Neelgund Developers and Builders Pvt Ltd
R S no 892, Hubli, Kusugal Village, Dharwad
Approved
8th Feb 2021
Completed
31st Mar 2024
Registration No.
PRM/KA/RERA/1259/479/PR/210208/003890
Acknowledgement No.
ACK/KA/RERA/1259/479/PR/210120/004527
Project Type
Plotted Development
Approving Authority
Hubbali-Dharwad Urban Development Authority
District
Dharwad
Taluka
Hubballi
State
Karnataka
| Project Name | NEELGUND EKTA 4 |
| Project Description | NEELGUND EKTA 4 is the Plotted Project |
| Project Type | Plotted Development |
| Project Status | New Project Launch |
| Project Start Date | 20-01-2021 |
| Proposed Project Completion Date | 31-03-2024 |
| Total Area Of Land (Sq Mtr) | 12140 |
| Total Coverd Area (Sq Mtr) | 6635 |
| Total Open Area (Sq Mtr) | 5505 |
| Estimated Cost of Construction (INR) | 15000000 |
| Cost of Land (INR) | 18600000 |
| Total Project Cost (INR) | 33600000 |
| Project Address | R S no 892, Hubli, Kusugal Village, Dharwad |
| District | Dharwad |
| Taluk | Hubballi |
| Approving Authority | Hubbali-Dharwad Urban Development Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 0 |
| Area of Parking for Sale (Sq Mtr) | 0 |
| Type of Inventory | Open Plots |
| No of Inventory | 59 |
| Carpet Area (Sq Mtr) | 6635SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0SqMtr |
| Road System | Self Development |
| Water Supply | Self Development |
| Sewege and Drainage System | Local Authority |
| Electricity Supply Transformer And Sub Station | Self Development |
| Solid Waste Management And Disposal | Local Authority |
| Fire Fighting facility | Local Authority |
| Drinking Water Facility | Local Authority |
| Emergency Evacuation Services | Local Authority |
| Use of Renewable Energy | Local Authority |
| Bank Name | HDFC |
| Branch | Hubli |
| ifscCode | HDFC0000254 |
| Account No.(70% Account) | 50200053671713 |
| State | Karnataka |
| Name | – Neelgund Developers & Builders Pvt. Ltd |
| Address | T 1,2 3rd Floor, Kataria Trade Center, Koppikar Road,Hubli |
| Pin Code | 580020 |
| Year Of Establishment | 2009 |
| Number Of Project Completed | 7 |
| Promoter Type | Company |
| Name | Asmanaaz .M. Neelgund |
| PAN Number | AADCN1819Q |
| Address | Plot No 16, Banashankari Badawane.Vidyanagar, Hubli |
| District | Dharwad |
| State/UT | Karnataka |
| PIN Code | 580020 |
| Company Registration No. | U70102KA2009PTC050499 |
| Type | Director |
| Pin Code | 580021 |
| Sl No. |
| Type of Inventory | Open Plots |
| No of Inventory | 59 |
| Carpet Area (Sq Mtr) | 6635 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 0 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 0 Sq Mtr |
| Sl No. | Plot No. | Plot Type | Plot Size | Plot Area | Phase | Stage | North Dimension | South Dimension | East Dimension | West Dimension | North Schedule Dimension | South Schedule Dimension | East Schedule Dimension | West Schedule Dimension |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 1 | Plotted | NA | (J2+I2)/2*(G2+H2)/2 | 903.84 | NA | 12.00 | 12.00 | 6.80 | 7.20 | Block No. 894 | Plot No. 02 | Plot No. 03 | 9mtr Road |
| 2 | 2 | Plotted | NA | (J3+I3)/2*(G3+H3)/2 | 1090.102 | NA | 12.00 | 12.05 | 7.85 | 9.00 | Plot No. 01 | 9mtr Road | Plot No. 03 | 9mtr Road |
| 3 | 3 | Plotted | NA | (J4+I4)/2*(G4+H4)/2 | 1795.272 | NA | 12.00 | 12.05 | 13.10 | 14.65 | Block No. 894 | 9mtr Road | 9mtr Road | Plot No. 01 & 02 |
| 4 | 4 | Plotted | NA | (J5+I5)/2*(G5+H5)/2 | 1187.904 | NA | 9.40 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 05 | 9mtr Road |
| 5 | 5 | Plotted | NA | (J6+I6)/2*(G6+H6)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 06 | Plot No. 04 |
| 6 | 6 | Plotted | NA | (J7+I7)/2*(G7+H7)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 07 | Plot No. 05 |
| 7 | 7 | Plotted | NA | (J8+I8)/2*(G8+H8)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 08 | Plot No. 06 |
| 8 | 8 | Plotted | NA | (J9+I9)/2*(G9+H9)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 09 | Plot No. 07 |
| 9 | 9 | Plotted | NA | (J10+I10)/2*(G10+H10)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 10 | Plot No. 08 |
| 10 | 10 | Plotted | NA | (J11+I11)/2*(G11+H11)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 11 | Plot No. 09 |
| 11 | 11 | Plotted | NA | (J12+I12)/2*(G12+H12)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 12 | Plot No. 10 |
| 12 | 12 | Plotted | NA | (J13+I13)/2*(G13+H13)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 13 | Plot No. 11 |
| 13 | 13 | Plotted | NA | (J14+I14)/2*(G14+H14)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 14 | Plot No. 12 |
| 14 | 14 | Plotted | NA | (J15+I15)/2*(G15+H15)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 15 | Plot No. 13 |
| 15 | 15 | Plotted | NA | (J16+I16)/2*(G16+H16)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 16 | Plot No. 14 |
| 16 | 16 | Plotted | NA | (J17+I17)/2*(G17+H17)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 17 | Plot No. 15 |
| 17 | 17 | Plotted | NA | (J18+I18)/2*(G18+H18)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 18 | Plot No. 16 |
| 18 | 18 | Plotted | NA | (J19+I19)/2*(G19+H19)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 19 | Plot No. 17 |
| 19 | 19 | Plotted | NA | (J20+I20)/2*(G20+H20)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 20 | Plot No. 18 |
| 20 | 20 | Plotted | NA | (J21+I21)/2*(G21+H21)/2 | 1162.08 | NA | 9.00 | 9.00 | 12.00 | 12.00 | Block No. 894 | 9mtr Road | Plot No. 21 | Plot No. 19 |
| 21 | 21 | Plotted | NA | (J22+I22)/2*(G22+H22)/2 | 1162.383 | NA | 11.20 | 6.05 | 13.05 | 12.00 | Block No. 894 | 9mtr Road | Block No. 893 | Plot No. 20 |
| 22 | 22 | Plotted | NA | (J23+I23)/2*(G23+H23)/2 | 2492.55 | NA | 16.40 | 16.40 | 13.85 | 14.40 | 9mtr Road | Plot No. 23 | 9mtr Road | Plot No. 27 |
| 23 | 23 | Plotted | NA | (J24+I24)/2*(G24+H24)/2 | 1588.176 | NA | 16.40 | 16.40 | 9.00 | 9.00 | Plot No. 22 | Plot No. 24 | 9mtr Road | Plot No. 26 |
| 24 | 24 | Plotted | NA | (J25+I25)/2*(G25+H25)/2 | 1588.176 | NA | 16.40 | 16.40 | 9.00 | 9.00 | Plot No. 23 | Block No. 891 | 9mtr Road | Plot No. 25 |
| 25 | 25 | Plotted | NA | (J26+I26)/2*(G26+H26)/2 | 1452.56 | NA | 15.00 | 15.00 | 9.00 | 9.00 | Plot No. 26 | Block No. 891 | Plot No. 24 | 9mtr Road |
| 26 | 26 | Plotted | NA | (J27+I27)/2*(G27+H27)/2 | 1452.56 | NA | 15.00 | 15.00 | 9.00 | 9.00 | Plot No. 27 | Plot No. 25 | Plot No. 23 | 9mtr Road |
| 27 | 27 | Plotted | NA | (J28+I28)/2*(G28+H28)/2 | 2368.545 | NA | 15.00 | 15.00 | 14.40 | 14.95 | 9mtr Road | Plot No. 26 | Plot No. 22 | 9mtr Road |
| 28 | 28 | Plotted | NA | (J29+I29)/2*(G29+H29)/2 | 829.596 | NA | 12.00 | 12.00 | 6.20 | 6.65 | 9mtr Road | Plot No. 29 | 9mtr Road | Plot No. 35 |
| 29 | 29 | Plotted | NA | (J30+I30)/2*(G30+H30)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 28 | Plot No. 30 | 9mtr Road | Plot No. 34 |
| 30 | 30 | Plotted | NA | (J31+I31)/2*(G31+H31)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 29 | Plot No. 31 | 9mtr Road | Plot No. 33 |
| 31 | 31 | Plotted | NA | (J32+I32)/2*(G32+H32)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 30 | Block No. 891 | 9mtr Road | Plot No. 32 |
| 32 | 32 | Plotted | NA | (J33+I33)/2*(G33+H33)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 33 | Block No. 891 | Plot No. 31 | 9mtr Road |
| 33 | 33 | Plotted | NA | (J34+I34)/2*(G34+H34)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 34 | Plot No. 32 | Plot No. 30 | 9mtr Road |
| 34 | 34 | Plotted | NA | (J35+I35)/2*(G35+H35)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 35 | Plot No. 33 | Plot No. 29 | 9mtr Road |
| 35 | 35 | Plotted | NA | (J36+I36)/2*(G36+H36)/2 | 884.472 | NA | 12.00 | 12.00 | 6.65 | 7.05 | 9mtr Road | Plot No. 34 | Plot No. 28 | 9mtr Road |
| 36 | 36 | Plotted | NA | (J37+I37)/2*(G37+H37)/2 | 1055.556 | NA | 12.00 | 12.00 | 7.35 | 9.00 | 9mtr Road | Plot No. 37 | 9mtr Road | Plot No. 43 |
| 37 | 37 | Plotted | NA | (J38+I38)/2*(G38+H38)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 36 | Plot No. 38 | 9mtr Road | Plot No. 42 |
| 38 | 38 | Plotted | NA | (J39+I39)/2*(G39+H39)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 37 | Plot No. 39 | 9mtr Road | Plot No. 41 |
| 39 | 39 | Plotted | NA | (J40+I40)/2*(G40+H40)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 38 | Block No. 891 | 9mtr Road | Plot No. 40 |
| 40 | 40 | Plotted | NA | (J41+I41)/2*(G41+H41)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 41 | Block No. 891 | Plot No. 39 | 9mtr Road |
| 41 | 41 | Plotted | NA | (J42+I42)/2*(G42+H42)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 42 | Plot No. 40 | Plot No. 38 | 9mtr Road |
| 42 | 42 | Plotted | NA | (J43+I43)/2*(G43+H43)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 43 | Plot No. 41 | Plot No. 37 | 9mtr Road |
| 43 | 43 | Plotted | NA | (J44+I44)/2*(G44+H44)/2 | 1349.304 | NA | 12.00 | 12.00 | 7.75 | 13.15 | 9mtr Road | Plot No. 42 | Plot No. 36 | 9mtr Road |
| 44 | 44 | Plotted | NA | (J45+I45)/2*(G45+H45)/2 | 1116.888 | NA | 12.00 | 12.00 | 8.45 | 8.85 | 9mtr Road | Plot No. 45 | 9mtr Road | Plot No. 51 |
| 45 | 45 | Plotted | NA | (J46+I46)/2*(G46+H46)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 44 | Plot No. 46 | 9mtr Road | Plot No. 50 |
| 46 | 46 | Plotted | NA | (J47+I47)/2*(G47+H47)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 45 | Plot No. 47 | 9mtr Road | Plot No. 49 |
| 47 | 47 | Plotted | NA | (J48+I48)/2*(G48+H48)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 46 | Block No. 891 | 9mtr Road | Plot No. 48 |
| 48 | 48 | Plotted | NA | (J49+I49)/2*(G49+H49)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 49 | Block No. 891 | Plot No. 47 | 9mtr Road |
| 49 | 49 | Plotted | NA | (J50+I50)/2*(G50+H50)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 50 | Plot No. 48 | Plot No. 46 | 9mtr Road |
| 50 | 50 | Plotted | NA | (J51+I51)/2*(G51+H51)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 51 | Plot No. 49 | Plot No. 45 | 9mtr Road |
| 51 | 51 | Plotted | NA | (J52+I52)/2*(G52+H52)/2 | 1168.536 | NA | 12.00 | 12.00 | 8.85 | 9.25 | 9mtr Road | Plot No. 50 | Plot No. 44 | 9mtr Road |
| 52 | 52 | Plotted | NA | (J53+I53)/2*(G53+H53)/2 | 1015.70365 | NA | 12.05 | 12.00 | 8.40 | 7.30 | 9mtr Road | Plot No. 53 | 9mtr Road | Plot No. 59 |
| 53 | 53 | Plotted | NA | (J54+I54)/2*(G54+H54)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 52 | Plot No. 54 | 9mtr Road | Plot No. 58 |
| 54 | 54 | Plotted | NA | (J55+I55)/2*(G55+H55)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 53 | Plot No. 55 | 9mtr Road | Plot No. 57 |
| 55 | 55 | Plotted | NA | (J56+I56)/2*(G56+H56)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 54 | Block No. 891 | 9mtr Road | Plot No. 58 |
| 56 | 56 | Plotted | NA | (J57+I57)/2*(G57+H57)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 57 | Block No. 891 | Plot No. 55 | 9mtr Road |
| 57 | 57 | Plotted | NA | (J58+I58)/2*(G58+H58)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 58 | Plot No. 56 | Plot No. 54 | 9mtr Road |
| 58 | 58 | Plotted | NA | (J59+I59)/2*(G59+H59)/2 | 1162.08 | NA | 12.00 | 12.00 | 9.00 | 9.00 | Plot No. 59 | Plot No. 57 | Plot No. 53 | 9mtr Road |
| 59 | 59 | Plotted | NA | (J60+I60)/2*(G60+H60)/2 | 870.141025 | NA | 12.05 | 12.00 | 7.30 | 6.15 | 9mtr Road | Plot No. 58 | Plot No. 52 | 9mtr Road |
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Ground Clearance/Formation Of Plots | Yes | 01-03-2021 | 31-12-2022 |
| 2 | Formation Of Road, Footpath | Yes | 01-03-2021 | 31-12-2022 |
| 3 | Construction Of WaterSupply Infrastucture | Yes | 01-03-2021 | 31-12-2022 |
| 4 | Construction Of Sewage System Infrastucture | No | ||
| 5 | Power Supply Work(Tansformer And Substation) | No | ||
| 6 | Construction Of Storm Water Drainage | No | ||
| 7 | Solid Waste Management and Disposal | No | ||
| 8 | Tree Plantation And LandScape Work | No | ||
| 9 | Street Lighting | Yes | 01-08-2022 | 31-12-2023 |
| 10 | Other Miscellaneous Work | Yes | 01-01-2023 | 31-12-2024 |
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Electricity | Yes |
| 2 | Smart home automation | No |
| 3 | CCTV surveillance | No |
| 4 | Club House | No |
| 5 | Community Hall | No |
| 6 | Outdoor Sports facility | No |
| 7 | Indoor sports facility | No |
| 8 | Swimming Pools | No |
| 9 | Gym | No |
| 10 | Parks | Yes |
| 11 | Power Backup | No |
| 12 | Gas | No |
| 13 | Water and Sanitation | Yes |
| 14 | Air conditioning and incarnation | No |
| Total number of Plots | 59 |
| No. of Public and Semi Pubic Sites | 1 |
| Area of Public and Semi Pubic Sites(in Sq.m) | 608 |
| No. of Parks and Open Spaces | 1 |
| Area of Parks and Open Spaces(in Sq.m) | 762 |
| Area of Road/Transportation(in Sq.m) | 4135 |
| Project Start Date | 20-01-2021 |
| Project End Date | 31-03-2024 |
| If any extension of time has been granted | NO |
| Cost of land | 18600000 |
| Cost of construction | 15000000 |
| Total cost | 33600000 |
| Total amount collected From buyers | 27291545 |
| Whether any loan has been raised | NO |
| Total amount spent on Project for completion of the project | 27291545 |
| Total No of sites of Project | 59 |
| Total No of sites sold | 44 |
| Total No of sites unsold | 15 |
| Whether there is any changes in inventory details | NO |
| Appeals / FNH | NO APPEALS / FNH |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |


Ask Pulse Ai anything about real estate
News, Infographics, Blogs & More! Delivered to your inbox.