SMR GROUP
ALAPE VILLAGE PADIL , MANGALORE
Approved
3rd Oct 2018
Completed
31st Dec 2019
Registration No.
PRM/KA/RERA/1257/334/PR/181003/002020
Acknowledgement No.
PR/KN/180203/002731
Project Type
Residential/Group Housing
Approving Authority
Mangaluru Urban Development Authority
District
Dakshina Kannada
Taluka
Mangalore
State
Karnataka
| Project Name | WESTGATE GARDENS 'BLOCK A' |
| Project Description | • Fully framed RCC Structure laterite walls for exterior & concrete blocks for internal walls • Double coat exterior plastering with water proof treatment • 3KW Power Supply for 2 bedroom & 4KW for 3 bedroom provided for each apartments • Water supply with borewell or open well in addition to the corporation water connection • Automatic water level controller for overhead tank • Total backup generator with acoustic enclosure • Anodised aluminum windows with steel grills • Concrete door frame with good quality flush doors for rooms & fibrotech • Putty finish plastic emulsion for interior walls & water proof apex pain to for external walls • Concrete interlock paving for car parking and yard • Intercom facility to all apartments, security, visitors lobby and society room KITCHEN • Adequate electric power points • Provision for water purifiers • Provision for exhaust fan • Granite platform with stainless steel sink • Plumbing and drainage connection with power point for washing machine, refrigerator and microwave oven DRAWING / DINING • Two way electrical system with modular switches • TV points and telephone / Cable TV point • Wash basin for Dining BEDROOMS • Power supply for AC for all bedrooms • Two way light control with modular switches • Telephones, TV point in all bedrooms BATHROOMS • Water proof treatment for sunken free RCC slab • Leak proof drainage system • Wash Basin provision for master bedroom • Flush valves / cocks for commodes • Hot and cold water mixer unit for all bathrooms • EWC for all toilets • Ceramic tiles (anti skid) • Designer wall tiles up to 7 ft height • Provision for exhaust fan • Provision for electric heater • Superior quality plumbing fittings in all toilets |
| Project Type | Residential/Group Housing |
| Project Status | Completed |
| Project Start Date | 01-12-2012 |
| Proposed Project Completion Date | 31-12-2019 |
| Total Area Of Land (Sq Mtr) | 11646 |
| Total Coverd Area (Sq Mtr) | 1733 |
| Total Open Area (Sq Mtr) | 9913 |
| Estimated Cost of Construction (INR) | 345339235 |
| Cost of Land (INR) | 92700000 |
| Total Project Cost (INR) | 438039235 |
| Project Address | ALAPE VILLAGE PADIL , MANGALORE |
| District | Dakshina Kannada |
| Taluk | Mangalore |
| Approving Authority | Mangaluru Urban Development Authority |
| No of Garage for Sale | 144 |
| Area of Garage for Sale (Sq Mtr) | 4841 |
| No of Parking for Sale | 37 |
| Area of Parking for Sale (Sq Mtr) | 722 |
| Type of Inventory | RESIDENTIAL FLATS |
| No of Inventory | 137 |
| Carpet Area (Sq Mtr) | 17307SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 1974SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 434SqMtr |
| Road System | Local Authority |
| Water Supply | Local Authority |
| Sewege and Drainage System | Local Authority |
| Electricity Supply Transformer And Sub Station | Local Authority |
| Solid Waste Management And Disposal | Local Authority |
| Fire Fighting facility | Self Development |
| Drinking Water Facility | Local Authority |
| Emergency Evacuation Services | Self Development |
| Use of Renewable Energy | Self Development |
| Bank Name | Axis Bank |
| Branch | MANGALORE |
| ifscCode | UTIB0000077 |
| Account No.(70% Account) | 912020021698950 |
| State | Karnataka |
| Name | MAXIMA CONSTRUCTIONS |
| Address | DEEPAK BUILDING NEAR VIJAYA BANK PO PEDAMALE ,NEERMARGA MANGALORE |
| Pin Code | 575029 |
| Year Of Establishment | 2012 |
| Number of Project Completed | 15 |
| Reg. Of COA No. | 46-25/2013-18, CA/2006/37684 |
| Local Authority Licence Number | BCC/BL-3-6/E-3255:13-14 |
| Number Of Project Completed | 3 |
| Promoter Type | Other |
| Name | KIRIT L PATEL |
| PAN Number | ABYPR9845D |
| Address | 502 CLASSIQ PRESIDENCY .KANKANADY MANGALORE |
| District | Dakshina Kannada |
| State/UT | Karnataka |
| PIN Code | 575001 |
| Company Registration No. | NOT APPLICABLE |
| Type | Others |
| Pin Code | 575002 |
| Type of Inventory | RESIDENTIAL FLATS |
| No of Inventory | 137 |
| Carpet Area (Sq Mtr) | 17307 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 1974 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 434 Sq Mtr |
| Extension Applied On | 28-11-2019 |
| Extension Approved On | 25-11-2020 |
| Extension Registration Number | EX/PRM/KA/RERA/1257/334/PR/201125/002020 |
| Proposed Project End Date at the time of registration | 31-12-2018 |
| Project End Date provided under Section 6 | 31-12-2019 |
| whether 2/3rd concern from the allottees has taken? | NO |
| Whether any compensation is provided for the Buyer? | NO |
| Document Name | RECEIVED OCCUPANCY CERTIFICATE |
| 1 | Awaiting OC |
| Document Name_1 | |
| Document Name_2 |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Earth work and other leveling preparation work | Yes | 10-05-2012 | 30-05-2012 |
| 2 | Foundation footing work | Yes | 23-05-2012 | 20-06-2012 |
| 3 | Retaining wall (All types) | Yes | 27-06-2012 | 05-08-2012 |
| 4 | Plinth level Beam | Yes | 27-06-2012 | 05-08-2012 |
| 5 | Sub-structure flooring (Parking Floor, more than one floor below general ground level) | Yes | 10-08-2012 | 10-09-2012 |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Water Supply | Yes |
| 2 | Internal Roads & Footpaths | No |
| 3 | Sewage and Drainage System | Yes |
| 4 | Parks & Tree planting | Yes |
| 5 | Street Lighting | No |
| 6 | Provision for community buildings and for treatment and disposal of sewage and sullage water | No |
| 7 | Solid waste management and disposal | Yes |
| 8 | Water conservation | No |
| 9 | Energy management | No |
| 10 | Fire protection and fire safety requirements | No |
| 11 | Education/Health/Other public amenities | No |
| FAR Sanctioned | 1.56 |
| Number of Towers | 1 |
| 0 | 0 |
| 1 | 4 |
| 2 | 9 |
| 3 | 10 |
| 4 | 9 |
| 5 | 10 |
| 6 | 10 |
| 7 | 10 |
| 8 | 9 |
| 9 | 10 |
| 10 | 9 |
| 11 | 10 |
| 12 | 10 |
| 13 | 9 |
| 14 | 9 |
| 15 | 9 |
| Total No of Units | 137 |
| Project Start Date | 01-12-2012 |
| Project End Date | 31-12-2019 |
| If any extension of time has been granted | YES |
| Extended From Date | 31-12-2018 |
| Extended End Date | 31-12-2019 |
| Cost of land | 92700000 |
| Cost of construction | 345339235 |
| Total project cost | 438039235 |
| Total amount collected from buyers | 226776038 |
| Whether any loan has been raised | YES |
| Total amount spent for completion of the project | 320640524 |
| Balance amount with the promoter | 19359476 |
| Total number of Flats/Apartments of the Project | 137 |
| Total number of Flats/Apartments sold | 63 |
| Total number of Flats/Apartments Unsold | 36 |
| Whether the project has been completed within the stipulated Period? | YES |
| Whether there is any Change in inventory list or specification? | NO |
| As built drawing approved by the planning Authority | YES |
| Occupancy certificate received? | YES |
| Occupancy certificate received date | 25-03-2019 |
| Appeals / FNH | NO APPEALS / FNH |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |