TANISHQA RESIDENCE
vizkon infratech
PLOT NO 3 AND 4 SARASWATIPURAM , KUSUGAL ROAD HUBLI
Approved
23rd May 2018
Completed
27th Oct 2017
Registration No.
PRM/KA/RERA/1259/410/PR/180523/001796
Acknowledgement No.
PR/KN/171114/002393
Project Type
Residential/Group Housing
Approving Authority
Hubbali-Dharwad Urban Development Authority
District
Dharwad
Taluka
Dharwad
State
Karnataka
Project Details
| Project Name | TANISHQA RESIDENCE |
| Project Description | A) FREE AMENITIES IN COMMON AREAS • Five capacity passenger lift to easy access to higher floors. • Corporation water supply with bore well, submersible pump & overhead tank. • Ample covered and uncovered concreted parking area, common for all. • Stand by generator for lights in common area, parking area, lift and pump room and Full security with all around compound wall and security watchman room. B) FREE AMENITIES IN INDIVIDUAL AREAS KITCHEN 1) L- Shaped / parallel black granite kitchen platform with stainless steel sink. 2) 2 feet dado above granite platform area of ceramic glazed tiles. SANITARY 1) All toilet C P Fixtures are of Crab Tree or similar TOILET FITINGS & ACCESSORIES 1) Ceramic glazed tiles dado upto 7” height. 2) Provision for geyser. 3) Sanitary ware of Hindware/Parryware or similar. ELECTRICAL 1) One TV point in the Living room. 2) Elegant Electrical switches Anchor, Legrand or Similar. 3) Telephone Point in living Area. 4) Fire resistant electrical wires of Finolex/Anchor make or equivalent. LIFT 1) Lift of standard make. 2) Elegant lift lobbies with tile cladding on lift side wall. |
| Project Type | Residential/Group Housing |
| Project Status | Completed |
| Project Start Date | 27-10-2015 |
| Proposed Project Completion Date | 27-10-2017 |
| Total Area Of Land (Sq Mtr) | 524 |
| Total Coverd Area (Sq Mtr) | 283 |
| Total Open Area (Sq Mtr) | 241 |
| Estimated Cost of Construction (INR) | 10233400 |
| Cost of Land (INR) | 930000 |
| Total Project Cost (INR) | 11500000 |
| Project Address | PLOT NO 3 AND 4 SARASWATIPURAM , KUSUGAL ROAD HUBLI |
| District | Dharwad |
| Taluk | Dharwad |
| Approving Authority | Hubbali-Dharwad Urban Development Authority |
| No of Garage for Sale | 0 |
| Area of Garage for Sale (Sq Mtr) | 0 |
| No of Parking for Sale | 10 |
| Area of Parking for Sale (Sq Mtr) | 269 |
| Type of Inventory | flat |
| No of Inventory | 16 |
| Carpet Area (Sq Mtr) | 913SqMtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 161SqMtr |
| Area of exclusive open terrace if any (Sq Mtr) | 228SqMtr |
| Road System | Local Authority |
| Water Supply | Local Authority |
| Sewege and Drainage System | Local Authority |
| Electricity Supply Transformer And Sub Station | Local Authority |
| Solid Waste Management And Disposal | Local Authority |
| Fire Fighting facility | Local Authority |
| Drinking Water Facility | Local Authority |
| Emergency Evacuation Services | Local Authority |
| Use of Renewable Energy | Local Authority |
| Bank Name | KOTAK MAHINDRA BANK |
| Branch | HUBLI |
| ifscCode | KKBK0000446 |
| Account No.(70% Account) | 0411995414 |
| State | Karnataka |
Promoter Details
| Promoter Type | Partnership Firm |
| Name | VINAY KUMAR BHEEMAYYA |
| PAN Number | AAM******* |
| Address | krishna nilaya plot no 2 , kandakur colony kusugal road hubli |
| District | Dharwad |
| State/UT | Karnataka |
| PIN Code | 580023 |
| Company Registration No. | 29AAMFV2461L1ZJ |
Modification Plan Details
| Type of Inventory | flat |
| No of Inventory | 16 |
| Carpet Area (Sq Mtr) | 913 Sq Mtr |
| Area of exclusive balcony/verandah (Sq Mtr) | 161 Sq Mtr |
| Area of exclusive open terrace if any (Sq Mtr) | 228 Sq Mtr |
Project Development Schedule
| Sl No | Project Work | Is Applicable ? | Estimated From Date | Estimated To Date |
|---|---|---|---|---|
| 1 | Earth work and other leveling preparation work | Yes | 02-05-2015 | 25-05-2015 |
| 2 | Foundation footing work | Yes | 30-05-2015 | 20-06-2015 |
| 3 | Retaining wall (All types) | Yes | 30-06-2015 | 30-07-2015 |
| 4 | Plinth level Beam | Yes | 15-08-2015 | 10-09-2015 |
| 5 | Sub-structure flooring (Parking Floor, more than one floor below general ground level) | Yes | 05-10-2015 | 25-10-2015 |
Amenities & Utilities Availability
| SlNo. | Work | Is Applicable ? |
|---|---|---|
| 1 | Water Supply | Yes |
| 2 | Internal Roads & Footpaths | No |
| 3 | Sewage and Drainage System | Yes |
| 4 | Parks & Tree planting | No |
| 5 | Street Lighting | No |
| 6 | Provision for community buildings and for treatment and disposal of sewage and sullage water | No |
| 7 | Solid waste management and disposal | No |
| 8 | Water conservation | No |
| 9 | Energy management | No |
| 10 | Fire protection and fire safety requirements | No |
| 11 | Education/Health/Other public amenities | No |
Post Registration Details
| FAR Sanctioned | 1.74 |
| Number of Towers | 1 |
| 0 | 4 |
| 1 | 4 |
| 2 | 4 |
| 3 | 4 |
| Total No of Units | 16 |
Completion Details
| Name | Insurance |
Appeals & Complaints
| Appeals / FNH | NO APPEALS / FNH |
| Complaints on Promoter | No Complaints Found. |
| Complaints on Project | No Complaints Found. |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Bangalore


Ask Pulse Ai anything about real estate





