GENESIS ENGINEERS
Padau Village, Mangalore Taluk, Padau Village, Mangalore Taluk
Approved
22nd Jul 2020
Completed
18th Mar 2022
Registration No.
PRM/KA/RERA/1257/334/PR/200722/003503
Acknowledgement No.
ACK/KA/RERA/1257/334/PR/200626/004105
Project Type
Residential/Group Housing
Approving Authority
Mangaluru Urban Development Authority
District
Dakshina Kannada
Taluka
Mangalore
State
Karnataka
| Project Name | GENESIS WHITE TRILLIUM |
| Project Description | SPECIFICATION AND AMENITIES: 1) 29 meticulously designed units in Ground plus Four Floor and First cellar. 2) Granite flooring for staircase, 3) 6 passenger’s elevator. 4) 20 K.W Generator backup for common area and Lift and Fire System. 5) Water supplies with bore well in addition to City Corporation water connection. 6) Fire fighting system. 7) Superior quality vitrified floor tiles inside the apartment. 8) Attractive polished decorative main entrance door. 9) Premium quality CP fittings for toilets and kitchen. 10) Double coat exterior plastering with required groves and architectural features. 11) Putty finished acrylic emulsion painting for ceilings and walls. 12) External painting of the building with acrylic external emulsion. 13) Modular Electrical switches. 14) Concealed Electric wiring of a reputed brand. 15) Electrical fittings for common area, car parking and yard. 16) RCC door frames with good quality painted flush door shutters for rooms. 17) Fibrotic Shutters for toilets. 18) Superior locks for all doors. 19) Brushed stainless steel finished door hardware. 20) Powder coated aluminum window frames with grill. 21) Overhead water tank & underground sump tank with required pumps. 22) Covered car parking. 23) Interlock paving for car parking. 24) Compound wall & gate with lighting 25) Sewage Treatment plant as per PCB. 26) Rain Water Harvest and Roof Water. 27) Covered Roof with Truss and Sheet on Gutter Slab and beam. 28) C.C.TV to Common Areas. Drawing/Dining:- 1) Telephone connection point. 2) TV point. 3) Call bell. 4) Wash basin for dining. Bedrooms:- 1) Split AC provision for all bedrooms. 2) TV point & telephone point in Master bedroom. Kitchen & Work Area:- 1) Polished Granite platform with nosing. 2) 2’0” glazed tile dado above platform. 3) Stainless steel sinks with drain board TATA or equivalent. 4) Adequate power points. 5) Provision for fixing water purifier near the sink. 6) Provision for exhaust fan. 7) Provision for washing machine a |
| Project Type | Residential/Group Housing |
| Project Status | New Project Launch |
| Project Start Date | 06-03-2020 |
| Proposed Project Completion Date | 18-03-2022 |
| Total Area Of Land (Sq Mtr) | 951 |
| Total Coverd Area (Sq Mtr) | 373 |
| Total Open Area (Sq Mtr) | 578 |
| Estimated Cost of Construction (INR) | 50000000 |
| Cost of Land (INR) | 14122350 |
| Total Project Cost (INR) | 64122350 |
| Project Address | Padau Village, Mangalore Taluk, Padau Village, Mangalore Taluk |
| District | Dakshina Kannada |
| Taluk | Mangalore |
| Approving Authority | Mangaluru Urban Development Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 9 |
| Area of Parking for Sale (Sq Mtr) | 113 |
| Type of Inventory | 1BHK |
| No of Inventory | 6 |
| Carpet Area (Sq Mtr) | 241SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 29SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0SqMtr |
| Road System | Local Authority |
| Water Supply | Local Authority |
| Sewege and Drainage System | Local Authority |
| Electricity Supply Transformer And Sub Station | Local Authority |
| Solid Waste Management And Disposal | Local Authority |
| Fire Fighting facility | Local Authority |
| Drinking Water Facility | Local Authority |
| Emergency Evacuation Services | Local Authority |
| Use of Renewable Energy | Local Authority |
| Bank Name | Canara Bank |
| Branch | KUNTIKANA |
| ifscCode | CNRB0000178 |
| Account No.(70% Account) | 1078214000008 |
| State | Karnataka |
| Name | SUBRAMANYA |
| Address | SARASWATHI CONSULTANCY BALLAL BAGH,MANNAGUDDA ROAD MANGALURU |
| Pin Code | 575003 |
| Year Of Establishment | 2010 |
| Number of Project Completed | 50 |
| Reg. Of COA No. | 286-116-330/2018-23 |
| Local Authority Licence Number | 286-116-330/2018-23 |
| Promoter Type | Partnership Firm |
| Name | ELIOT JOHNSON |
| PAN Number | AAPFG4856R |
| Address | "Vellukkattil", Near AJ Hospital, Barebail, Bejai, Mangalore , "Vellukkattil", Near AJ Hospital, Barebail, Bejai, Mangalore |
| District | Dakshina Kannada |
| State/UT | Karnataka |
| PIN Code | 575005 |
| Company Registration No. | NOTAPPLICABLE |
| Sl No. |
| Type of Inventory | 1BHK |
| No of Inventory | 6 |
| Carpet Area (Sq Mtr) | 241 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 29 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Earth work and other leveling preparation work | Yes | 07-01-2020 | 01-02-2020 |
| 2 | Foundation footing work | Yes | 30-01-2020 | 27-02-2020 |
| 3 | Retaining wall (All types) | Yes | 27-02-2020 | 30-06-2020 |
| 4 | Plinth level Beam | Yes | 30-01-2020 | 15-03-2020 |
| 5 | Sub-structure flooring (Parking Floor, more than one floor below general ground level) | Yes | 03-05-2020 | 30-07-2020 |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Water Supply | Yes |
| 2 | Internal Roads & Footpaths | No |
| 3 | Sewage and Drainage System | Yes |
| 4 | Parks & Tree planting | No |
| 5 | Street Lighting | No |
| 6 | Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes |
| 7 | Solid waste management and disposal | Yes |
| 8 | Water conservation | Yes |
| 9 | Energy management | Yes |
| 10 | Fire protection and fire safety requirements | Yes |
| 11 | Education/Health/Other public amenities | Yes |
| FAR Sanctioned | 2.18 |
| Number of Towers | 1 |
| 0 | 4 |
| 1 | 5 |
| 2 | 5 |
| 3 | 5 |
| 4 | 5 |
| 5 | 5 |
| Total No of Units | 29 |
| Project Start Date | 06-03-2020 |
| Project End Date | 18-03-2022 |
| If any extension of time has been granted | NO |
| Cost of land | 14122350 |
| Cost of construction | 50000000 |
| Total project cost | 64122350 |
| Total amount collected from buyers | 34693582 |
| Whether any loan has been raised | NO |
| Total amount spent for completion of the project | 41932163 |
| Balance amount with the promoter | 0 |
| Total number of Flats/Apartments of the Project | 29 |
| Total number of Flats/Apartments sold | 16 |
| Total number of Flats/Apartments Unsold | 13 |
| Whether the project has been completed within the stipulated Period? | YES |
| Whether there is any Change in inventory list or specification? | NO |
| As built drawing approved by the planning Authority | YES |
| Occupancy certificate received? | YES |
| Occupancy certificate received date | 25-08-2022 |
| Appeals / FNH | NO APPEALS / FNH |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |


Ask Pulse Ai anything about real estate