APARNA SAROVAR ZICON
APARNA INFRAHOUSING PRIVATE LIMITED
BANJARA HILLS
Approved
22nd Jan 2021
Pending
22nd Jan 2027
Registration No.
P02400002673
Project Type
Residential
Approving Authority
GHMC
District
Hyderabad
Taluka
Village/City/Town
State
Telangana
Project Details
| Registration No. | P02400002673 |
| Certificate No. | P02400002673 |
| Project Status | New Project |
| Project Type | Residential |
| Authority Name | GHMC |
| Plan Approval No. | 1/C20/00781/2021 |
| Proposed Completion | 2027-01-22 |
| District | Hyderabad |
| Mandal | Village/City/Town |
| Street | Nallagandla Village |
| Locality | BANJARA HILLS |
| Pin Code | 500034 |
| Last Modified | 2026-04-14 |
Land Details
| Sy.No./TS No. | 264 to 272, and 279, 280, 281(P), 282(P), 283 and 284(P) |
| Plot No./House No. | Total Area(In sqmts) |
| Total Area (sqmts) | 103184.84 |
| Net Area (sqmts) | 97857.59 |
| Total Building Units | 14 |
| Approved Built-up Area | 416194.9 |
| Mortgage Area | 59188.72 |
| Boundaries East | Neighbours |
| Boundaries West | Aparna Sarovar Grande Project |
| Boundaries North | Aparna Sarovar Zenith Project |
| Boundaries South | Aparna Sarovar Project |
Parking
| SUBRAMANYAM REDDY SANNAREDDY | Director |
| SUBRAMANYAM REDDY SANAREDDY | Authorized Signatory |
| VENKATESWARA REDDY CHENNURU | Director |
| VENKATESWARA REDDY CHENNURU_1 | Authorized Signatory |
Construction Progress
| Sr.No. | Task/Activity | % Completed |
|---|---|---|
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 36 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 30 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 81 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 98 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 66 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 72 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 35 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 82 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 98 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 57 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 63 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 20 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 74 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 90 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 66 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 100 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 100 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 100 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 100 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 100 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 99 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 90 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 100 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 100 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 90 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 96 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 91 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 100 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 100 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 91 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 95 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 85 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 100 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 100 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 91 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 95 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 85 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 100 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 100 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 92 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 99 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 100 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 100 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 100 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 100 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 100 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 100 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 100 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 100 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 100 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 100 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 100 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 100 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 100 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 100 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 100 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 100 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 100 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 100 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 100 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 100 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 100 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 100 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 100 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 100 |
| 1 | Excavation | 100 |
| 2 | X number of Basement(s) and Plinth | 100 |
| 3 | X number of Podiums | 100 |
| 4 | Stilt Floor | 0 |
| 5 | X number of Slabs of Super Structure | 100 |
| 6 | Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | 100 |
| 7 | Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | 100 |
| 8 | Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | 100 |
| 9 | The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | 100 |
| 10 | Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | 100 |
The information provided on this page is collated from publicly available resources. PropTech Pulse does not guarantee the accuracy, completeness, or authority of this data and shall not be held liable for any discrepancies. For queries or further assistance, please contact us at pulse@aurumproptech.in