New Launch - India Real Estate Report 2026.

APARNA KANOPY BLUEBELLS

APARNA CONSTRUCTIONS AND ESTATES PVT LTD

BANJARA HILLS

RERA approved

Approved

13th Aug 2025

Completion pending

Pending

12th Aug 2030

Registration No.

P02200010755

Project Type

Residential

Approving Authority

HMDA

District

Hyderabad

Taluka

KHAIRTABAD

State

Telangana

Project Details

Registration No.P02200010755
Certificate No.P02200010755
Project StatusNew Project
Project TypeResidential
Authority NameHMDA
Plan Approval No.004387/BP/HMDA/0941/MED/2024
Proposed Completion2030-08-12
DistrictHyderabad
MandalKHAIRTABAD
StreetGUNDLAPOCHAMPALLY
LocalityBANJARA HILLS
Pin Code500034
Last Modified2026-03-18

Land Details

Sy.No./TS No.SY NO 446(P),447(P) & 449(P)
Plot No./House No.Total Area(In sqmts)
Total Area (sqmts)14890.22
Net Area (sqmts)14890.22
Total Building Units3
Approved Built-up Area52822.03
Boundaries East24 mts wide road
Boundaries WestAparna Kanopy Tulips Project
Boundaries NorthSy no 446 P 447 P
Boundaries SouthSy no 449 P

Parking

SANNAREDDY SUBRAMANYAM REDDYManaging Director
VENKATESWAR REDDY CHENNURUDirector
SANNAREDDY SUBRAMANYAM REDDY_1Authorized Signatory

Construction Progress

Sr.No.Task/Activity% Completed
1Excavation0
2X number of Basement(s) and Plinth0
3X number of Podiums0
4Stilt Floor0
5X number of Slabs of Super Structure0
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0
11Overall Percentage of Completion of the work done For the entire Building /Wing0
1Excavation0
2X number of Basement(s) and Plinth0
3X number of Podiums0
4Stilt Floor0
5X number of Slabs of Super Structure0
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0
11Overall Percentage of Completion of the work done For the entire Building /Wing0
1Excavation0
2X number of Basement(s) and Plinth0
3X number of Podiums0
4Stilt Floor0
5X number of Slabs of Super Structure0
6Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises0
7Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises0
8Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.0
9The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing0
10Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate0
11Overall Percentage of Completion of the work done For the entire Building /Wing0

The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in

Top Properties in Warangal

Pexo Icon

Ask Pulse Ai anything about real estate

Unlock the Latest in Real Estate

News, Infographics, Blogs & More! Delivered to your inbox.

Proptech Pulse Logo

Data that drives action.
Insight that inspires action.
Technology that empowers action.“

Made with Love

Statue

© PropTech Pulse 2026, All rights reserved.

Terms of Use and Privacy Policy