Integrated Residential Township Phase-5A
Omaxe New Chandigarh Developers Private Ltd. (Other than Individual)
Omaxe New Chandigarh , Kharar , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140901
Approved
1st Sept 2018
Completed
31st Aug 2020
Registration No.
PBRERA-SAS80-PR0400
Project Type
(1) Residential (Plotted Development)
Approving Authority
Mukesh Bhati
District
Sahibzada Ajit Singh Nagar (Mohali)
Project Cost
₹24,94,13,000
State
Punjab
Project Details
| Project Name | Integrated Residential Township Phase-5A |
| Project Address | Omaxe New Chandigarh , Kharar , Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140901 |
| Project Amenities | Project Approved by PUDA, 24 hours power back up facility, Site is on 100 ft wide sector road, Wide road with comfortable traffic circulation and other amenities |
| Project Zone | Zone 1 - Master Plan Area of S.A.S. Nagar, New Chandigarh and Zirakpur. |
| Type of Project | (1) Residential (Plotted Development) |
| Project Status | Completed |
| Project Cost (in rupees) | 249413000.00 (INR) |
| Project Start Date | 01-Sep-2018 |
| Proposed/ Expected Date of Project Completion as specified in Form B | 31-Aug-2020 |
| Project Web Link | www.omaxe.com |
| Mega Project (Yes/No) | Yes |
| Specification Details of Proposed Project as per the Brochure/ Prospectus | 1. Structure :- NA 2. Flooring :- NA 3. Wall Finishing :- NA 4. Sanitary Fittings :- NA 5. Electrical Fittings :- NA 6. Kitchen :- NA |
| Authorized Person for Communication with regards to Project | Mukesh Bhati Omaxe India Trade Tower, First Floor, Chd-Siswan Road, , New Chandigarh, District SAS Nagar (Mohali) Sahibzada Ajit Singh Nagar (Mohali) , Punjab - 140901 E-Mail: muk********[at]omaxe.com Mobile Phone: 98******** |
| Bank Name | YES Bank Limited |
| Branch Name | South Extension Par II, New Delhi |
| Bank Account Number | 001672400000319 |
| Bank IFSC Code | YESB00000016 |
| Account Holder Name | Omaxe New Chandigarh Developers Pvt. Ltd. Ph 5A |
| Bank Address | Yes Bank, South Extension Par II, , New Delhi New Delhi , Delhi - 110049 |
| Total Area of Land Proposed to be developed (in sqr mtrs) | 40019.005 (in sqr mtrs) |
| Area of Land Owned by Promoter | 40019.005 (in sqr mtrs) |
| Area of Land Not Owned by Promoter | 0 (in sqr mtrs) |
| Area under group housing development excluding common areas and ameneties | 0 (in sqr mtrs) |
| Area under residential plotted development excluding common areas and ameneties | 24315.06 (in sqr mtrs) |
| Area under commercial development excluding common areas and ameneties | 0 (in sqr mtrs) |
| Area under industrial development excluding common areas and ameneties | 0 (in sqr mtrs) |
| Area under common amenties servicing the entire project | 15703.945 (in sqr mtrs) |
Promoter Details
| Name of Organization | Omaxe New Chandigarh Developers Private Ltd. |
| Type of Organization | Private Limited Company |
| Main Objects of Organization | Real Estate Actvities i.e. Constrcution, Development, Sale Purchase etc Civil Contractor, Colonizer, Builder |
| Registered Address of Organization | 10, Local Shopping Center, , Kalkaji South Delhi , Delhi - 110019 |
| Official Address | 10 Local Shopping Center, Kalkaji , Kalkaji South Delhi , Delhi - 110019 |
| Years of Experience of Promoter in Real Estate Development in Punjab | 12 (in years) |
| Years of Experience of Promoter in Real Estate Development in Other states or UTs | 12 (in years) |
| WebLink (Promoter/Parent-Entity) | Not Available |
Promoter Members
| Sr.No | Designation | Name of Member | Official Address |
|---|---|---|---|
| 1 | Chief Executive Officer | Bhupendra Singh | B-16 Ist Floor , East of Kailsh South Delhi , Delhi - 110065 Email: bhu***********[at]omaxe.com |
| 2 | DIRECTOR | BHUPENDRA SINGH | B-16, 1ST FLOOR EAST OF KAILASH , NEW DELHI South Delhi , Delhi - 110065 Email: bhu***********[at]omaxe.com |
| 3 | Chief Financial Officer | Serve Mitter Kamboj | H.No. 1482 , Ground Floor, Secto-42B Chandigarh , Chandigarh - 160036 Email: ser********[at]omaxe.com |
| 4 | Director | Dheeraj Agrawal | H.no 1628,gali no. 6, sanjay enclave nangla road , Faridabad , haryana ,121005 , Faridabad , Haryana - 121005 Email: dhe***********[at]omaxe.com |
| 5 | NON EXECUTIVE INDEPENDENT DIRECTOR | Nishal Jain | B-22, friends colony,west , nehru nagar south delhi 110065 , South Delhi , Delhi - 110065 Email: nis*******[at]hotmail.com |
| 6 | Director | Shalini Barathi | C-628, GF Back Portion, Near Gurudwara, New Friends Colony , New Delhi New Delhi , Delhi - 110025 Email: sha***********[at]omaxe.com |
Building / Tower / Block
| Sr.No | Building/Tower/Block Name | Number of Floor/Plots related to Building/ Tower/ Block |
|---|---|---|
| 1 | 1121A | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 2 | 1121B | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 3 | 1146A | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 4 | 1146B | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 5 | 1146C | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 6 | 1146D | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 7 | 1147A | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 8 | 1147B | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 9 | 1147C | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 10 | 1147D | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 11 | 1147E | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 12 | 1147F | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 13 | 1174A | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 14 | 1174B | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 15 | 1174C | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 16 | 1175A | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 17 | 1175B | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 18 | 1175C | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 19 | 1194A | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 20 | 1194B | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 21 | 1194C | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 22 | 1194D | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 23 | 1194E | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 24 | 1195A | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 25 | 1195B | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 26 | 1195C | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 27 | 1195D | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 28 | 1195E | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 29 | 1208A | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 30 | 1208B | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 31 | 1208C | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 32 | 1189A | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 33 | 1189B | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 34 | 1189C | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 35 | 1189D | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 36 | 1189E | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 37 | 1189F | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 38 | 1200A | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 39 | 1200B | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 40 | 1200C | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 41 | 1200D | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 42 | 1200E | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 43 | 1200F | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 44 | 1201A | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 45 | 1201B | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 46 | 1201C | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 47 | 1201D | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 48 | 1201E | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 49 | 1201F | Number of Floor/Plots Currently Sanctioned: 1 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 50 | PART-F | Number of Floor/Plots Currently Sanctioned: 76 Number of Floor/Plots Proposed: 76 Number of Floors Constructed: 0 |
| 51 | PART F | Number of Floor/Plots Currently Sanctioned: 0 Number of Floor/Plots Proposed: 53 Number of Floors Constructed: 0 |
| 52 | PART F | Number of Floor/Plots Currently Sanctioned: 0 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 53 | PART F | Number of Floor/Plots Currently Sanctioned: 0 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 54 | PART F | Number of Floor/Plots Currently Sanctioned: 0 Number of Floor/Plots Proposed: 40 Number of Floors Constructed: 0 |
| 55 | PART F | Number of Floor/Plots Currently Sanctioned: 0 Number of Floor/Plots Proposed: 15 Number of Floors Constructed: 0 |
| 56 | PART F | Number of Floor/Plots Currently Sanctioned: 0 Number of Floor/Plots Proposed: 7 Number of Floors Constructed: 0 |
| 57 | PART F | Number of Floor/Plots Currently Sanctioned: 0 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 58 | PART F | Number of Floor/Plots Currently Sanctioned: 0 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
| 59 | PART F | Number of Floor/Plots Currently Sanctioned: 0 Number of Floor/Plots Proposed: 1 Number of Floors Constructed: 0 |
Plot / Apartment Configuration
| Sr.No | Type of Apartment/ Shop/ Plot | Total Number of Apartment/ Shop/ Plot | Carpet Area of Apartment/ Shop/ Plot |
|---|---|---|---|
| 1 | Residential | 1 | 131.57 (in sqr mtrs) |
Professionals
| Sr.No | Name of Professional | Associated Consultant Type | Name & Year of Establishment of Promoter | Name & Profile of Key Projects Completed |
|---|---|---|---|---|
| 1 | APURBA BOHRA | Architect | not applicable | Silver Birch Cassia Ambrosia Mulberry Villa SCO Plots Booth Plots Clockton High Street |
| 2 | T D ANEJA | Structural Engineer | NOT APPLICABLE | Silver Birch Cassia Ambrosia Mulberry Villa SCO Plots Booth Plots Clockton High Street |
| 3 | BANSAL DEVELOPERS | Real Estate Agent PBRERA-HRY06-REA0031 | NOT APPLICABLE | Silver Birch, Cassia, Ambrosia, Mulberry Villa, Clockton High Street Built up SCO and Booths Comm. |
| 4 | APEX REALTY SOLUTIONS | Real Estate Agent PBRERA-SAS79-REA0220 | NOT APPLICABLE | Silver Birch, Cassia, Ambrosia, Mulberry Villa, Clockton High Street Built up SCO and Booths Comm. |
| 5 | MANNAT EASTATE | Real Estate Agent PBRERA-CHD04-REA0123 | NOT APPLICABLE | Silver Birch, Cassia, Ambrosia, Mulberry Villa, Clockton High Street Built up SCO and Booths Comm. |
| 6 | RE CONSULT ADVISORY SERVICES | Real Estate Agent PBRERA-SAS79-REA0339 | NOT APPLICABLE | Silver Birch, Cassia, Ambrosia, Mulberry Villa, Clockton High Street Built up SCO and Booths Comm. |
| 7 | SHRI LAKSHMI REALTECH | Real Estate Agent PBRERA-SAS79-REA0465 | NOT APPLICABLE | Silver Birch, Cassia, Ambrosia, Mulberry Villa, Clockton High Street Built up SCO and Booths Comm. |
| 8 | DNA REALTORS | Real Estate Agent PBRERA-SAS79-REA0314 | NOT APPLICABLE | Silver Birch, Cassia, Ambrosia, Mulberry Villa, Clockton High Street Built up SCO and Booths Comm. |
| 9 | KALRA REALTECH | Real Estate Agent PBRERA-HRY06-REA0007 | NOT APPLICABLE | Silver Birch, Cassia, Ambrosia, Mulberry Villa, Clockton High Street Built up SCO and Booths Comm. |
| 10 | KARAM NATH DUGGAL | Real Estate Agent PBRERA-CHD04-REA0055 | NOT APPLICABLE | Silver Birch, Cassia, Ambrosia, Mulberry Villa, Clockton High Street Built up SCO and Booths Comm. |
| 11 | MAJESTIC RISE REALTORS | Real Estate Agent PBRERA-SAS80-REA0378 | NOT APPLICABLE | Silver Birch, Cassia, Ambrosia, Mulberry Villa, Clockton High Street Built up SCO and Booths Comm. |
| 12 | ARIHANT PROPERTIES | Real Estate Agent PBRERA-CHD04-REA0079 | NOT APPLICABLE | Silver Birch, Cassia, Ambrosia, Mulberry Villa, Clockton High Street Built up SCO and Booths Comm. |
| 13 | NAKSHATRA ESTATES | Real Estate Agent PBRERA-SAS81-REA0078 | NOT APPLICABLE | Silver Birch, Cassia, Ambrosia, Mulberry Villa, Clockton High Street Built up SCO and Booths Comm. |
| 14 | FORTE REALTORS | Real Estate Agent PBRERA-CHD04-REA0078 | NOT APPLICABLE | Silver Birch, Cassia, Ambrosia, Mulberry Villa, Clockton High Street Built up SCO and Booths Comm. |
Quarterly Updates
| Sr.No. | Quarter Name | Quarter Year | Reference Number | Reference Date |
|---|---|---|---|---|
| 1 | QTR-II (April-June) | 2020 | QUP2020S20201081 | 31-Aug-2020 |
| 2 | QTR-III (July-September) | 2020 | QUP2020T20201160 | 27-Nov-2020 |
| 3 | QTR-IV (October-December) | 2020 | QUP2020L20210236 | 01-Mar-2021 |
| 4 | QTR-I (January-March) | 2021 | QUP2021F20210894 | 13-May-2021 |
| 5 | QTR-II (April-June) | 2021 | QUP2021S20211199 | 22-Jul-2021 |
| 6 | QTR-III (July-September) | 2021 | QUP2021T20212125 | 30-Oct-2021 |
| 7 | QTR-IV (October-December) | 2021 | QUP2021L20220475 | 18-Feb-2022 |
| 8 | QTR-I (January-March) | 2022 | QUP2022F20220934 | 25-Apr-2022 |
| 9 | QTR-II (April-June) | 2022 | QUP2022S20221637 | 30-Jul-2022 |
| 10 | QTR-III (July-September) | 2022 | QUP2022T20222238 | 05-Nov-2022 |
| 11 | QTR-IV (October-December) | 2022 | QUP2022L20230353 | 19-Jan-2023 |
| 12 | QTR-I (January-March) | 2023 | QUP2023F20231788 | 05-May-2023 |
| 13 | QTR-II (April-June) | 2023 | QUP2023S20233060 | 24-Jul-2023 |
| 14 | QTR-III (July-September) | 2023 | QUP2023T20234291 | 19-Oct-2023 |
| 15 | QTR-IV (October-December) | 2023 | QUP2023L20240305 | 20-Jan-2024 |
| 16 | QTR-I (January-March) | 2024 | QUP2024F20241226 | 30-Apr-2024 |
| 17 | QTR-II (April-June) | 2024 | QUP2024S20241850 | 13-Jul-2024 |
| 18 | QTR-III (July-September) | 2024 | QUP2024T20242544 | 10-Oct-2024 |
| 19 | QTR-IV (October-December) | 2024 | QUP2024L20250175 | 09-Jan-2025 |
| 20 | QTR-I (January-March) | 2025 | QUP2025F20251211 | 13-Apr-2025 |
| 21 | QTR-II (April-June) | 2025 | QUP2025S20252030 | 10-Jul-2025 |
| 22 | QTR-III (July-September) | 2025 | QUP2025T20253688 | 12-Oct-2025 |
| 23 | QTR-IV (October-December) | 2025 | QUP2025L20260312 | 12-Jan-2026 |
| 24 | QTR-I (January-March) | 2026 | QUP2026F20261372 | 11-Apr-2026 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in
Top Properties in Mohali


Ask Pulse Ai anything about real estate