AASTHA PROPERTIES PHASE 3
AJAY PRASAD G
DODDANANCHARLLU VILLEGE SOMENAHALLI HOBLI, GUDIBANDE TQ
Approved
7th Nov 2019
Completed
9th Mar 2022
Registration No.
PRM/KA/RERA/1254/464/PR/191107/002991
Acknowledgement No.
ACK/KA/RERA/1254/464/PR/191017/003629
Project Type
Plotted Development
Approving Authority
Local Planing Authority
District
Chikkaballapura
Taluka
Gudibanda
State
Karnataka
Project Details
| Project Name | AASTHA PROPERTIES PHASE 3 |
| Project Description | AASTHA PROPERTIES PHASE 3 |
| Project Type | Plotted Development |
| Project Status | Completed |
| Project Start Date | 09-08-2019 |
| Proposed Project Completion Date | 09-03-2022 |
| Total Area Of Land (Sq Mtr) | 37331 |
| Total Coverd Area (Sq Mtr) | 20419 |
| Total Open Area (Sq Mtr) | 16911 |
| Estimated Cost of Construction (INR) | 10000000 |
| Cost of Land (INR) | 14000000 |
| Total Project Cost (INR) | 10000000 |
| Project Address | DODDANANCHARLLU VILLEGE SOMENAHALLI HOBLI, GUDIBANDE TQ |
| District | Bengaluru Urban |
| Taluk | Gudibanda |
| Approving Authority | Local Planing Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Type of Inventory | 173 |
| No of Inventory | 173 |
| Carpet Area (Sq Mtr) | 0SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0SqMtr |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Self Development |
| Electricity Supply Transformer And Sub Station | Local Authority |
| Solid Waste Management And Disposal | Local Authority |
| Fire Fighting facility | Local Authority |
| Drinking Water Facility | Self Development |
| Emergency Evacuation Services | Local Authority |
| Use of Renewable Energy | Local Authority |
| Bank Name | Axis Bank |
| Branch | NAGARBHAVI |
| ifscCode | UTIB0001447 |
| Account No.(70% Account) | 916020006779768 |
| State | Karnataka |
Promoter Details
| Firm Type | Individual |
| Name | AJAY PRASAD G |
| Father's Name | GANESH PRASAD H |
| PAN Number | AMZ******* |
| Address | NO 1 , GROUND FLOOR ,1ST STAGE 3RD PHASE, 9TH CROSS,CHANDRA LAYOUT |
| State/UT | Karnataka |
| PIN Code | 560026 |
| Project Name | AASTHA PROPERTIES PHASE 2 |
| Project Description | APPROVED NO PRM/KA/RERA/1254/464/PR/190829/002835 |
| Current Status | Ongoing |
| Type of Land | Residential |
| Expected Completion Date | 27-03-2020 |
| District | Bengaluru Urban |
| Pin Code | 560040 |
Modification Plan Details
| Type of Inventory | 173 |
| No of Inventory | 173 |
| Carpet Area (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
Residential Plot Details
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | RESIDENTIAL | 95.06313 | 1023 | PHASE 3 | Completed | 8.545 | 8.545 | 11.125 | 11.125 | Pvt property | Site no 2 | Pvt property | 9 mtr Road |
| 2 | 2 | RESIDENTIAL | 105.2279 | 1133 | PHASE 3 | Completed | 8.895 | 8.895 | 11.83 | 11.83 | Site no 1 | 12 mtrs road | Pvt property | 9 mtr Road |
| 3 | 3 | RESIDENTIAL | 172.4521 | 1856 | PHASE 3 | Completed | 13.03 | 13.03 | 13.235 | 13.235 | 12 mtrs Road | Site no 4 | Pvt property | 9 mtr Road |
| 4 | 4 | RESIDENTIAL | 149.7375 | 1612 | PHASE 3 | Completed | 10.89 | 10.89 | 13.75 | 13.75 | Site no 3 | pvt property | Pvt property | 9 mtr Road |
| 5 | 5 | RESIDENTIAL | 115.229 | 1240 | PHASE 3 | Completed | 9.445 | 9.445 | 12.2 | 12.2 | Site no 6 | pvt property | 9 mtrs Road | Site no 7 |
| 6 | 6 | RESIDENTIAL | 117.5729 | 1266 | PHASE 3 | Completed | 9.455 | 9.455 | 12.435 | 12.435 | 12 mtrs Road | Site no 5 | 9 mtrs Road | Site no 7 |
| 7 | 7 | RESIDENTIAL | 152.7901 | 1645 | PHASE 3 | Completed | 16.385 | 16.385 | 9.325 | 9.325 | 12 mtrs Road | pvt property | Site no 5 and 6 | Site no 8 |
| 8 | 8 | RESIDENTIAL | 133.4408 | 1436 | PHASE 3 | Completed | 14.31 | 14.31 | 9.325 | 9.325 | 12 mtrs Road | pvt property | Site no 7 | 3 mtrs Road |
| 9 | 9 | RESIDENTIAL | 135.2928 | 1456 | PHASE 3 | Completed | 10.88 | 10.88 | 12.435 | 12.435 | Site no 10 | 12 mtrs road | 9 mtrs Road | Site no 12 |
| 10 | 10 | RESIDENTIAL | 134.6822 | 1450 | PHASE 3 | Completed | 11.035 | 11.035 | 12.205 | 12.205 | Pvt property | Site no 9 | 9 mtrs Road | Site no 11 |
| 11 | 11 | RESIDENTIAL | 123.8197 | 1332 | PHASE 3 | Completed | 10.145 | 10.145 | 12.205 | 12.205 | Pvt property | Site no 12 | Site no 10 | 9 mtr Road |
| 12 | 12 | RESIDENTIAL | 178.5044 | 1921 | PHASE 3 | Completed | 14.355 | 14.355 | 12.435 | 12.435 | Site no 11 | 12 mtrs road | Site no 9 | 9 mtr Road |
| 13 | 13 | RESIDENTIAL | 127.5831 | 1373 | PHASE 3 | Completed | 10.26 | 10.26 | 12.435 | 12.435 | Site no 14 | 12 mtrs road | 9 mtrs Road | Site no 18 |
| 14 | 14 | RESIDENTIAL | 111.4166 | 1200 | PHASE 3 | Completed | 9.14 | 9.14 | 12.19 | 12.19 | Site no 15 | Site no 13 | 9 mtrs Road | Site no 17 |
| 15 | 15 | RESIDENTIAL | 116.9849 | 1259 | PHASE 3 | Completed | 9.585 | 9.585 | 12.205 | 12.205 | Pvt property | Site no 14 | 9 mtrs Road | Site no 16 |
| 16 | 16 | RESIDENTIAL | 106.1225 | 1142 | PHASE 3 | Completed | 8.695 | 8.695 | 12.205 | 12.205 | Pvt property | Site no 17 | Site no 15 | 9 mtr Road |
| 17 | 17 | RESIDENTIAL | 111.4166 | 1200 | PHASE 3 | Completed | 9.14 | 9.14 | 12.19 | 12.19 | Site no 16 | Site no 18 | Site no 14 | 9 mtr Road |
| 18 | 18 | RESIDENTIAL | 170.7647 | 1839 | PHASE 3 | Completed | 13.735 | 13.735 | 12.435 | 12.435 | Site no 17 | 12 mtrs road | Site no 13 | 9 mtr Road |
| 19 | 19 | RESIDENTIAL | 126.9614 | 1367 | PHASE 3 | Completed | 10.21 | 10.21 | 12.435 | 12.435 | Site no 20 | 12 mtrs road | 9 mtrs Road | park |
| 20 | 20 | RESIDENTIAL | 148.5961 | 1600 | PHASE 3 | Completed | 12.19 | 12.19 | 12.19 | 12.19 | 9 mtrs road | Site no 19 | 9 mtrs Road | park |
| 21 | 21 | RESIDENTIAL | 259.836 | 2767 | PHASE 3 | Completed | 11.195 | 11.195 | 23.21 | 23.21 | Site no 22 | 9 mtrs road | 9 mtrs Road | 9 mtr Road |
| 22 | 22 | RESIDENTIAL | 136.3008 | 1467 | PHASE 3 | Completed | 9.16 | 9.16 | 14.88 | 14.88 | Site no 23 | Site no 21 | Pvt property | 9 mtr Road |
| 23 | 23 | RESIDENTIAL | 143.812 | 1548 | PHASE 3 | Completed | 9.16 | 9.16 | 15.7 | 15.7 | Site no 24 | Site no 22 | Pvt property | 9 mtr Road |
| 24 | 24 | RESIDENTIAL | 151.3232 | 1629 | PHASE 3 | Completed | 9.16 | 9.16 | 16.52 | 16.52 | Site no 25 | Site no 23 | Pvt property | 9 mtr Road |
| 25 | 25 | RESIDENTIAL | 158.8344 | 1709 | PHASE 3 | Completed | 9.16 | 9.16 | 17.34 | 17.34 | Site no 26 | Site no 24 | Pvt property | 9 mtr Road |
| 26 | 26 | RESIDENTIAL | 166.2548 | 1790 | PHASE 3 | Completed | 9.155 | 9.155 | 18.16 | 18.16 | Site no 27 | Site no 25 | Pvt property | 9 mtr Road |
| 27 | 27 | RESIDENTIAL | 172.718 | 1860 | PHASE 3 | Completed | 9.1 | 9.1 | 18.98 | 18.98 | Site no 28 And 30 | Site no 26 | Pvt property | 9 mtr Road |
| 28 | 28 | RESIDENTIAL | 111.4166 | 1200 | PHASE 3 | Completed | 9.14 | 9.14 | 12.19 | 12.19 | Site no 29 | Site no 27 | Site no 30 | 9 mtr Road |
| 29 | 29 | RESIDENTIAL | 111.4166 | 1200 | PHASE 3 | Completed | 9.14 | 9.14 | 12.19 | 12.19 | 9 mtr Road | Site no 28 | Site no 30 | 9 mtr Road |
| 30 | 30 | RESIDENTIAL | 147.018 | 1583 | PHASE 3 | Completed | 18.32 | 18.32 | 8.025 | 8.025 | 9 mtrs road | Site no 27 | Pvt property | Site no 28& 29 |
| 31 | 31 | RESIDENTIAL | 145.6406 | 1568 | PHASE 3 | Completed | 15.535 | 15.535 | 9.375 | 9.375 | 3 mtrs road | 9 mtrs road | Pvt property | Site no 32 |
| 32 | 32 | RESIDENTIAL | 139.2936 | 1500 | PHASE 3 | Completed | 15.24 | 15.24 | 9.14 | 9.14 | 3 mtrs road | 9 mtrs road | Site no 31 | 9 mtrs road |
| 33 | 33 | RESIDENTIAL | 111.2889 | 1200 | PHASE 3 | Completed | 9.07 | 9.07 | 12.27 | 12.27 | Pvt property | Site no 34 | 9 mtrs road | Site no 64 |
| 34 | 34 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 33 | Site no 35 | 9 mtrs road | Site no 63 |
| 35 | 35 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 34 | Site no 36 | 9 mtrs road | Site no 62 |
| 36 | 36 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 35 | Site no 37 | 9 mtrs road | Site no 61 |
| 37 | 37 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 36 | Site no 38 | 9 mtrs road | Site no 60 |
| 38 | 38 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 37 | Site no 39 | 9 mtrs road | Site no 59 |
| 39 | 39 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 38 | 9 mtrs road | 9 mtrs road | Site no 58 |
| 40 | 40 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | 9 mtrs road | Site no 41 | 9 mtrs road | Site no 57 |
| 41 | 41 | RESIDENTIAL | 110.9696 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 40 | Site no 42 | 9 mtrs road | Site no 56 |
| 42 | 42 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 41 | Site no 43 | 9 mtrs road | Site no 55 |
| 43 | 43 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 42 | Site no 44 | 9 mtrs road | Site no 54 |
| 44 | 44 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 43 | Site no 45 | 9 mtrs road | Site no 53 |
| 45 | 45 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 44 | Site no 46 | 9 mtrs road | Site no 52 |
| 46 | 46 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 45 | Site no 47 | 9 mtrs road | Site no 51 |
| 47 | 47 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 46 | Site no 48 | 9 mtrs road | Site no 50 |
| 48 | 48 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 47 | 9 mtrs road | 9 mtrs road | Site no 49 |
| 49 | 49 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 50 | 9 mtrs road | Site no 48 | 9 mtrs road |
| 50 | 50 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 51 | Site no 49 | Site no 47 | 9 mtrs road |
| 51 | 51 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 52 | Site no 50 | Site no 46 | 9 mtrs road |
| 52 | 52 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 53 | Site no 51 | Site no 45 | 9 mtrs road |
| 53 | 53 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 54 | Site no 52 | Site no 44 | 9 mtrs road |
| 54 | 54 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 55 | Site no 53 | Site no 43 | 9 mtrs road |
| 55 | 55 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 56 | Site no 54 | Site no 42 | 9 mtrs road |
| 56 | 56 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 57 | Site no 55 | Site no 41 | 9 mtrs road |
| 57 | 57 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | 9 mtrs road | Site no 56 | Site no 40 | 9 mtrs road |
| 58 | 58 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | site no 59 | 9 mtrs road | Site no 39 | 9 mtrs road |
| 59 | 59 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 60 | Site no 58 | Site no 38 | 9 mtrs road |
| 60 | 60 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | site no 61 | Site no 59 | Site no 37 | 9 mtrs road |
| 61 | 61 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | site no 62 | Site no 60 | Site no 36 | 9 mtrs road |
| 62 | 62 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | site no 63 | Site no 61 | Site no 35 | 9 mtrs road |
| 63 | 63 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | site no 64 | Site no 62 | Site no 34 | 9 mtrs road |
| 64 | 64 | RESIDENTIAL | 87.2397 | 940 | PHASE 3 | Completed | 7.11 | 7.11 | 12.27 | 12.27 | Pvt property | Site no 63 | Site no 33 | 9 mtrs road |
| 65 | 65 | RESIDENTIAL | 157.5468 | 1696 | PHASE 3 | Completed | 12.84 | 12.84 | 12.27 | 12.27 | Pvt property | Site no 66 | 9 mtrs road | Site no 94 |
| 66 | 66 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 65 | Site no 67 | 9 mtrs road | Site no 93 |
| 67 | 67 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 66 | Site no 68 | 9 mtrs road | Site no 92 |
| 68 | 68 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 67 | Site no 69 | 9 mtrs road | Site no 91 |
| 69 | 69 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 68 | Site no 70 | 9 mtrs road | Site no 90 |
| 70 | 70 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 69 | 9 mtrs road | 9 mtrs road | Site no 89 |
| 71 | 71 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | 9 mtrs road | Site no 72 | 9 mtrs road | Site no 88 |
| 72 | 72 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 71 | Site no 73 | 9 mtrs road | Site no 87 |
| 73 | 73 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | site no 72 | Site no 74 | 9 mtrs road | Site no 86 |
| 74 | 74 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 73 | Site no 75 | 9 mtrs road | Site no 85 |
| 75 | 75 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 74 | Site no 76 | 9 mtrs road | Site no 84 |
| 76 | 76 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 75 | Site no 77 | 9 mtrs road | Site no 83 |
| 77 | 77 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 76 | Site no 78 | 9 mtrs road | Site no 82 |
| 78 | 78 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 77 | Site no 79 | 9 mtrs road | Site no 81 |
| 79 | 79 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 78 | 9 mtrs road | 9 mtrs road | Site no 80 |
| 80 | 80 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 81 | 9 mtrs road | site no 79 | 12 mtrs road |
| 81 | 81 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 82 | Site no 80 | Site no 78 | 12 mtrs road |
| 82 | 82 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 83 | Site no 81 | site no 77 | 12 mtrs road |
| 83 | 83 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 84 | Site no 82 | site no 76 | 12 mtrs road |
| 84 | 84 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 85 | Site no 83 | site no 75 | 12 mtrs road |
| 85 | 85 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 86 | Site no 84 | site no 74 | 12 mtrs road |
| 86 | 86 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 87 | Site no 85 | site no 73 | 12 mtrs road |
| 87 | 87 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 88 | Site no 86 | site no 72 | 12 mtrs road |
| 88 | 88 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | 9 mtrs road | Site no 87 | site no 71 | 12 mtrs road |
| 89 | 89 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 90 | 9 mtrs road | Site no 70 | 12 mtrs road |
| 90 | 90 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 91 | Site no 89 | Site no 69 | 12 mtrs road |
| 91 | 91 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 92 | Site no 90 | Site no 68 | 12 mtrs road |
| 92 | 92 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 93 | Site no 91 | Site no 67 | 12 mtrs road |
| 93 | 93 | RESIDENTIAL | 110.9596 | 1194 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 94 | Site no 92 | Site no 66 | 12 mtrs road |
| 94 | 94 | RESIDENTIAL | 133.4976 | 1437 | PHASE 3 | Completed | 10.88 | 10.88 | 12.27 | 12.27 | Pvt property | Site no 93 | Site no 65 | 12 mtrs road |
| 95 | 95 | RESIDENTIAL | 111.4166 | 1200 | PHASE 3 | Completed | 12.19 | 12.19 | 9.14 | 9.14 | pvt property | 9 mtrs road | 12 mtrs road | Site no 96 |
| 96 | 96 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | pvt property | 9 mtrs road | Site no 95 | Site no 97 |
| 97 | 97 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | pvt property | 9 mtrs road | Site no 96 | Site no 98 |
| 98 | 98 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | pvt property | 9 mtrs road | Site no 97 | Site no 99 |
| 99 | 99 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | pvt property | 9 mtrs road | Site no 98 | Site no 100 |
| 100 | 100 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | pvt property | 9 mtrs road | Site no 99 | Site no 101 |
| 101 | 101 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | pvt property | 9 mtrs road | Site no 100 | Site no 102 |
| 102 | 102 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | pvt property | 9 mtrs road | Site no 101 | Site no 103 |
| 103 | 103 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | pvt property | 9 mtrs road | Site no 102 | Site no 104 |
| 104 | 104 | RESIDENTIAL | 93.00145 | 1001 | PHASE 3 | Completed | 11.87 | 11.87 | 7.835 | 7.835 | pvt property | 9 mtrs road | Site no 103 | pvt property |
| 105 | 105 | RESIDENTIAL | 78.8443 | 849 | PHASE 3 | Completed | 12.205 | 12.205 | 6.46 | 6.46 | 3mtrs road | 9 mtrs road | Site no 106 | pvt property |
| 106 | 106 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | 3mtrs road | 9 mtrs road | Site no 107 | Site no 105 |
| 107 | 107 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | 3mtrs road | 9 mtrs road | 9 mtrs road | Site no 106 |
| 108 | 108 | RESIDENTIAL | 139.2936 | 1500 | PHASE 3 | Completed | 15.24 | 15.24 | 9.14 | 9.14 | 9 mtrs road | Site no 113 | 9 mtrs road | Site no 109 |
| 109 | 109 | RESIDENTIAL | 139.2936 | 1500 | PHASE 3 | Completed | 15.24 | 15.24 | 9.14 | 9.14 | 9 mtrs road | Site no 112 | Site no 108 | Site no 110 |
| 110 | 110 | RESIDENTIAL | 124.369 | 1339 | PHASE 3 | Completed | 15.26 | 15.26 | 8.15 | 8.15 | 9 mtrs road | Site no 111 | Site no 109 | pvt property |
| 111 | 111 | RESIDENTIAL | 111.9199 | 1205 | PHASE 3 | Completed | 12.205 | 12.205 | 9.17 | 9.17 | Site no 110 | 9 mtrs road | Site no 112 | pvt property |
| 112 | 112 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | Site no 109 | 9 mtrs road | Site no 113 | Site no 111 |
| 113 | 113 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | Site no 108 | 9 mtrs road | 9 mtrs road | Site no 112 |
| 114 | 114 | RESIDENTIAL | 139.2936 | 1500 | PHASE 3 | Completed | 15.24 | 15.24 | 9.14 | 9.14 | 9 mtrs road | Site no 119 | 9 mtrs road | Site no 115 |
| 115 | 115 | RESIDENTIAL | 139.2936 | 1500 | PHASE 3 | Completed | 15.24 | 15.24 | 9.14 | 9.14 | 9 mtrs road | Site no 118 | Site no 114 | Site no 116 |
| 116 | 116 | RESIDENTIAL | 165.7236 | 1784 | PHASE 3 | Completed | 15.26 | 15.26 | 10.86 | 10.86 | 9 mtrs road | Site no 117 | Site mo 115 | pvt property |
| 117 | 117 | RESIDENTIAL | 162.8043 | 1752 | PHASE 3 | Completed | 12.315 | 12.315 | 13.22 | 13.22 | Site no 116 | 9 mtrs road | Site no 118 | pvt property |
| 118 | 118 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | site no 115 | 9 mtrs road | Site no 119 | Site no 117 |
| 119 | 119 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 12.14 | 12.14 | 9.14 | 9.14 | Site no 114 | 9 mtrs road | 9 mtrs road | Site no 118 |
| 120 | 120 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 121 | 9 mtrs road | Site no 144 | 9 mtrs road |
| 121 | 121 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 122 | Site no 120 | Site no 143 | 9 mtrs road |
| 122 | 122 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 123 | Site no 121 | Site no 142 | 9 mtrs road |
| 123 | 123 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 124 | Site no 122 | Site no 141 | 9 mtrs road |
| 124 | 124 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 125 | Site no 123 | Site no 140 | 9 mtrs road |
| 125 | 125 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 126 | Site no 124 | Site no 139 | 9 mtrs road |
| 126 | 126 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 127 | Site no 125 | Site no 138 | 9 mtrs road |
| 127 | 127 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 128 | Site no 126 | Site no 137 | 9 mtrs road |
| 128 | 128 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 129 | Site no 127 | Site no 136 | 9 mtrs road |
| 129 | 129 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 130 | Site no 128 | Site no 135 | 9 mtrs road |
| 130 | 130 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 131 | Site no 129 | Site no 134 | 9 mtrs road |
| 131 | 131 | RESIDENTIAL | 181.0439 | 1949 | PHASE 3 | Completed | 14.755 | 14.755 | 12.27 | 12.27 | 9 mtrs road | Site no 130 | Site no 133 & 132 | 9 mtrs road |
| 132 | 132 | RESIDENTIAL | 93.0066 | 1001 | PHASE 3 | Completed | 7.58 | 7.58 | 12.27 | 12.27 | 9 mtrs road | Site no 133 | 9 mtrs road | Site no 131 |
| 133 | 133 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 132 | Site no 134 | 9 mtrs road | Site no 131 |
| 134 | 134 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 133 | Site no 135 | 9 mtrs road | Site no 130 |
| 135 | 135 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 134 | Site no 136 | 9 mtrs road | Site no 129 |
| 136 | 136 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 135 | Site no 137 | 9 mtrs road | Site no 128 |
| 137 | 137 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 136 | Site no 138 | 9 mtrs road | Site no 127 |
| 138 | 138 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 137 | Site no 139 | 9 mtrs road | Site no 126 |
| 139 | 139 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 138 | Site no 140 | 9 mtrs road | Site no 125 |
| 140 | 140 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 139 | Site no 141 | 9 mtrs road | Site no 124 |
| 141 | 141 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 140 | Site no 142 | 9 mtrs road | Site no 123 |
| 142 | 142 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 141 | Site no 143 | 9 mtrs road | Site no 122 |
| 143 | 143 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 142 | Site no 144 | 9 mtrs road | Site no 121 |
| 144 | 144 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 143 | 9 mtrs road | 9 mtrs road | Site no 120 |
| 145 | 145 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 146 | 9 mtrs road | Site no 170 | 9 mtrs road |
| 146 | 146 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 147 | Site no 145 | Site no 169 | 9 mtrs road |
| 147 | 147 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 148 | Site no 146 | Site no 168 | 9 mtrs road |
| 148 | 148 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 149 | Site no 147 | Site no 167 | 9 mtrs road |
| 149 | 149 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 150 | Site no 148 | Site no 166 | 9 mtrs road |
| 150 | 150 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 151 | Site no 149 | Site no 165 | 9 mtrs road |
| 151 | 151 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 152 | Site no 150 | Site no 164 | 9 mtrs road |
| 152 | 152 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 153 | Site no 151 | Site no 163 | 9 mtrs road |
| 153 | 153 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 154 | Site no 152 | Site no 162 | 9 mtrs road |
| 154 | 154 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 155 | Site no 153 | Site no 161 | 9 mtrs road |
| 155 | 155 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 156 | Site no 154 | Site no 160 | 9 mtrs road |
| 156 | 156 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 157 | Site no 155 | Site no 159 | 9 mtrs road |
| 157 | 157 | RESIDENTIAL | 134.786 | 1450 | PHASE 3 | Completed | 10.985 | 10.985 | 12.27 | 12.27 | 9 mtrs road | Site no 156 | Site no 158 | 9 mtrs road |
| 158 | 158 | RESIDENTIAL | 166.9334 | 1796 | PHASE 3 | Completed | 13.605 | 13.605 | 12.27 | 12.27 | 9 mtrs road | Site no 159 | 12 mtrs road | Site no 157 |
| 159 | 159 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 158 | Site no 160 | 12 mtrs road | Site no 156 |
| 160 | 160 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 159 | Site no 161 | 12 mtrs road | Site no 155 |
| 161 | 161 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 160 | Site no 162 | 12 mtrs road | Site no 154 |
| 162 | 162 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 161 | Site no 163 | 12 mtrs road | Site no 153 |
| 163 | 163 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 162 | Site no 164 | 12 mtrs road | Site no 152 |
| 164 | 164 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 163 | Site no 165 | 12 mtrs road | Site no 151 |
| 165 | 165 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 164 | Site no 166 | 12 mtrs road | Site no 150 |
| 166 | 166 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 165 | Site no 167 | 12 mtrs road | Site no 149 |
| 167 | 167 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 166 | Site no 168 | 12 mtrs road | Site no 148 |
| 168 | 168 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 167 | Site no 169 | 12 mtrs road | Site no 147 |
| 169 | 169 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 168 | Site no 170 | 12 mtrs road | Site no 146 |
| 170 | 170 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 169 | 9 mtrs road | 12 mtrs road | Site no 145 |
| 171 | 171 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | 9 mtrs road | Site no 172 | 12 mtrs road | 3 mtrs Road |
| 172 | 172 | RESIDENTIAL | 110.9596 | 1195 | PHASE 3 | Completed | 9.14 | 9.14 | 12.14 | 12.14 | Site no 171 | Site no 173 | 12 mtrs road | 3 mtrs Road |
| 173 | 173 | RESIDENTIAL | 139.8698 | 1505 | PHASE 3 | Completed | 11.145 | 11.145 | 12.55 | 12.55 | Site no 172 | pvt property | 12 mtrs road | 3 mtrs Road |
Project Development Schedule
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 15-11-2019 | 20-02-2021 |
| 2 | Formation Of Road, Footpath | Yes | 15-11-2019 | 20-03-2021 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 15-11-2019 | 20-03-2021 |
| 4 | Construction Of Sewage System Infrastucture | Yes | 15-11-2019 | 20-03-2021 |
| 5 | Power Supply Work(Tansformer And Substation) | No | ||
| 6 | Construction Of Storm Water Drainage | No | ||
| 7 | Solid Waste Management and Disposal | No | ||
| 8 | Tree Plantation And LandScape Work | No | ||
| 9 | Street Lighting | No | ||
| 10 | Other Miscellaneous Work | No |
Amenities & Utilities Availability
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | No |
| 11 | Power Backup | No |
| 12 | Gas | No |
| 13 | Water and Sanitation | No |
| 14 | Air conditioning and incarnation | No |
Post Registration Details
| WebSite Link 1 | www.aasthaproperties.in |
| Total number of Plots | 173 |
| No. of Public and Semi Pubic Sites | 0 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 1878 |
| No. of Parks and Open Spaces | 1 |
| Area of Parks and Open Spaces(in Sq.m) | 1952 |
| Area of Road/Transportation(in Sq.m) | 13082 |
Appeals & Complaints
| Appeals / FNH | NO APPEALS / FNH |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in