-01-2021 | 25-02-2021 |
| 5 | Power Supply Work(Tansformer And Substation) | Yes | 05-01-2021 | 15-06-2021 |
| 6 | Construction Of Storm Water Drainage | Yes | 25-02-2021 | 15-04-2021 |
| 7 | Solid Waste Management and Disposal | No | ||
| 8 | Tree Plantation And LandScape Work | Yes | 15-06-2021 | 14-07-2021 |
| 9 | Street Lighting | Yes | 15-06-2021 | 14-07-2021 |
| 10 | Other Miscellaneous Work | Yes | 15-07-2021 | 14-08-2021 |
Amenities & Utilities Availability
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | No |
| 11 | Power Backup | No |
| 12 | Gas | No |
| 13 | Water and Sanitation | No |
| 14 | Air conditioning and incarnation | No |
Post Registration Details
| Total number of Plots | 121 |
| No. of Public and Semi Pubic Sites | 1 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 741 |
| No. of Parks and Open Spaces | 1 |
| Area of Parks and Open Spaces(in Sq.m) | 1695 |
| Area of Road/Transportation(in Sq.m) | 11101 |
Completion Details
| Project Start Date | 23-07-2020 |
| Project End Date | 01-10-2022 |
| If any extension of time has been granted | NO |
| Cost of land | 83000000 |
| Cost of construction | 18000000 |
| Total cost | 101000000 |
| Total amount collected From buyers | 1498891 |
| Whether any loan has been raised | NO |
| Total amount spent on Project for completion of the project | 25638400 |
| Total No of sites of Project | 121 |
| Total No of sites sold | 31 |
| Total No of sites unsold | 90 |
| Whether there is any changes in inventory details | NO |
Appeals & Complaints
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in